ML15223A347

From kanterella
Jump to navigation Jump to search
Forwards IE Inspec Repts 50-269/78-29, 50-270/78-21 & 50-287/78-29 on 781106-08 During Which No Items of Noncompliance Were Noted
ML15223A347
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/22/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15223A346 List:
References
NUDOCS 7812140046
Download: ML15223A347 (2)


See also: IR 05000269/1978029

Text

RE (UNITED

STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, N.W.

ATLANTA, GEORGIA 30303

NOV 2 2 1978

In Reply Refer To:

RII:FJ

50-269/78-29

50-270/78-21

50-287/78-29

Duke Power Company

Attn:

Mr. William 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 2178

422 South Church Street

Charlotte, North Carolina

28242

Gentlemen:

This refers to the inspection conducted by Mr. Frank Jape of this office

O on November 6-8, 1978, of activities authorized by NRC Operating License

Nos. DPR-38, DPR-47 and DPR-55 for the Oconee Units 1, 2 and 3 facilities,

and to the discussion of our findings held with Mr. R. M. Koehler at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office'to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is

contained in a separate part of the document. If we do not hear

from you in this regard within the specified period, the report

will be placed in the Public Document Room.

78

12

4 0oL_

Duke Power Company

-2

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

  • J. Long, Chief

R ctor Operation. and

clear Support Branch

Enclosure:

Inspection Report Nos.

50-269/78-29, 50-270/78-21,

and 50-287/78-29

cc w/encl:

Mr. J. E. Smith, Station Manager

Oconee Nuclear Plant

P. 0. Box 1175

Seneca, South Carolina 29678