NRC000185 - Letter from Arthur Burritt, NRC, to Larry Coyle, Entergy, Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)
ML15223A770
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/04/2015
From:
NRC/OGC
To:
SECY RAS
References
RAS 28147, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR
Download: ML15223A770 (5)


See also: IR 05000247/2014001

Text

NRC000185

Submitted: August 10, 2015

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD., SUITE 100

KING OF PRUSSIA, PA 19406-2713

March 4, 2015

Mr. Larry Coyle

Site Vice President

Entergy Nuclear Operations, Inc.

Indian Point Energy Center

450 Broadway, GSB

P.O. Box 249

Buchanan, NY 10511-0249

SUBJECT: ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR

GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND

05000286/2014001)

Dear Mr. Coyle:

On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-

cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The

NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection

results and enforcement actions from January 1, 2014 through December 31, 2014. This letter

informs you of the NRCs assessment of your facility during this period and its plans for future

inspections at your facility.

The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that

preserved public health and safety and met all cornerstone objectives. The NRC determined

the performance at Indian Point Units 2 and 3 during the most recent quarter was within the

Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix

because all inspection findings had very low (i.e., Green) safety significance, and all PIs

indicated that your performance was within the nominal, expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the last nine months of the inspection plan are tentative and may be

revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will

perform inspection procedure (IP) 60855, Operation of an Independent Spent Fuel Storage

Installation at Operating Plants, IP 92702, Follow-up on Corrective Actions for Violations, and

Temporary Instruction 2516-001, Review of License Renewal Activities. The NRC provides

the inspection plan to allow for the resolution of any scheduling conflicts and personnel

availability issues. The NRC will contact you as soon as possible to discuss changes to the

inspection plan should circumstances warrant any changes. This inspection plan does not

include security-related inspections, which will be sent via separate, non-publicly available

correspondence.

L. Coyle 2

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules

of Practice, a copy of this letter will be available electronically for public inspection in the NRC

Public Document Room or from the Publicly Available Records component of NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Please contact me at (610)337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Arthur L. Burritt, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Docket Nos. 50-247 and 50-286

License Nos. DPR-26 and DPR-64

Enclosure: Indian Point 2 & 3 Inspection/Activity Plan

cc w/encl: Distribution via ListServ

ML15061A401

Non-Sensitive Publicly Available

SUNSI Review

Sensitive Non-Publicly Available

OFFICE RI/DRP RI/DRP

NAME TSetzer/TCS ABurritt/ALB

DATE 02/23/15 03/02/15

Page 1 of 2 Indian Point

03/02/2015 15:16:39 Inspection / Activity Plan

Report 22

01/01/2015 - 06/30/2016

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

5/11EXAM - U3 INITIAL OL EXAM 5

3 04/13/2015 04/17/2015 U01908 FY15-IP3 INITIAL OPERATOR LICENSING EXAM

3 05/11/2015 05/15/2015 U01908 FY15-IP3 INITIAL OPERATOR LICENSING EXAM

71124 - RETS 1

2, 3 02/09/2015 02/13/2015 IP 71124.05 Radiation Monitoring Instrumentation

2, 3 02/09/2015 02/13/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment

71124 - HP 1

3 03/02/2015 03/06/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

3 03/02/2015 03/06/2015 IP 71124.02 Occupational ALARA Planning and Controls

7111108P - U3 INSERVICE INSPECTION 1

3 03/09/2015 03/20/2015 IP 7111108P Inservice Inspection Activities - PWR

71152 - GROUNDWATER MONITORING 5

2 05/04/2015 05/07/2015 IP 71152 Problem Identification and Resolution

71124 - HP 1

2, 3 05/07/2015 05/13/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

2, 3 05/07/2015 05/13/2015 IP 71124.02 Occupational ALARA Planning and Controls

7111107T - TRIENNIAL HEAT SINK 1

2, 3 07/06/2015 07/10/2015 IP 7111107T Heat Sink Performance

CDBI - COMPONENT DESIGN BASIS INSPECTION 8

2, 3 07/20/2015 07/24/2015 IP 7111121 Component Design Bases Inspection

2, 3 08/03/2015 08/07/2015 IP 7111121 Component Design Bases Inspection

2, 3 08/17/2015 08/21/2015 IP 7111121 Component Design Bases Inspection

7111111B - IP3 REQUAL INSP W/ P/F RESULTS 2

3 09/21/2015 09/25/2015 IP 7111111B Licensed Operator Requalification Program

71124 - HP 1

2, 3 08/10/2015 08/14/2015 IP 71124.04 Occupational Dose Assessment

2, 3 08/10/2015 08/14/2015 IP 71124.05 Radiation Monitoring Instrumentation

2, 3 08/10/2015 08/14/2015 IP 71151 Performance Indicator Verification

EP - EP PROGRAM INSPECTION 1

2, 3 08/17/2015 08/21/2015 IP 7111402 Alert and Notification System Testing

2, 3 08/17/2015 08/21/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System

2, 3 08/17/2015 08/21/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Indian Point

03/02/2015 15:16:39 Inspection / Activity Plan

Report 22

01/01/2015 - 06/30/2016

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

ISFSI - ISFSI LOADING INSPECTION 2

2, 3 08/17/2015 08/21/2015 IP 60855 Operation Of An ISFSI

2 08/17/2015 08/21/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

2516-001 - TI 2516-001 U3 LR COMMITMENTS INSPECTION 1

3 11/16/2015 11/20/2015 IP 2516/001 Review of License Renewal Activities

71124.08 - RADWASTE 1

2, 3 11/16/2015 11/20/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

71152B - PI&R - BIENNIAL 4

2, 3 11/30/2015 12/04/2015 IP 71152B Problem Identification and Resolution

2, 3 12/14/2015 12/18/2015 IP 71152B Problem Identification and Resolution

71124 - HP 1

2 03/07/2016 03/11/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

2 03/07/2016 03/11/2016 IP 71124.02 Occupational ALARA Planning and Controls

ISI - U2 INSERVICE INSPECTION 1

2 03/14/2016 03/25/2016 IP 7111108P Inservice Inspection Activities - PWR

EP - EP EXERCISE EVALUATION 4

2, 3 06/27/2016 07/01/2016 IP 7111401 Exercise Evaluation

TRI FI - TRIENNIAL FIRE PROTECTION 4

2, 3 05/23/2016 05/27/2016 IP 7111105T Fire Protection [Triennial]

2, 3 06/06/2016 06/10/2016 IP 7111105T Fire Protection [Triennial]

71124.07 - REMP 1

2, 3 06/20/2016 06/24/2016 IP 71124.07 Radiological Environmental Monitoring Program

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure