ML15224A384

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/81-07,50-270/81-07 & 50-287/81-07 on 810310-0410 & Notice of Violation
ML15224A384
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/01/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15224A379 List:
References
NUDOCS 8107080515
Download: ML15224A384 (2)


See also: IR 05000269/1981007

Text

0EG

UNITED STATES

I-

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

MAY 0 1 1981

Duke Power Company

ATTN:

W. 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 2178

Charlotte, NC

28242

Gentlemen:

Subject: Report Nos. 50-269/81-7, 50-270/81-7 and 50-287/81-7

This refers to the routine safety inspection conducted by F. Jape of this office

on March 10 - April

10,

1981, of activities authorized by NRC License Nos.

DPR-38,

DPR-47 and DPR-55 for the Oconee Nuclear Station facility.

Our pre

liminary findings were discussed with J.

E. Smith at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

S During the inspection, it

was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements

are listed in the Notice of Violation enclosed herewith as

Appendix A. Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

Several new unresolved items are identified in the enclosed inspection report.

These items will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC "Rules of Practice," Part 2, Title

10,

Code of Federal

Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC Public Document Room.

If this report

contains any information that you believe to be proprietary, it is necessary that

you make a written application within 20 days to this office to withhold such

information from public disclosure. Any such application must include the basis

for claiming that the information is proprietary and the proprietary information

should be contained in a separate part of the document. If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

8107080515 810618

PDR ADOCK 050002691

G

PDR

MAY00

10$

Duke Power Company

2

MAY

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

R. C. ws, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosures:

1. Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-269/81-07

50-270/81-07 and 50-287/81-07

cc w/encl:

J. E. Smith, Station Manager

SII

SI