ML15223A356

From kanterella
Jump to navigation Jump to search
Forwards IE Inspec Repts 50-269/78-24, 50-270/78-23 & 50-287/78-24 on 781017-20 & 781101-03 During Which No Items of Noncompliance Were Noted
ML15223A356
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/29/1978
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15223A354 List:
References
NUDOCS 7812140055
Download: ML15223A356 (2)


See also: IR 05000269/1978024

Text

tp~AE~b~UNITED

STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, N.W.

ATLANTA, GEORGIA 30303

NOV 2 9 1978

In Reply Refer To:

RII:JWH

50-269/78-24

50-270/78-23

50-287/78-24

Duke Power Company

Attn: Mr. William 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 33189

422 South Church Street

Charlotte, North Carolina

28242

Gentlemen:

This refers to the inspection conducted by Mr. J. W. Hodges of this office

on October 16-20 and November 1-3,

1978,

of activities authorized by NRC

Operating License Nos. DPR-38, DPR-47 and DPR-55 at Oconee Units 1, 2 and 3

and to the discussion of our findings held with Mr. R. M. Koehler at the

conclusion of the inspection.

The area examined during this inspection was your program for safeguarding

special nuclear material under the applicable provisions of Title 10, Code

of Federal Regulations, Part 70,

"Special Nuclear Material," and specific

requirements

of the above licenses.

Within this area, the inspection

consisted

of selective examinations

of procedures

and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were dis

closed.

In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If

this report contains any information that you (or your contractor) believe

to be proprietary,

it

is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure.

Any such application must include a full statement of the

reasons on the basis of which it

is claimed that the information is proprie

tary, and should be prepared so that proprietary information identified in

O

the application is contained in a separate part of the document. If we do

not bear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

IS 12 14005's

Duke Power Company

-2-

NOV 2 9 1978

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sin erely,

W. B. Ke a, Chief

Safeguar

Branch

Enclosure:

Inspection Report Nos. 50-269/78-24,

50-270/78-23 and 50-287/78-24

cc w/encl:

Mr. J. E. Smith, Station Manager

Oconee Nuclear Plant

P. 0..Box 1175

Seneca, South Carolina

29678