NRC000185
Submitted: August 10, 2015
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BLVD., SUITE 100
KING OF PRUSSIA, PA 19406-2713
March 4, 2015
Mr. Larry Coyle
Site Vice President
Entergy Nuclear Operations, Inc.
Indian Point Energy Center
450 Broadway, GSB
P.O. Box 249
Buchanan, NY 10511-0249
SUBJECT: ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR
GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND
Dear Mr. Coyle:
On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-
cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The
NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection
results and enforcement actions from January 1, 2014 through December 31, 2014. This letter
informs you of the NRCs assessment of your facility during this period and its plans for future
inspections at your facility.
The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that
preserved public health and safety and met all cornerstone objectives. The NRC determined
the performance at Indian Point Units 2 and 3 during the most recent quarter was within the
Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix
because all inspection findings had very low (i.e., Green) safety significance, and all PIs
indicated that your performance was within the nominal, expected range (i.e., Green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine
inspections performed by resident inspectors are not included in the inspection plan. The
inspections listed during the last nine months of the inspection plan are tentative and may be
revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will
perform inspection procedure (IP) 60855, Operation of an Independent Spent Fuel Storage
Installation at Operating Plants, IP 92702, Follow-up on Corrective Actions for Violations, and
Temporary Instruction 2516-001, Review of License Renewal Activities. The NRC provides
the inspection plan to allow for the resolution of any scheduling conflicts and personnel
availability issues. The NRC will contact you as soon as possible to discuss changes to the
inspection plan should circumstances warrant any changes. This inspection plan does not
include security-related inspections, which will be sent via separate, non-publicly available
correspondence.
L. Coyle 2
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules
of Practice, a copy of this letter will be available electronically for public inspection in the NRC
Public Document Room or from the Publicly Available Records component of NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Please contact me at (610)337-5069 with any questions you have regarding this letter.
Sincerely,
/RA/
Arthur L. Burritt, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Docket Nos. 50-247 and 50-286
License Nos. DPR-26 and DPR-64
Enclosure: Indian Point 2 & 3 Inspection/Activity Plan
cc w/encl: Distribution via ListServ
Non-Sensitive Publicly Available
SUNSI Review
Sensitive Non-Publicly Available
OFFICE RI/DRP RI/DRP
NAME TSetzer/TCS ABurritt/ALB
DATE 02/23/15 03/02/15
Page 1 of 2 Indian Point
03/02/2015 15:16:39 Inspection / Activity Plan
Report 22
01/01/2015 - 06/30/2016
Unit Planned Dates No. of Staff
Number Start End Inspection Activity Title on Site
5/11EXAM - U3 INITIAL OL EXAM 5
3 04/13/2015 04/17/2015 U01908 FY15-IP3 INITIAL OPERATOR LICENSING EXAM
3 05/11/2015 05/15/2015 U01908 FY15-IP3 INITIAL OPERATOR LICENSING EXAM
71124 - RETS 1
2, 3 02/09/2015 02/13/2015 IP 71124.05 Radiation Monitoring Instrumentation
2, 3 02/09/2015 02/13/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment
71124 - HP 1
3 03/02/2015 03/06/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
3 03/02/2015 03/06/2015 IP 71124.02 Occupational ALARA Planning and Controls
7111108P - U3 INSERVICE INSPECTION 1
3 03/09/2015 03/20/2015 IP 7111108P Inservice Inspection Activities - PWR
71152 - GROUNDWATER MONITORING 5
2 05/04/2015 05/07/2015 IP 71152 Problem Identification and Resolution
71124 - HP 1
2, 3 05/07/2015 05/13/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
2, 3 05/07/2015 05/13/2015 IP 71124.02 Occupational ALARA Planning and Controls
7111107T - TRIENNIAL HEAT SINK 1
2, 3 07/06/2015 07/10/2015 IP 7111107T Heat Sink Performance
CDBI - COMPONENT DESIGN BASIS INSPECTION 8
2, 3 07/20/2015 07/24/2015 IP 7111121 Component Design Bases Inspection
2, 3 08/03/2015 08/07/2015 IP 7111121 Component Design Bases Inspection
2, 3 08/17/2015 08/21/2015 IP 7111121 Component Design Bases Inspection
7111111B - IP3 REQUAL INSP W/ P/F RESULTS 2
3 09/21/2015 09/25/2015 IP 7111111B Licensed Operator Requalification Program
71124 - HP 1
2, 3 08/10/2015 08/14/2015 IP 71124.04 Occupational Dose Assessment
2, 3 08/10/2015 08/14/2015 IP 71124.05 Radiation Monitoring Instrumentation
2, 3 08/10/2015 08/14/2015 IP 71151 Performance Indicator Verification
2, 3 08/17/2015 08/21/2015 IP 7111402 Alert and Notification System Testing
2, 3 08/17/2015 08/21/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System
2, 3 08/17/2015 08/21/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure
Page 2 of 2 Indian Point
03/02/2015 15:16:39 Inspection / Activity Plan
Report 22
01/01/2015 - 06/30/2016
Unit Planned Dates No. of Staff
Number Start End Inspection Activity Title on Site
ISFSI - ISFSI LOADING INSPECTION 2
2, 3 08/17/2015 08/21/2015 IP 60855 Operation Of An ISFSI
2 08/17/2015 08/21/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
2516-001 - TI 2516-001 U3 LR COMMITMENTS INSPECTION 1
3 11/16/2015 11/20/2015 IP 2516/001 Review of License Renewal Activities
71124.08 - RADWASTE 1
2, 3 11/16/2015 11/20/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
71152B - PI&R - BIENNIAL 4
2, 3 11/30/2015 12/04/2015 IP 71152B Problem Identification and Resolution
2, 3 12/14/2015 12/18/2015 IP 71152B Problem Identification and Resolution
71124 - HP 1
2 03/07/2016 03/11/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
2 03/07/2016 03/11/2016 IP 71124.02 Occupational ALARA Planning and Controls
ISI - U2 INSERVICE INSPECTION 1
2 03/14/2016 03/25/2016 IP 7111108P Inservice Inspection Activities - PWR
2, 3 06/27/2016 07/01/2016 IP 7111401 Exercise Evaluation
TRI FI - TRIENNIAL FIRE PROTECTION 4
2, 3 05/23/2016 05/27/2016 IP 7111105T Fire Protection [Triennial]
2, 3 06/06/2016 06/10/2016 IP 7111105T Fire Protection [Triennial]
2, 3 06/20/2016 06/24/2016 IP 71124.07 Radiological Environmental Monitoring Program
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure