MONTHYEARML21342A1412021-12-0909 December 2021 Enclosure - List of Attendees for the Public Meeting in Tarrytown, Ny, Re Indian Point Units 1, 2, and 3 PSDAR ML21179A0212021-06-24024 June 2021 NRC-2021-000172 - Resp 1 - Final, Agency Records Subject to Request Enclosed ML21144A1932021-05-12012 May 2021 IP-EP-360 Revision 6 ML21144A1922021-05-12012 May 2021 IPEC-EP 21-02 Revision 29 ML20307A1972020-11-16016 November 2020 Notification of Significant Licensing Action - Proposed Issuance of Order Approving a License Transfer Application for Which a Hearing Has Been Requested ML20078L3802020-03-18018 March 2020 Briefing on Agency Practice and Procedure Issues: NRC Expert Evaluation on Gas Transmission Lines, Indian Point ML20010D3552020-01-0909 January 2020 Ti 2515/194 Inspection Documentation Request ML18269A3462018-09-26026 September 2018 LTR-18-0376-OEDO Ticket - Paul Blanch, Energy Consultant, E-mail 2.206 Petition Regarding Violations of Regulations at Indian Point Units 2 and 3 ML18212A0322018-09-17017 September 2018 Records of Decision for the Indian Point Renewed Licenses ML17068A2452017-01-0808 January 2017 Closure Agreement January 8, 2017 CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 20152016-12-20020 December 2016 Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 ML16349A2272016-12-0909 December 2016 FOIA/PA-2016-0457 - Resp 3 - Interim, Agency Records Subject to the Request Are Enclosed. Part 2 of 2 ML16349A2262016-12-0909 December 2016 FOIA/PA-2016-0457 - Resp 3 - Interim, Agency Records Subject to the Request Are Enclosed. Part 1 of 2 ML16285A3322016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 14-10 ML16235A1662016-08-16016 August 2016 FOIA/PA-2016-0532 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed and Are Already Available in Public ADAMS or on Microfiche in the NRC Public Document Room ML16182A0622016-06-30030 June 2016 6/8/2016 - Indian Point Units 2 & 3 Annual Assessment Meeting - Speaker List ML16172A2662016-06-17017 June 2016 FOIA/PA-2016-0148 - Resp #3 - Final. Group a, Records Already Publicly Available ML16172A2682016-06-17017 June 2016 FOIA/PA-2016-0148 - Resp #3 - Final. Group B, Records Being in Part ML16112A3682016-04-29029 April 2016 Enclosure to Indian Point Nuclear Generating Unit Nos. 2 and 3 MSFHI Letter ML15322A0252015-11-18018 November 2015 50 54(p) Review for Indian Point ML15232A3562015-08-20020 August 2015 LTR-15-0430-1 - Oedo Ticket - Plans to Proceed with Construction of the Spectra Aim Pipeline in the Vicinity of the Indian Point Nuclear Power Plant ML15167A4442015-06-13013 June 2015 Paul Blanch Email Indian Point Existing Gas Pipeline Concerns ML15162A0842015-06-11011 June 2015 GTCC Disposals at the Barnwell Low-Level Radioactive Waste Facility from 1998 to Present ML15231A3642015-05-27027 May 2015 FOIA/PA-2014-0204 - Resp 1 - Final, Group a ML15147A4972015-05-20020 May 2015 5/20/2015 - Indian Point Annual Assessment Meeting Attendee Sign-In Sheet ML15070A0862015-03-0404 March 2015 FOIA/PA-2015-0076 - Resp 1 - Partial, Group B, Safety Review and Confirmatory Analysis ML15049A3472015-02-18018 February 2015 Certificate of Service ML15020A1102015-01-16016 January 2015 Consent & Waiver Form ML14322B0052014-11-17017 November 2014 LTR-14-0666-Ticket - Representative Nita M. Lowey Ltr. Request Comprehensive Risk Assessment for Expansion of Spectra Energy'S Algonquin Pipeline - Near Indian Point ML14307B7482014-10-30030 October 2014 Plant Modifications, IP 71111.18, Pipeline Analysis NL-14-133, RAI Data Documentation Package 10-23-142014-10-27027 October 2014 RAI Data Documentation Package 10-23-14 ML14157A3812014-06-0606 June 2014 LTR-14-0315-1-Ticket - J. Capozzelli Ltr. Urges the Commission to Deny Relicensing of Indian Point Nuclear Power ML13242A0232014-04-24024 April 2014 50.54 Review Indian Point Security Plan Revision 14 ML13364A2832013-12-30030 December 2013 Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 ML13281A4992013-10-0303 October 2013 Response to Request for Additional Information Regarding P-T Limits and Ltop Requirements Vessels and Internals Integrity Branch (Evib) ML13231A2242013-08-19019 August 2013 G20130601/LTR-13-0682-Ticket - Representative Nita Lowey Ltr. Signed Petition by Residents of New York and New Jersey, Urging the NRC to Deny the Relicensing Renewal Requests for Reactors 2 and 3 at Indian