Technical Requirements Manual
ML15131A349
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 04/29/2015
From: Gerlach R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
028401, 2015-18571
Download: ML15131A349 (101)


Text

Apr. 29, 2015 Page 1 of 3 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2015-18571 USER INFORMATION:

GERLACH*ROSEY M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSEY M 04/29/2015 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRMI - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 04/14/2015 ADD MANUAL TABLE OF CONTENTS DATE: 04/28/2015 CATEGORY: DOCUMENTS TYPE: TRMI KAU

Apr. 29, 2015 Page 2 of 3 ID: TEXT 2.1 ADD: REV: 2 REMOVE: REV:1 CATEGORY: DOCUMENTS TYPE: TRM1 ID: TEXT 3.11.2.6 ADD: REV: 5 REMOVE: REV:4 CATEGORY: DOCUMENTS TYPE: TRMI ID: TEXT 3.2.1 ADD: REV: 15 REMOVE: REV:14 CATEGORY: DOCUMENTS TYPE: TRM1 ID: TEXT LOES ADD: REV: 82 REMOVE: REV:81 CATEGORY: DOCUMENTS TYPE: TRMI ID: TEXT TOC REMOVE: REV:24 ADD: REV: 25 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL

Apr. 29, 2015 Page 3 of 3 USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual -Name: TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date: C]4/28/2015 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 82 04/28/2015

Title:

LIST OF EF. FECTIVE SECTIONS TEXT TOC 25 04/28/2015

Title:

TABLE OF CONTENTS TEXT 1ii 1 01/31/2014

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 2 04/28/2015

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 10 01/31/2014

Title:

PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 5 03/05/2015

Title:

TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY & SURVEILLANCE (TRS)

APPLICABILITY TEXT 3.1.1 1 11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 5 04/16/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &

CHECK VALVE TEXT 3.2.1 15 04/28/2015

Title:

CORE OPERATING LIMITS REPORT (COLR)

Report Date: 04/28/15 Pagel Page 1 of of ii 16 Report Date: 04/28/15

SSES MANUAL Manual Name: TRMI.

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0 11/18/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 7 03/05/2015

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/18/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 4 04/29/2014

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1 11/09/2007

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3 04/17/2008

Title:

OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1 12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12

Title:

1 03/05/2015 WATER MONITORING INSTRUMENTATION 0 Report Date: 04/28/15 PageZ Page 2 ooff Ii 15 Report Date: 04/28/15

SSES MANUJAL Manual Name: TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 2 04/17/2008

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 2 04/25/2013

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005

Title:

EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007

Title:

EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/18/2002

Title:

EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2 04/29/2014

Title:

SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/18/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Report Date: 04/28/15 Page 3.

3 of of i~

16 Report Date: 04/28/15

SSES MANUJAL Manual Name: TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0 11/18/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/18/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/18/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 2 04/16/2009

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009

Title:

PLANT'SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 3 04/16/2009

Title:

PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009

Title:

PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009

Title:

PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009

Title:

PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006

Title:

PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 10 09/27/2012

Title:

PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4

Title:

1 04/26/2006 PLANT SYSTEMS SOLID RADWASTE SYSTEM 0 Report Date: 04/28/15 Page 44 of of 16 16 Report Date: 04/28/15

SSES MANUAL

. Name:

Manual

Title:

TRM1 TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.1 1 03/05/2015

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/18/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 5 03/05/2015

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 2 01/31/2014

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7. 10 1 12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11 0 04/16/2009

Title:

STRUCTURAL INTEGRITY TEXT 3.8.1 2 04/05/2010

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT 3.8.2.2 2 12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC Page 5 of L6 Report Date: 04/28/15

SSES M.ANUIAL Manual Name: TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3 2 03/05/2015

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 0 11/18/2002

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3,.8.6 1 12/08/2011

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 1 06/15/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/18/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/18/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/18/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006

Title:

MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 2 08/08/2006

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 2 04/17/2008

Title:

MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)

Page 6 of 16 Report Date: 04/28/15

SSES MANUAL Manual Name: TRM1.

!'Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 2 10/09/2012

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 3 03/05/2015

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/18/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 4 07/03/2013

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 5 04/28/2015

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE Report Date: 04/28/15 Page77 Page of of 16

.166 Report Date: 04/28/15

SSES MANUAL Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 0 TEXT 3.11.4.1 5 03/05/2015

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT-3.11.4.2 2 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4 04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4. 1 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 08/31/199.8

Title:

ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4. 6

Title:

0 08/31/1998 ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM 0 Report Date: 04/28/15 Page ~

8 of of 16 16 Report Date: 04/28/15

SSES MANUAL Manual Name:

Manual

Title:

TRMI TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 5 03/05/2015

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 2 04/29/2014

Title:

REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 03/31/2006

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 1 01/31/2014

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3 12/18/2008

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 4 07/09/2010

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007

Title:

INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Report Date: 04/28/15 Page ~29 of of 16

.16 Report Date: 04/28/15

SSES MANUAL Manual Name: TRM1.

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6 5 01/31/2014

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 1 11/09/2007

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003

Title:

INSTRUMENTATION BASES TRM REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT B3.3.9 3 04/17/2008

Title:

OPRM INSTRUMENTATION TEXT B3.3.10 3 08/09/2010

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5

Title:

0 11/19/2002 REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS 0 Report Date: 04/28/15 Page 10 Page 10 of of 16

.16 Report Date: 04/28/15 1

SSES MANUAL, Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6 2 04/25/2013

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.1 0 11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2 04/17/2008

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM

  • TEXT B3.7.3.2 2 04/26/2006

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11 of .16 Report Date: 04/28/15

SSES MANUAL Manual Name: TRM*

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 3 04/29/2014

Title:

PLANT SYSTEMS BASES HALO]N SYSTEMS TEXT B3.7.3.5 1 04/26/2006

Title:

PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3 09/27/2012

Title:

PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002

Title:

PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTUR]E TEXT B3.7.5.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION w MONITORING INSTRUMENTATION Page 12 of 16 Report Date: 04/28/15

SSES MANUAL

    • I Manual Name: TI
  • Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8 4 01/31/2014

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 2 12/08/2011

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 1 04/14/2010

Title:

STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT B3.8.2.2 1 09/17/2004

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT B3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 2 12/08/2011

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM Report Date: 04/28/15 Page i3~

Page 13 of of 16 16 Report Date: 04/28/15

SSES MANUAL Manual Name: TRMI.

l. Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.1 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 03/31/2006

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.10.4 1 04/17/2008

Title:

MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)

TEXT B3.11.1.1 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Report Date: 04/28/15 Page 14 14 of of 16 16 Report Date: 04/28/15

SSES MANUAL Manual Name: TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.1 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 5 07/03/2013

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 5 03/05/2015

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Report Date: 04/28/15 Page 15.

15 of of 16

.16 Report Date: 04/28/15

SSES MAN1UAL Manual Name: TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 04/28/15 Page 2~

L6 of of 16 16 Repott Date: 04/28/15

PPL Rev.25

....... I...........................................

