ML15223A347
| ML15223A347 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 11/22/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML15223A346 | List: |
| References | |
| NUDOCS 7812140046 | |
| Download: ML15223A347 (2) | |
See also: IR 05000269/1978029
Text
RE (UNITED
STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, N.W.
ATLANTA, GEORGIA 30303
NOV 2 2 1978
In Reply Refer To:
RII:FJ
50-269/78-29
50-270/78-21
50-287/78-29
Duke Power Company
Attn:
Mr. William 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178
422 South Church Street
Charlotte, North Carolina
28242
Gentlemen:
This refers to the inspection conducted by Mr. Frank Jape of this office
O on November 6-8, 1978, of activities authorized by NRC Operating License
Nos. DPR-38, DPR-47 and DPR-55 for the Oconee Units 1, 2 and 3 facilities,
and to the discussion of our findings held with Mr. R. M. Koehler at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office'to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is
contained in a separate part of the document. If we do not hear
from you in this regard within the specified period, the report
will be placed in the Public Document Room.
78
12
4 0oL_
Duke Power Company
-2
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Sincerely,
- J. Long, Chief
R ctor Operation. and
clear Support Branch
Enclosure:
Inspection Report Nos.
50-269/78-29, 50-270/78-21,
and 50-287/78-29
cc w/encl:
Mr. J. E. Smith, Station Manager
Oconee Nuclear Plant
P. 0. Box 1175
Seneca, South Carolina 29678