,P~kRG,
UNITED STATES
0NUCLEAR
REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, N.W.
ATLANTA, GEORGIA 30303
NOV 15 lq78
In Reply Refer To:
RHl:FJ
50-269/78-25
50-270/78-24
50-287/78-25
Duke Power Company
Attn:
Mr. William 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178
422 South Church Street
Charlotte, North Carolina
28242
Gentlemen:
This refers to the inspection conducted by Mr. F. Jape of this office on
October 18-20, 1978, of activities authorized by NRC Operating license
Nos. DPR-38, DPR-47 and DPR-55 for the Oconee 1, 2 and 3 facilities,
and to the discussion of our findings held with Mr. J. E. Smith at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
We have examined actions you have taken with regard to previously
reported unresolved items.
The status of these items is discussed in
the enclosed report.
One new unresolved item resulted from this inspection and is discussed
in the enclosed report.
This item will be examined during subsequent
inspections.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements.
This
item and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A. This notice is sent to
you pursuant to the provisions of Section 2.201 of the KRC's "Rules of
Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and .(3) the date when full compliance will be achieved. 790118c>70
5 !978
Duke Power Company
-2
In accordance with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of. the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
F. J. Long, Chie
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-269/78-25,
50-270/78-24 and 50-287/78-25
cc w/encl:
Mr. J. E. Smith, Station Manager
Oconee Nuclear Plant
P. 0. Box 1175
Seneca, South Carolina
29678