........................... .I-

.............. TRW/3.I-9

'.7tR.........M

..... /3.2-1

- .... TRM/3.3-1 ion......................... TRM13.3-1 0n.......................... TRMI3.3-4 e sn tatn....................... TRW/3.3-7

,trumenain..................... TRM13.3-9

.................................. TRM I3.3-12 itation...................... TRMI3.3-13

)n System ................... TRM I3.-17

.................................... TRMi'3.3.. 9 I

ýion......................... TRW/3.3-22

'et Stopp..................... TRM/3.3-23 I ...... TRM /3.3-25

.................................. TRM13.3-27

....... TRW /3.4-1 Monitors ............................ TRM/3.4-9 rd Rod Une Limit ................................. TRM3.4-12 I

............................................................. TRM /3.4-13 Loop Opeation (SLO)

.............................................. TRM /3.4-14 TRM I TOO-I EFFECTiVE DATE 04123/2015 SUSQUEHANNA -

UNIT I1 SUSQUEHANNA - UNIT TRM / TOC-1 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.5 EMERGENCY CORE COOLING AND RCIC .......................................... TRM/3.5-1 3.5.1 ADS Manual Inhibit ........................................................................... TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation ........................ TRM/3.5-3 3.5.3 Long Term Nitrogen Supply to ADS ........................................................... 3.5-6 3.6 CONTAINMENT ............................................................................................... 3.6-1 3.6.1 Venting or Purging ..................................................................................... 3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Ind icatio n ........................................................................................... T R M/3 .6-2 3.6.3 Suppression Pool Alarm Instrumentation .................................................... 3.6-3 3.6.4 Primary Containment Closed System Boundaries ............................. TRM/3.6-6 3.7 PLANT SYSTEMS .......................................................................................... 3.7-1 3.7.1 Emergency Service W ater System (ESW) Shutdown ................................. 3.7-1 3.7.2 Ultimate Heat Sink (UHS) and Ground Water Level ................................... 3.7-3 3.7.3 Fire Protection ................................................................................... TRM/3.7-4 3.7.3.1 Fire Suppression W ater Supply System ............................................ TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems ............................................................ TRM/3.7-8 3.7.3.3 C02 Systems .................................................................................... TRM/3.7-12 3.7.3.4 Halon Systems .................................................................................. TRM/3.7-16 3.7.3.5 Fire Hose Stations ............................................................................ TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses .................................. TRM/3.7-22 3.7.3.7 Fire Rated Assemblies ...................................................................... TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation .......................................................... TRM/3.7-26 3.7.4 Solid Radwaste System .................................................................... TRM/3.7-35 3.7.5 Explosive Gas and Storage Tank Radioactivity Monitoring Program .................................................................................... 3.7-38 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ....................................... TRM/3.7-38 3.7.5.2 Main Condenser Offgas Explosive Gas Mixture ................................ TRM/3.7-39 3.7.5.3 Liquid Holdup Tanks ......................................................................... TRM/3.7-40 3.7.6 ESSW Pumphouse Ventilation .......................................................... TRM/3.7-41 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation ................................................................ TRM/3.7-42 3.7.8 Snubbers ........................................................................................... TRM/3.7-44 3.7.9 Control Structure HVAC .................................................................... TRM/3.7-50 3.7.10 Spent Fuel Storage Pools (SFSPs) ................................................... TRM/3.7-52 3.7.11 Structural Integrity ............................................................................. TRM/3.7-55 SUSQUEHANNA - UNIT 1 TRM /TOC-2 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.8 ELECTRICAL POW ER ........................................................................... TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices ............................................................................ TRM/3.8-1 3.8.2 Motor Operated Valves Thermal Overload Protection ....................... TRM/3.8-5 3.8.2.1 Motor Operated Valves (MOV) Thermal Overload Protection -

Continuous ........................................................................................ TRM/3.8-5 3.8.2.2 Motor Operated Valves (MOV) Thermal Overload Protection -

A uto m atic .......................................................................................... T R M/3 .8-1 1 3.8.3 Diesel Generator (DG) Maintenance Activities .................................. TRM/3.8-13 3.8.4 24 VDC Electrical Power Subsystem ................................................. TRM/3-8-15 3.8.5 Degraded Voltage Protection ............................................................ TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling .............................................. TRM/3.8-24 3.8.7 Battery Monitoring and Maintenance Program .................................. TRM/3.8-26 3.9 REFUELING OPERATIONS ............................................................................ 3.9-1 3 .9 .1 De ca y T im e ................................................................................................ 3 .9 -1 3.9.2 Communications ........................................................................................ 3.9-2 3.9.3 Refueling Platform ...................................................................................... 3.9-3 3.10 MISCELLANEOUS ................................................................................. TRM/3.10-1 3.10.1 Sealed Source Contamination ........................................................... TRM/3.10-1 3.10.2 Shutdown Margin Test RPS Instrumentation ..................................... TRM/3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) ......................... TRM/3.10-7 3.10.4 Section Not Used ................................................................... TRM/3.10.8 3.11 RADIOACTIVE EFFLUENTS .................................................................. TRM/3.1 1-1 3.11.1 Liquid Effluents .................................................................................. TRM/3.11-1 3.11.1.1 Liquid Effluents Concentration ........................................................... TRM/3. 11-1 3.11.1.2 Liquid Effluents Dose ........................................................................ TRM/3.11-4 3.11.1.3 Liquid Waste Treatment System ....................................................... TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation ........................ TRM/3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation ................... TRM/3.11-13 3.11.2 Gaseous Effluents ............................................................................ TRM/3.11-17 3.11.2.1 Dose Rate ........................................................................................ TRM/3.11-17 3.11.2.2 Dose - Noble Gases ......................................................................... TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form ................................................................................ TRM/3.11-21 3.11.2.4 Gaseous Radwaste Treatment System ............................................. TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System .............................................. TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation ................................................................................... TRM/3.11-25 3.11.3 Total Dose ........................................................................................... TRM/3.11-33 3.11.4 Radiological Environmental Monitoring ............................................... TRM/3.11-35 3.11.4.1 Monitoring Program ............................................................................. TRM/3.11-35 3.11.4.2 Land Use Census ................................................................................ TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program .................................................. TRM/3.11-47 SUSQUEHANNA - UNIT 1 TRM / TOC-3 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.12 LOADS CO NTRO L PRO G RAM .............................................................. TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool ............................................ TRM/3.12-1 3.12.2 Heavy Loads Requirem ents .............................................................. TRM/3.12-3 3.12.3 Light Loads Requirem ents ................................................................ TRM/3.12-5 4.0 ADM INISTRATIVE CO NTRO LS ...................................................................... 4.0-1 4.1 O rganization ............................................................................................... 4.0-1 4.2 Reportable Event Action ............................................................................. 4.0-2 4.3 Safety Lim it Violation .................................................................................. 4.0-3 4.4 Procedures and Program s ......................................................................... 4.0-4 4.5 Reporting Requirements ............................................................................ 4.0-5 4.5.1 Startup Reports .......................................................................................... 4.0-5 4.5.2 Annual Reports ......................................................................................... 4.0-6 4.5.3 Special Reports .......................................................................................... 4.0-6 4.6 Radiation Protection Program .................................................................... 4.0-7 4.7 Training ...................................................................................................... 4.0-8 SUSQUEHANNA - UNIT 1 TRM / TOC-4 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.0 Technical Requirement for Operation (TRO) Applicability ................. TRM/B 3.0-1 B 3.0 Technical Requirement Surveillance (TRS) Applicability ................... TRM/B 3.0-9 B 3.1.1 Anticipated Transient Without SCRAM Alternate Rod Injection (ATWS-ARI) Instrumentation ............................................................. TRM/B 3.1-1 B 3.1.2 Control Rod Drive (CRD) Housing Support ................................................ B 3.1-4 B 3.1.3 Control Rod Block Instrumentation .................................................... TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck V alve ...................................................................................... T R M/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR) ........................................................ B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation ................................................ TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation ................................................... TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation ........................................ TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation ................................. TRM/B 3.3-4 B 3.3.5 Section Not Used .............................................................................. TRM/B 3.3-9 B 3.3.6 TRM Isolation Actuation Instrumentation ........................................... TRM/B 3.3-10 B 3.3.7 Main Turbine Overspeed Protection System ................ TRM/B 3.3-14 B 3.3.8 Section Not Used .............................................................................. TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation ...................................................................... TRM/B 3.3-17 B 3.3.10 Reactor Recirculation Pump MG Set Stops ....................................... TRM/B 3.3-18 B 3.3.11 MVP Isolation Instrumentation ........................................................... TRM/B 3.3-20 B 3.3.12 Water Monitoring Instrumentation ...................................................... TRM/B 3.3-22 B 3.4.1 Reactor Coolant System Chemistry ............................................................ B 3.4-1 B 3 .4.2 Not Used ........................................................................................... T R M/B 3 .4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors ................................ TRM/B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit ................................. TRM/B 3.4-5 B 3.4.5 Reactor Vessel Materials ........................................................................... B 3.4-6 B 3.4.6 Reactor Recirculation Single Loop Operation (SLO)

