p~ REG~j

0

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

CD

MAY 2 0 1981

Duke Power Company

ATTN:

W. 0. Parker, Jr.

IE FILE COPVE

Vice President, Steam Production

P. 0. Box 2178

Charlotte, NC

28242

Gentlemen:

Subject: Report Nos. 50-269/81-09, 50-270/81-09, and 50-287/81-09

This refers to the routine safety inspection conducted by Mr. F. Jape of this

office on April 10,

-

May 10,

1981,

of activities authorized by NRC Operating

License Nos. DPR-38,

DPR-47,

and DPR-55 for the Oconee Nuclear facility and to

the discussion of our findings held with Mr. J. E. Smith, Station Manager at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items.

The status of these items is discussed

in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report.

This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the letter or report contains any information that you believe to be exempt

from disclosure under 10 CFR 9.5(a)(4)., it

is necessary that you:

(a) notify

this office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(1),

such application must be

accompanied

by

an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons for claiming

that the information should be withheld from public disclosure.

This section

further requires the statement to address with specificity the considerations

listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be

aloe 1'1'

MAY 2 01981

Duke Power Company

2

incorporated as far as possible into a separate part of the affidavit. If we do

not hear from you in this regard within the specified periods noted above,

the

report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

R. C. L

,

cting Director

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report Nos. 50-269/81-09,

50-270/81-09, and 50-287/81-09

cc w/encl:

J. E. Smith, Station Manager