E-mail from R.Guzman to W.Craft Acceptance Review Determination, Dominion Reload Core Design and Nuclear Safety Methods
ML15177A130
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/26/2015
From: Richard Guzman
Plant Licensing Branch 1
To: Craft W
Dominion Nuclear Connecticut
Guzman R
References
TAC MF6251
Download: ML15177A130 (1)


Text

From:

Guzman, Richard Sent:

Friday, June 26, 2015 10:35 AM To:

'wanda.d.craft@dom.com'

Subject:

Millstone Power Station, Unit No. 3 - Acceptance Review Email, Dominion Reload Core Design and Nuclear Safety Methods (TAC No. MF6251)

Wanda, The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of the subject license amendment request (LAR).

By letter dated May 8, 2015 (ADAMS Accession No. ML15134A244), Dominion Nuclear Connecticut, Inc., (DNC) submitted an LAR application to revise the Millstone Power Station, Unit 3 (MPS3) Technical Specifications (TSs) for enabling the use of Dominion nuclear safety and reload core design methods. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed DNCs application and concludes that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence If you have any questions, please contact me.

Rich Guzman Sr. Project Manager NRR/DORL US NRC 301-415-1030