Flow Rate Restriction ....................................................................... TRM/B 3.4-7 B 3.5.1 A DS Manual Inhibit .................................................................................... B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation ........................ TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS .................................................. TRM/B 3.5-4 TRM I TOC-5 EFFECTIVE DATE 04/23/2015 SUSQUEHANNA -

UNIT 1 SUSQUEHANNA - UNIT 1 TRM / TOC-5 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.6.1 Venting or Purging ............................................................................ T RM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Ind ica tio n .................................................................................................... B 3 .6-3 B 3.6.3 Suppression Pool Alarm Instrurnetation ........................................... TRM/B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries ............................. TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown) .......................................... B 3.7-1 B 3.7.2 Ultimate Heat Sink (UHS) Ground Water Level .......................................... B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System ............................................ TRM/B 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems ............................................................ TRM/B 3.7-5 B 3.7.3.3 C 0 2 system s ..................................................................................... T R M/B 3.7-7 B 3.7.3.4 Halon System s .................................................................................. T R M/B 3.7-8 B 3.7.3.5 Fire Hose Stations ............................................................................. TRM/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses .................................. TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assemblies ...................................................................... TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation .......................................................... TRM/B 3.7-14 B 3.7.4 Solid Radwaste System .................................................................... TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ................................................ B 3.7-17 B 3.7.5.2 Main Condenser Offgas Explosive Gas Mixture ......................................... B 3.7-19 B 3.7.5.3 Liquid Holdup Tanks .................................................................................. B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation .......................................................... TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation ................................................................ TRM/B 3.7-22 B 3.7.8 S nubbers ........................................................................................... T R M/B 3.7-24 B 3.7.9 Control Structure HVAC .................................................................... TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools ................................................................. TRM/B 3.7-33 B 3.7.11 Structural Integrity ............................................................................. TR M/B 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices ............................................................................ T R M/B 3.8-1 B 3.8.2.1 Motor Operated Valves (MOV) Thermal Overload Protection -

C o ntinuous ........................................................................................ T R M/B 3 .8-3 B 3.8.2.2 Motor Operated Valves (MOV) Thermal Overload Protection -

Auto m atic .......................................................................................... T R M/B 3 .8-4 B 3.8.3 Diesel Generator (DG) Maintenance Activities ........................................... B 3.8-5 B 3.8.4 24 VDC Electrical Power Subsystem ................................................. TRM/B 3.8-6 B 3.8.5 Degraded Voltage Protection ............................................................ TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling .............................................. TRM/B 3.8-17 B 3.8.7 Battery Monitoring and Maintenance Program .................................. TRM/B 3.8-18 B .3.9 .1 D ecay T ime ................................................................................................ B 3 .9-1 B 3.9.2 C om m unications ........................................................................................ B 3.9-2 UNIT I TRM/TOC-6 EFFECTIVE DATE 04/23/2015 SUSQUEHANNA - UNIT SUSQUEHANNA -