Point Entergy Center in Buchanan, ML13200A0362013-07-10010 July 2013 LTR-13-0619 - Mary Saari, Village of Cold Spring, Ny, Ltr. Resolution for Public Health and Safety Regarding Indian Point Nuclear Plants ML13161A4512013-06-10010 June 2013 Certificate of Service ML13156A1882013-06-0303 June 2013 G20130435/LTR-13-0485-Ticket Dorice Madronero, Ny, E-mail/Letter Desalination Plant for Drinking Water within 3.5 Miles of Indian Point ML12300A4682012-10-0202 October 2012 LTR-12-0629 - Joan Agro Concerns Resolution for Public Health and Safety Regarding Indian Point Nuclear Plants ML12278A4262012-09-24024 September 2012 LTR-12-0560 - Catherine Howard (Dominican Sisters) Concerns Resolution for Public Health and Safety Regarding Indian Point Nuclear Plants ML12256A9902012-08-23023 August 2012 LTR-12-0500 - Marie Haughney Concerns Resolution for Public Health and Safety Regarding Indian Point Nuclear Plants ML15153A2142012-06-20020 June 2012 LTR-15-0270 - Congresswoman Nita Lowey, Letter Investigation of Fire at Indian Point Energy Center (Enclosure) ML12172A3702012-06-20020 June 2012 List of Exemptions, 1968-2012 ML12163A3522012-06-11011 June 2012 Annual Assessment Meeting Attendee List ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1131306672011-11-0909 November 2011 Lr Hearing - NIA-93 ML11327A0462011-10-28028 October 2011 Attachment 1 to NL-11-118 - Response to Request for Additional Information (Non-Proprietary) ML1127100332011-09-28028 September 2011 ROP Tabletop Examples and Results ML11230A0242011-08-18018 August 2011 Lr Hearing - NIA-096 2021-06-24
[Table view] |
Text
ML15167A444 Allegation for Indian Point I have received communication from an individual that a failure of the existing gas lines traversing the protected area of Indian Point is or should be considered a Design Bases Event (DBE)
This conclusion is based upon Entergys risk analysis submitted to the NRC on August 21, 2014. This analysis concluded that the new proposed 42 inch natural gas lines would be considered a DBE, therefore the failure of existing lines located even closer to vital structures logically would also be considered a DBE.
According to the NRCs own analysis the probability of a gas line failure the accident rate of pipes greater than 20 inches diameter is about 5 x 10-4/mile-yr. This assumption is based on new piping and 60-year-old piping would be expected to have a much higher rate of failure. This is an unacceptably probability.
The present FSAR states this event is not feasible. Both of these statements cant be accurate.
The specific allegation is as follows:
- 1. Both plants are presently operating in an unanalyzed condition. No analysis exists other than a fictitious statement in the FSAR that this event is not feasible.
- 2. Entergys analysis states: . . conclude that the rupture of the gas pipeline must be considered as a design basis event under NRC guidance.
- 3. Operations personnel have not been properly trained to deal with an event such as fire or explosion of these gas lines.
- 4. Some operations personnel are not even aware of the existence of these ancient active gas transmission lines.
- 5. The fire brigade, including offsite responders, has not been trained to respond to such an event.
- 6. There are no procedures available to counter this high probability event.
- 7. No risk analysis has been conducted for this event.
- 8. There is no documentation or requirements verifying the integrity of these gas transmission lines.
- 9. There are no automatic isolation valves or any isolation valves under the control of Indian Point to mitigate the consequences of this event.
- 10. Operations personnel are not aware of the location of these isolation valves.
- 11. These valves and piping were not considered in the relicensing application for buried piping.
- 12. Neither the licensee nor the NRC has imposed any requirements on the piping or the gas transmission line system within the protected area of Indian Point.
This is an immediate, major safety concern with an unacceptable probability and potential significant consequences.
I expect a prompt response to this concern. You are free to share this allegation with the licensee as 10 CFR 50.72 requires the licensee to submit an eight hour report for operating in an unanalyzed condition.
I am free to discuss this at any time with the NRC staff.