ML15224A409
| ML15224A409 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/26/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML15224A406 | List: |
| References | |
| NUDOCS 8108040593 | |
| Download: ML15224A409 (2) | |
See also: IR 05000269/1981010
Text
OFFICIAL COPY
- 's 7
a
EG
j 'UNITED
STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
JUN 2 6 19 81
Duke Power Company
ATTN:
Mr. W. 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178
Charlotte, NC
28242
Gentlemen:
Subject: Report Nos. 50-269-/81-10, 50-270/81-10 and 50-287/81-10
This refers to the routine safety inspection conducted by Mr.
F. Jape of this
office on May 10,
1981 through June 10,
1981,
of activities authorized by NRC
Operating License Nos. DPR-38, DPR-47 and DPR-55 for the Oconee Nuclear Station
facility. Our preliminary findings were discussed with Mr. J. E. Smith, Station
Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas,
the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements
are listed in the Notice of Violation enclosed herewith as
Appendix A. Elements to
be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it
is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information. If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1),
such application must
be accompanied
by
an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it
is claimed that the information should be withheld from public
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
8108040593 810723'
PDR ADOCK 05000269
a
PDR,
JUN 26 1981
Duke Power Company
2
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit. If we do not hear from you in this regard within the
specified periods.noted above, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
1aul
J. elloggA
ng Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 269/81-10, 270/81-10 and 287/81-10
cc w/encl:
J. E. Smith, Station Manager