1 TRM / TOC-6 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.9.3 Refueling P latform ...................................................................................... B 3.9-3 B 3.10.1 Sealed Source Contamination .................................................................... B 3.10-1 B 3.10.2 Shutdown Margin Test RPS Instrumentation ..................................... TRM/B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) ......................... TRM/B 3.10-4 B 3.11.1.1 Liquid Effluents Concentration .................................................................... B 3.11-1 B 3.11.1.2 Liquid Effluents Dose ................................................................................. B 3.11-4 B 3.11.1.3 Liquid Waste Treatment System ................................................................ B 3.11-6 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation ................................. B 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation .................... TRM/B 3.11-10 B 3.11.2.1 Dose Rate ......................................................................................... T RM/B 3.11-12 B 3.11.2.2 Dose - Noble G ases ................................................................................... B 3.11-16 B 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in P articulates Form ....................................................................................... B 3 .11-18 B 3.11.2.4 Gaseous Radwaste Treatment System ............................................. TRM/B 3.11-20 B 3.11.2.5 Ventilation Exhaust Treatment System .............................................. TRM/B 3.11-21 B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation ................................................................................. T RM/B 3.11-24 B 3 .11.3 Tota l D ose .................................................................................................. B 3 .11-26 B 3.11.4.1 Monitoring Program ........................................................................... TRM/B 3.11-28 B 3.11.4.2 Land Use C ensus ....................................................................................... B 3.11-34 B 3.11.4.3 Interlaboratory Comparison Program ................................................ TRM/B 3.11-36 B.3.12.1 Crane Travel - Spent Fuel Storage Pool .......................................... TRM/B 3.12-1 B.3.12.2 Heavy Loads Requirements .............................................................. TRM/B 3.12-2 B.3.12.3 Light Loads Requirements ................................................................ TRM/B 3.12-3 TRM1 text TOC 4/23/2015 SUSQUEHANNA - UNIT 1 TRM /TOC-7 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 82 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC TABLE OF CONTENTS 04/23/2015 1.0 USE AND APPLICATION Page TRM / 1.0-1 10/04/2002 Page TRM / 1.0-2 01/21/2014 Page TRM / 1.0-3 10/04/2002 2.0 PLANT PROGRAMS Page TRM / 2.0-1 04/23/2015 Pages TRM / 2.0-2 and TRM / 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 01/21/2014 Page TRM / 2.0-6 03/27/2008 Page TRM / 2.0-7 05/15/2008 Pages TRM / 2.0-8 and TRM / 2.0-9 01/07/2011 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 03/27/2008 Pages TRM / 2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 02/19/2015 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 02/19/2015 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 10/31/2007 Pages TRM / 3.1-2 and TRM / 3.1-3 08/31/1998 Pages 3.1-4 and 3.1-5 08/31/1998 Page TRM / 3.1-6 03/22/2006 Page TRM / 3.1-7 04/07/2009 Page TRM / 3.1-8 03/27/2008 Pages TRM / 3.1-9 and TRM / 3.1-9a 02/18/1999 Page TRM / 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 07/07/1999 Pages TRM / 3.2-2 through TRM / 3.2-54 04/21/2015 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Page TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page TRM / 3.3-6 03/10/2011 SUSQUEHANNA - UNIT 1 TRM / LOES-1 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 82 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-7 10/31/2007 Page TRM / 3.3-8 08/31/1998 Pages TRM / 3.3-9 and TRM / 3.3-9a 06/30/2010 Page TRM / 3.3-10 10/31/2007 Page TRM / 3.3-11 06/30/2010 Page TRM / 3.3-11a 02/19/2015 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 01/07/2011 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 04/11/2014 Page TRM / 3.3-16 01/07/2011 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 through TRM I 3.3-21 10/22/2003 Page TRM / 3.3-22 03/27/2008 Page TRM / 3.3-22a 11/15/2004 Pages TRM / 3.3-22b through TRM / 3.3-22d 03/22/2006 Page TRM / 3.3-23 12/03/2004 Pages TRM / 3.3-24 and TRM / 3.3-25 05/16/2003 Page TRM / 3.3-26 10/22/2003 Page TRM / 3.3-27 02/19/2015 Page TRM / 3.3-28 04/07/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages TRM / 3.4-2 through TRM / 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page TRM / 3.4-9 08/31/1998 Page TRM / 3.4-10 10/31/2007 Page TRM / 3.4-11 08/31/1998 Page TRM / 3.4-12 03/27/2008 Page TRM / 3.4-13 03/31/2006 Pages TRM / 3.4-14 and TRM / 3.4-15 04/25/2013 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages TRM / 3.5-2 and TRM / 3.5-3 08/31/1998 Pages TRM / 3.5-4 and TRM / 3.5-5 10/31/2007 Pages 3.5-6 and 3.5-7 08/31/1998 3.6 CONTAINMENT Page 3.6-1 08/31/1998 Pages TRM / 3.6-2 and TRM / 3.6-2a 04/16/2014 Page 3.6-3 08/31/1998 Page TRM / 3.6-4 01/07/2002 Page 3.6-5 08/31/1998 Pages TRM / 3.6-6 through TRM / 3.6-8 12/31/2002 TRM / LOES-2 EFFECTIVE DATE 04/23/20 15 SUSQUEHANNA -

