Text

OFFICIAL COPY

  • 's 7

a

EG

j 'UNITED

STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

JUN 2 6 19 81

Duke Power Company

ATTN:

Mr. W. 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 2178

Charlotte, NC

28242

Gentlemen:

Subject: Report Nos. 50-269-/81-10, 50-270/81-10 and 50-287/81-10

This refers to the routine safety inspection conducted by Mr.

F. Jape of this

office on May 10,

1981 through June 10,

1981,

of activities authorized by NRC

Operating License Nos. DPR-38, DPR-47 and DPR-55 for the Oconee Nuclear Station

facility. Our preliminary findings were discussed with Mr. J. E. Smith, Station

Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas,

the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements

are listed in the Notice of Violation enclosed herewith as

Appendix A. Elements to

be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it

is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(1),

such application must

be accompanied

by

an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it

is claimed that the information should be withheld from public

disclosure. This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

8108040593 810723'

PDR ADOCK 05000269

a

PDR,

JUN 26 1981

Duke Power Company

2

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within the

specified periods.noted above, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

1aul

J. elloggA

ng Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 269/81-10, 270/81-10 and 287/81-10

cc w/encl:

J. E. Smith, Station Manager