UNIT 1 SUSQUEHANNA - UNIT 1 TRM / LOES-2 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 82 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 08/31/1998 Page TRM / 3.7-4 03/31/2006 Pages TRM / 3.7-5 04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM / 3.7-11 12/29/1999 Page TRM / 3.7-12 08/02/1999 Page TRM / 3.7.13 04/07/2009 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM / 3.7-24 03/31/2006 Page TRM / 3.7-25 08/02/1999 Page TRM / 3.7-26 09/25/2012 Page TRM / 3.7-27 11/24/2011 Pages TRM / 3.7-28 through TRM / 3.7-34a 09/25/2012 Page TRM / 3.7-35 03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37 02/01/1999 Page TRM / 3.7-38 02/19/2015 Page TRM / 3.7-39 08/31/1998 Page TRM / 3.7-40 03/31/2006 Page TRM / 3.7-41 05/24/2012 Pages TRM / 3.7-41a through TRM / 3.7-41c 05/24/2012 Page T RM / 3.7-42 09/04/2008 Page TRM / 3.7-43 08/31/1998 Page TRM / 3.7-44 02/19/2015 Pages TRM / 3.7-45 and TRM / 3.7-46 10/05/2006 Page TRM / 3.7-47 06/07/2007 Page TRM / 3.7-48 10/05/2006 Page TRM / 3.7-49 06/07/2007 Pages TRM / 3.7-49a and TRM / 3.7-49b 10/05/2006 Page TRM / 3.7-50 01/21/2014 Page TRM / 3.7-51 08/16/2006 Page TRM / 3.7-52 12/03/2004 Page TRM / 3.7-53 04/15/2003 Page TRM / 3.7-54 07/29/1999 Pages TRM / 3.7-55 through TRM / 3.7-57 04/01/2009 SUSQUEHANNA - UNIT 1 TRM / LOES-3 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 82 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Page TRM / 3.8-2 01/28/2005 Pages TRM / 3.8-3 and TRM /3.8-4 03/25/2010 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Page TRM / 3.8-7 10/31/2007 Pages TRM / 3.8-8 through TRM / 3.8-10 12/03/2004 Page TRM / 3.8-11 09/03/2004 Page TRM / 3.8-12 12/03/2004, Page TRM / 3.8-13 02/19/2015 Page TRM / 3.8-14 08/31/1998 Pages TRM / 3.8-15 through TRM / 3.8-17 04/02/2002 Page 3.8-18 08/31/1998 Page TRM / 3.8-19 04/02/2002 Page 3.8-20 08/31/1998 Pages TRM / 3.8-21 and TRM / 3.8-22 06/06/1999 Page TRM / 3.8-23 11/07/2013 Pages TRM / 3.8-24 and TRM 1 3.8-25 11/30/2011 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Pages TRM / 3.8-28 and TRM / 3.8-29 05/28/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages TRM / 3.10-2 and TRM / 3.10-3 08/31/1998 Page TRM / 3.10-4 08/01/2006 Pages TRM / 3.10-5 and TRM / 3.10-6 03/22/2006 Page TRM / 3.10-7 06/10/2010 Page TRM / 3.10-8 03/27/2008 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages TRM / 3.11-2 and TRM / 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page TRM / 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages TRM / 3.11-7 and TRM / 3.11-8 08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10 10/09/2012 Pages TRM / 3.11-11 and TRM / 3.11-12 08/31/1998 Page TRM / 3.11-13 02/19/2015 SUSQUEHANNA - UNIT 1 TRM / LOES-4 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 82 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title. Effective Date Page TRM / 3.11-14 12/03/2004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 06/18/2013 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27 01/21/2004 Page TRM / 3.11-28 09/08/2009 Page TRM / 3.11-29 12/03/2004 Pages TRM / 3.11.30 and TRM / 3.11.31 01/21/2004 Page TRM / 3.11.32 04/23/2015 Page TRM / 3.11-33 03/31/2006 Page TRM / 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Page TRM / 3.11-40 02/19/2015 Pages TRM / 3.11-41 through TRM / 3.11-43 . 08/31/1998 Page TRM / 3.11-44 08/01/2006 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages 4.0-5 through 4.0-8 08/31/1998 SUSQUEHANNA - UNIT 1 TRM / LOES-5 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 82 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 02/19/2015 Page TRM / B 3.0-4a and TRM / B 3.0-4b 02/19/2015 Page TRM / B 3.0-5 02/19/2015 Page TRM / B 3.0-6 08/31/1998 Page TRM / B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 through TRM / B 3.0-15 02/19/2015 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/13/1999 Page TRM / B 3.1-2 04/16/2014 Page TRM / B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Page TRM / B 3.1-5 11/15/2005 Pages TRM / B 3.1-6 and TRM / B 3.1-7 03/22/2006 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 01/21/2014 Page TRM / B 3.3-2 03/10/2011 Page TRM / B 3.3-2a 10/3112007 Page TRM / B 3.3-3 12/11/2008 Page TRM / B 3.3-3a 10/31/2007 Page TRM / B 3.3-4 06/30/2010 Page TRM / B 3.3-5 05/30/2006 Page TRM / B 3.3-6 06/30/2010 Page TRM / B 3.3-7 10/30/2007 Page TRM / B. 3.3-8 06/30/2010 Page TRM / B 3.3-9 10/31/2007 Pages TRM / B 3.3-10 through TRM / B 3.3-12 01/07/2011 Page TRM / B 3.3-13 01/21/2014 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 10/31/2007 Pages TRM / B 3.3-15 and TRM / B 3.3-16 10/22/2003 Page TRM / B 3.3-17 03/22/2006 Pages TRM / B 3.3-17a through TRM / B 3.3-17c 03/22/2006 Page TRM / B 3.3-17d 03/27/2008 SUSQUEHANNA - UNIT 1 TRM / LOES-6 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 82 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages TRM / B 3.3-17e and TRM / B 3.3-17f 03/22/2006 Pages TRM / B 3.3-18 and TRM / B 3.3-19 08/03/2010 Page TRM / B 3.3-20 10/22/2003 Page TRM / B 3.3-21 05/16/2003 Pages TRM / B 3.3-22 and TRM / B 3.3-23 04/07/2009 B 3.4 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 08/31/1998 Pages TRM / B 3.4-2 and TRM / B 3.4-3 04/01/2009 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 Pages TRM / B 3.4-7 and TRM / B 3.4-8 04/25/2013 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 through TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/27/2008 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B.3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM / B 3.7-3 06/10/2010 Page TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Page TRM / B 3.7-6 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 05/29/2013 Page TRM / B 3.7-9 04/11/2014 Page TRM / B 3.7-10 08/02/1999 Page TRM/ B 3.7-10a 03/31/2006 Page TRM / B 3.7-11 08/02/1999 Page TRM / B 3.7-11a 03/31/2006 Pages TRM / B 3.7-12 and TRM / B 3.7-13 08/02/1999 Pages TRM / B 3.7-14 and TRM / B 3.7-14a 09/25/2012 TRM / LOES-7 EFFECTIVE DATE 04/23/2015 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT I1 TRM / LOES-7 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 82 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / B 3.7-14b 11/24/2011 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17through B 3.7-20 08/31/1998 Page TRM /.B 3.7-21 05/29/2013 Pages TRM / B 3.7-21a through TRM / B 3.7-21d 05/24/2012 Pages TRM / B 3.7-21e through TRM / B 3.7-21g 05/29/2013 Page TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Page TRM / B 3.7-24 10/05/2006 Page TRM / B 3.7-25 01/21/2014 Pages TRM / B 3.7-26 through TRM / B 3.7-28 10/05/2006 Pages TRM / B 3.7-29 and TRM / B 3.7-30 06/07/2007 Page TRM / B 3.7-30a 10/05/2006 Page TRM / B 3.7-30b 01/21/2014 Page TRM / B 3.7-31 11/30/2011 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 Pages TRM / B 3.7-36 through TRM / B 3.7-39 04/01/2009 Page TRM / B 3.7-40 04/08/2010 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Page TRM / B 3.8-2 01/28/2005 Page TRM / B 3.8-2a 03/01/2010 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 09/03/2004 Page TRM / B 3.8-4a 04/02/2002 Page B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-15 04/02/2002 Page TRM / B 3.8-16 11/07/2013 Page TRM / B 3.8-17 11/30/2011 Pages TRM / B 3.8-17a and TRM / B 3.8-17b 11/30/2011 Pages TRM / B 3.8-18 through TRM / B 3.8-20 05/29/2013 Pages TRM / B 3.8-21 and TRM / B 3.8-22 05/28/2009 Page TRM / B 3.8-23 05/29/2013 Page TRM / B 3.8-24 05/28/2009 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 08/31/1998 SUSQUEHANNA - UNIT 1 TRM / LOES-8 EFFECTIVE DATE 04/23/2015

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 82 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/22/2006 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Page TRM / B 3.10-6 03/27/2008 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/30/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-11a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/30/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 Page TRM / B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23 11/14/2006 Pages TRM / B 3.11-23a and TRM / B 3.11-23b 06/18/2013 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 and B 3.11-27 08/30/1998 Page TRM / B 3.11-28 11/30/2005 Page TRM / B 3.11-29 02/19/2015 Pages TRM / B 3.11-30 and TRM / B 3.11-31 05/29/2013 Page TRM / B 3.11-32 08/30/1998 Page TRM / B 3.11-33 06/30/2010 Pages B 3.11-34 and B 3.11-35 08/30/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 09/19/2007 Page TRM / B 3.12-2 11/29/2010 Page TRM / B 3.12-3 02/05/1999 TRM1 text LOES 4/23/2015 SUSQUEHANNA - UNIT 1 TRM / LOES-9 EFFECTIVE DATE 04/23/2015

Plant Programs PPL Rev. 2 2.0 PLANT PROGRAMS AND SETPOINTS 2.1 Plant Programs Table 2.1-1 lists the Plant Programs required as a result of the plant Technical Specification or other Plant License condition. Each program listing identifies the program source and implementing documents and is intended to provide an index to these documents only.

SUSQUEHANNA - UNIT 1 TRM / 2.0-1 EFFECTIVE DATE 04/23/2015

Plant Programs PPL Rev. 2 2.1 Table 2.1-1 PLANT PROGRAMS (Page 1 of 3)

PROGRAM DESIGNATION PROGRAM SOURCE IMPLEMENTING DOCUMENT 2.1.1 Offsite Dose Calculation Manual Tech Spec 5.5.1 ODCM-QA-001 ODCM Introduction (0DCM) ODCM-QA-002 ODCM Review and Revision Control ODCM-QA-003 Effluent Monitor Setpoints ODCM-QA-004 Airborne Effluent Dose Calculations ODCM-QA-005 Waterbome Effluent Dose Calculations ODCM-QA-006 Total Dose Calculations ODCM-QA-007 Radioactive Waste Treatment Systems ODCM-QA-008 Radiological Environmental Monitoring Program ODCM-QA-009 Dose Assessment Policy Statements 2.1.2 Primary Coolant Sources Outside Tech Spec 5.5.2 NSEP-QA-401 System Leakage Quantification Program Containment 2.1.3 Not Used (continued)

SUSQUEHANNA -UNIT 1 TRM / 2.0-2 EFFECTIVE DATE 01/28/2005

Plant Programs PPL Rev. 2 2.1 Table 2.1-1 PLANT PROGRAMS (Page 2 of 3)

PROGRAM DESIGNATION PROGRAM SOURCE IMPLEMENTING DOCUMENT 2.1.4 Radioactive Effluent Controls Tech Spec 5.5.4 TRO 2.1.1 ODCM TRO 3.6.1 Containment VENTING and PURGING TRO 3.11 Series RADIOACTIVE EFFLUENTS 2.1.5 Component Cyclic or Transient Tech Spec 5.5.5 NEPM-QA-0901 Plant Transient and Fatigue Monitoring Program Limit 2.1.6 Inservice Testing Tech Spec 5.5.6 NDAP-QA-0423 Station Pump and Valve Testing Program 2.1.7 Ventilation Filter Testing Tech Spec 5.5.7 NDAP-QA-0407 Filter Testing of HEPA and Charcoal Filtration Units NDAP-QA-1 180 Storage Tank Radioactivity Monitoring Program 2.1.8 Explosive Gas and Storage Tank Tech Spec 5.5.8 TRO 3.7.5.1 Main Condenser Offgas Hydrogen Monitor Radioactivity Monitoring TRO 3.7.5.2 Main Condenser Explosive Gas Mixture (continued)

SUSQUEHANNA - UNIT 1 TRM / 2.0-3 EFFECTIVE DATE 01/28/2005

Plant Programs PPL Rev. 2 2.1 Table 2.1-1 PLANT PROGRAMS (Paqe 3 of 3)

PROGRAM DESIGNATION PROGRAM SOURCE IMPLEMENTING DOCUMENT 2.1.9 Diesel Fuel Oil Testing Tech Spec 5.5.9 NDAP-QA-0633 Diesel Fuel Oil Testing 2.1.10 Technical Specification (TS) Bases Tech Spec 5.5.10 NDAP-QA-0730 Controlling Changes to Licensing Documents Control 2.1.11 Safety Function Determination Tech Spec 5.5.11 NDAP-QA-0312 Safety Function Determination Program 2.1.12 Primary containment Leakage Tech Spec 5.5.12 NDAP-QA-0412 Leakage Rate Test Program Rate Testing Teem___e__5.5.12_NAP-_A-04_2__eakageRateTest__rogram 2.1.13 Fire Protection Item d; NDAP-QA-0449 Fire Protection Program Tech Spec 5.4.1 SUSQUEHANNA - UNIT I TRM / 2.0-4 EFFECTIVE DATE 6/25/2002

Core Operating Limits Report (COLR)

PPL Rev. 15 3.2.1 3.2 Core Operating Limits Report (COLR) 3.2.1 Core Operating Limits Report (COLR)

TRO 3.2.1 The Core Operating Limits specified in the attached COLR shall be met.

APPLICABILITY: Specified in the referenced Technical Specifications.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Core Operating Limits not A.1 Perform action(s) described Specified in met. in referenced Technical referenced Specification. Technical Specifications.

TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY


NOTE -----....------------------------------- N/A No associated Surveillances. Surveillances are implemented in the applicable Technical Specifications.

SUSQUEHANNA - UNIT I TRM /13.2-1 EFFECTIVE DATE 07/07/1999

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 1 of 53 Susquehanna SES Unit I Cycle 19 CORE OPERATING LIMITS REPORT Nuclear Fuels Engineering April 2015 pp, ;:

SUSQUEHANNA UNIT 1 TRM/3. 2- 2 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 2 of 53 CORE OPERATING LIMITS REPORT REVISION DESCRIPTION INDEX Rev. Affected No. Sections Description/Purpose of Revision 0 ALL Issuance of this COLR is in support of Unit 1 Cycle 19 operation.

1 ALL New COLR required due to Power/Flow Map revision.

FORM NFP-QA-008-2, Rev. 1 SUSQUEHANNA UNIT 1 TRIVI/3.2-3 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 3 of 53 SUSQUEHANNA STEAM ELECTRIC STATION Unit I Cycle 19 CORE OPERATING LIMITS REPORT Table of Contents 1.0 INTRO D UCTIO N .................................................................................................... 4 2.0 D E FIN ITIO NS ....................................................................................................... 5 3.0 SHUTDOWN MARGIN .......................................................................................... 6 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) .................. 7 5.0 MINIMUM CRITICAL POWER RATIO (MCPR) ...................................................... 9 6.0 LINEAR HEAT GENERATION RATE (LHGR) ....................................................... 24 7.0 ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY R EQ UIR EM ENTS ................................................................................................... 32 8.0 RECIRCULATION LOOPS - SINGLE LOOP OPERATION .................................... 34 9.0 POW ER / FLO W MAP ............................................................................................ 49 10.0 O PRM SETPO INTS .............................................................................................. 51 11.0 R E FER EN C ES ........................................................................................................ 52 SUSOUEHANNA UNIT 1 TRM/3. 2-4 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 4 of 53

1.0 INTRODUCTION

This CORE OPERATING LIMITS REPORT for Susquehanna Unit 1 Cycle 19 is prepared in accordance with the requirements of Susquehanna Unit 1, Technical Specification 5.6.5. As required by Technical Specifications 5.6.5, core shutdown margin, the core operating limits, RBM setpoints, and OPRM setpoints presented herein were developed using NRC-approved methods and are established such that all applicable limits of the plant safety analysis are met.

SUSQUEHANNA UNIT 1 TRM/3. 2-5 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 5 of 53 2.0 DEFINITIONS Terms used in this COLR but not defined in Section 1.0 of the Technical Specifications or Section 1.1 of the Technical Requirements Manual are provided below.

2.1 The AVERAGE PLANAR EXPOSURE at a specified height shall be equal to the total energy produced per unit length at the specified height divided by the total initial weight of uranium per unit length at that height.

2.2 The PELLET EXPOSURE shall be equal to the total energy produced per unit length of fuel rod at the specified height divided by the total initial weight of uranium per unit length of that rod at that height.

2.3 FDLRX is the ratio of the maximum LHGR calculated by the core monitoring system for each fuel bundle divided by the LHGR limit for the applicable fuel bundle type.

2.4 LHGRFACf is a multiplier applied to the LHGR limit when operating at less than 108 Mlbm/hr corb flow. The LHGRFACf multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from core flows less than 108 Mlbm/hr.

2.5 LHGRFACP is a multiplier applied to the LHGR limit when operating at less than RATED THERMAL POWER. The LHGRFACP multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from partial power conditions.

2.6 MFLCPR is the ratio of the applicable MCPR operating limit for the applicable fuel bundle type divided by the MCPR calculated by the core monitoring system for each fuel bundle.

2.7 MAPRAT is the ratio of the maximum APLHGR calculated by the core monitoring system for each fuel bundle divided by the APLGHR limit for the applicable fuel bundle type.

2.8 OPRM is the Oscillation Power Range Monitor. The Oscillation Power Range Monitor (OPRM) will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR safety limit is not violated.

2.9 Np is the OPRM setpoint for the number of consecutive confirmations of oscillation half-cycles that will be considered evidence of a stability related power oscillation.

2.10 Sp is the OPRM trip setpoint for the peak to average OPRM signal.

2.11 Fp is the core flow, in Mlbm / hr, below which the OPRM RPS trip is activated.

SUSQUEHANNA UNIT 1 TRM/3. 2- 6 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-001 Rev. I Page 6 of 53 3.0 SHUTDOWN MARGIN 3.1 Technical Specification Reference Technical Specification 3.1.1 3.2 Description The SHUTDOWN MARGIN shall be equal to or greater than:

a) 0.38% Ak/k with the highest worth rod analytically determined OR b) 0.28% Ak/k with the highest worth rod determined by test Since core reactivity will vary during the cycle as a function of fuel depletion and poison burnup, Beginning of Cycle (BOC) SHUTDOWN MARGIN (SDM) tests must also account for changes in core reactivity during the cycle. Therefore, the SDM measured at BOC must be equal to or greater than the applicable requirement from either 3.2.a or 3.2.b plus an adder, "R". The adder, "R", is the difference between the calculated value of maximum core reactivity (that is, minimum SDM) during the operating cycle and the calculated BOC core reactivity. If the value of "R" is zero (that is, BOC is the most reactive point in the cycle) no correction to the BOC measured value is required.

The SHUTDOWN MARGIN limits provided in 3.2a and 3.2b are applicable in MODES 1, 2, 3, 4, and 5. This includes core shuffling.

SUSQUEHANNA UNIT I TRM/3. 2-7 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 7 of 53 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) 4.1 Technical Specification Reference Technical Specification 3.2.1 4.2 Description The APLHGRs for ATRIUMTM-10 fuel shall not exceed the limit shown in Figure 4.2-1.

The APLHGR limits in Figure 4.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Two Loop operation. The APLHGR limits for Single Loop operation are provided in Section 8.0.

SUSQUEHANNA UNIT 1 TRM/3. 2-8 EFFECTIVE DATE 04/21/2015

(I)

SSES UNIT I CYCLE 19 c/i 16.0 C

I-H 14.0 S

T_E12.0

-J "0

m M 10.0 r-t-n 0

ig..

rn 8.0 C-6.0 C--

4.0 0 10000 20000 30000 40000 50000 60000 70000 Average Planar Exposure (MWDIMTU) "u AVERAGE PLANAR LINEAR HEAT GENERATION RATE LIMIT VERSUS co z (Dn AVERAGE PLANAR EXPOSURE -TWO LOOP OPERATION 0 c 0Z; ATRIUMTM-10 FUEL 0* -< CD C:)

FIGURE 4.2-1 OC a

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 9 of 53 5.0 MINIMUM CRITICAL POWER RATIO (MCPR.

5.1 Technical Specification Reference Technical Specification 3.2.2, 3.3.4.1, 3.7.6, and 3.7.8 5.2 Description The MCPR limit is specified as a function of core power, core flow, average scram insertion time per Section 5.3 and plant equipment operability status. The MCPR limits for all fuel types (ATRIUMTM-10) shall be the greater of the'Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.

a) Main Turbine Bypass / EOC-RPT I Backup Pressure Regulator Operable Figure 5.2-1: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-2: Power-Dependent MCPR value determined from BOC to EOC b) Main Turbine Bypass Inoperable Figure 5.2-3: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-4: Power-Dependent MCPR value determined from BOC to EOC c) EOC-RPT Inoperable Figure 5.2-5: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-6: Power-Dependent MCPR value determined from BOC to EOC d) Backup Pressure Regulator Inoperable Figure 5.2-7: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-8: Power Dependent MCPR value determined from BOC to EOC The MCPR limits in Figures 5.2-1 through 5.2-8 are valid for Two Loop operation.

The MCPR limits for Single Loop operation are provided in Section 8.0.

SUSQUEHANNA UNIT I TRM/3. 2 -10 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-O01 Rev. 1 Page 10 of 53 5.3 Avera-ge Scram Time Fraction If the average measured scram times are greater than the Realistic Scram times listed in Table 5.3-1 then the MCPR operating limits corresponding to the Maximum Allowable Average Scram Insertion Time must be implemented.

Determining MCPR operating limits based on interpolation between scram insertion times Is not permitted. The evaluation of scram insertion time data, as it relates to the attached table should be performed per Reactor Engineering procedures.

SUSQUEHANNA UNIT 1 TRM/3.2-11 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 11 of 53 Main Turbine Bypass I EOC-RPT I Backup Pressure Regulator Operable SUSOUEHANNA UNIT 1 TRM/3. 2-12 EFFECTIVE DATE 04/21/2015

Cl)

SSES UNIT 1 CYCLE 19 U) 2.2 I I I I m LEGEND 2.1 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 2.0 CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME I.

1.9 t *1~ t-I SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 E i 1.8

-j USED IN DETERMINING MFLCPR 1.7 W

0 .

0 CD 130, 1.581...

1.6 c,1 1.5 m

~11

-n m 1.4 C-)

REFERENCE:

T.S. 3.2.2 rn 1.3 108, 1.22 m 1.2 30 40 50 60 70 80 90 100 110 Total Core Flow (MLBIHR)

N) -0 -u (D

MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW N) MAIN TURBINE BYPASS I EOC-IRPT I BACKUP PRESSURE REGULATOR OPERABLE 0(D I, TWO LOOPOPERATION (BOC TO EOC)

U, " :

FIGURE 5.2-1

SSES UNIT I CYCLE 19 c: 3.6 E

-i o ;u 0 CD 5,.

rni

-ni

-D Na 60 Core Power (% RATED) -v -0 co MCPR OPERATING LIMIT VERSUS CORE POWER CD z MAIN TURBINE BYPASS I EOC-RPT / BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC) CCD FIGURE 5.2-2 -..

PPL Rev. 15. PL-NF-14-001 Rev. I Page 14 of 53 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT 1 TRM/3. 2-15 EFFECTIVE DATE 04/21/2015

(-I-)

SSES UNIT 1 CYCLE 19 2.2 ,I I . . .. I C LEGEND m

2.1 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 2.0 SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 1.9 I~ '1 130,1.801 USED IN DETERMINING MFLCPR E

1.8

-H CL 1.7 0.

o.

a. A 1.6 01 B ,

1.5 m

-n, m 1.4 C-)

-H K

REFERENCE:

T.S. 3.7.6 and 3.2.2 F~

1.3 m

c:) 1.2 30 40

_ _L I 50 60 70 80 90 100 110 N) Total Core Flow (MLBIHR) -~-D MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW , -n MAIN TURBINE BYPASS INOPERABLE cn 0-C TWO LOOP OPERATION (BOC TO EOC)

FIGURE 5.2-3

SSES UNIT 1 CYCLE 19 3.6 (f)

E 0_

CL I-(--q 0 (D

£2.

0 m

N~)

s 20 30 40 50 60 70 80 90 100 Core Power (% RATED)

MCPR OPERATING LIMIT VERSUS CORE POWER cD) z

-~-n MAIN TURBINE BYPASS INOPERABLE TWO LOOP OPERATION (BOC to EOC) 01  %. :< 0ý FIGURE 5.2-4 CA' 0 C

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 17 of 53 EOC-RPT Inoperable SUSQUEHANNA UNIT I TRM/3.2-18 EFFECTIVE DATE 04/21/2015

0 SSES UNIT 1 CYCLE 19 C,) 2.2 LEGEND m

2.1 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM

= INSERTION TIME 2.0 4 4 .4.-

CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME

-A 1.9 4 4-~I I

SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 t

1.8 I.

1 -- 4 USED IN DETERMINING MFLCPR 2 1.7 (D

30,1.58 -

1.6 (JI 1.5 1.4

-n

REFERENCE:

T.S. 3.3.4.1 and 3.2.2 m 1.3 108, 1.22 N.)

1.2 30 40 50 60 70 80 90 100 110 Total Core Flow (MLBIHR)

(D MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW EOC-RPT INOPERABLE " C LI. TWO LOOP OPERATION (BOC TO EOC)

Ocy - C FIGURE 5.2-5 CA) -Q

(A SSES UNIT I CYCLE 19 (A 3.6 m

cz

-H CL H

0 CD 5-m

-n

-n m

m mr 1.2 20 30 40 50 60 70 80 90 100 Core Power (% RATED) -0 -

L:) CD MCPR OPERATING LIMIT VERSUS CORE POWER EOC-RPT INOPERABLE C.0 TWO LOOP OPERATION (BOC to EOC) O(D FIGURE 5.2-6 5.4

PPL Rev. 15 PL-NF-14-001 Rev. I Page 20 of 53 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1 TRM/3.2-21 EFFECTIVE DATE 04/21/2015

SSES UNIT I CYCLE 19 2.2 LEGEND.

2.1 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 2.0 CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 1.9 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 E

m 1.8 USED IN DETERMINING MFLCPR CL 0 1.7

-Ti

(-

a.

1.6 m

1.5 A

1.4 C-,

IREFERENCE:

T.S. 3.7.8 and 3.2.21 1.3 F 4- I 4 ,-.... -I 108,1.22 nri 1.2 30 40 50 60 70 80 90 100 110 Total Core Flow (MLB/HR)

MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE 0 C ft c C,, TWO LOOP OPERATION (BOC TO EOC)

FIGURE 5.2-7 CA C

SSES UNIT I CYCLE 19 3.6 (A

E nf (D -C 0.

C-)

C)

C) 1t00, 1.351 20 .30 40 50 60 70 80 90 100 Core Power (% RATED) -o I-CD z MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE (0 TWO LOOP OPERATION (BOC to EOC) <0o FIGURE 5.2-8

  • o

PPL Rev. 15 PL-NF-14-001 Rev. I Page 23 of 53 Table 5.3-1 Average Scram Time Fraction Table For Use With Scram Time Dependent MCPR Operating Limits Control Rod Average Scram Time to Position (seconds)

Position 45 0.470 0.520 39 0.630 0.860 25 1.500 1.910 5 2.700 3.440 Averajge Scram Realistic Maximum Insertion Time Allowable SUSQUEHANNA UNIT 1 TRM/3. 2 - 24 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 24 of 53 6.0 LINEAR HEAT GENERATION RATE (LHGR) 6.1 Technical Specification Reference Technical Specification 3.2.3, 3.3.4.1, 3.7.6, and 3.7.8 6.2 Description The maximum LHGR for ATRIUM T M-10 fuel shall not exceed the LHGR limit determined from Figure 6.2-1. The LHGR limit in Figure 6.2-1 is valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.

To protect against both fuel centerline melting and cladding strain during anticipated system transients initiated from reduced power and flow conditions, power and flow dependent LHGR limit multipliers are provided. The following figures are applicable to EOC-RPT Operable and Inoperable and Backup Pressure Regulator Operable and Inoperable:

a) Main Turbine Bypass Operable.

Figure 6.2-2: Flow-Dependent LHGR Limit Multiplier Figure 6.2-3: Power-Dependent LHGR Limit Multiplier b) Main Turbine Bypass Inoperable Figure 6.2-4: Flow-Dependent LHGR Limit Multiplier Figure 6.2-5: Power-Dependent LHGR Limit Multiplier The LGHR limit and LHGR limit multipliers in Figures 6.2-1 through 6.2-5 are valid for both Two Loop and Single Loop operation.

SUSQUEHANNA UNIT I TRM/3. 2 - 25 EFFECTIVE DATE 04/21/2015

SSES UNIT I CYCLE 19 a 16.0 c-fl 0

a m

r 14.0 a

-H I'

12.0 2

0 (U

C

-0 0

(U 10.0 0

C CD 0

CD (U cm 0

r (U

0 C

=

6.0 m

N) 4.0 C" 0 10000 20000 30000 40000 50000 60000 70000 80000 Pellet Exposure (MWDIMTU) co LINEAR HEAT GENERATION RATE LIMIT VERSUS PELLET EXPOSURE CD ATRIUMTM-10 FUEL FIGURE 6.2-1 0r CD

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 26 of 53 Main Turbine Bypass Operable SUSQUEHANNA UNIT I TRM/3. 2 -27 EFFECTIVE DATE 04/21/2015

V)

SSES UNIT 1 CYCLE 19 (A 1.10 m

1.00 0.90 0.80 CL co -u 0.70 0 CD c,'

0.

LL 0.60 m 0.50 mr 0.40 0.30 30 40 50 60 70 80 90 100 110 Total Core Flow (MLB/hr)

FLOW DEPENDENT LHGR LIMIT MULTIPLIER -4 MAIN TURBINE BYPASS OPERABLE 0CD h CD ATRlUMTM-10 FUEL U, C FIGURE 6.2-2

SSES UNIT 1 CYCLE 19 1.10 CD m a)

-V CL -u (D

02 0

(L.

CD' m

CD L71 20 30 40 50 60 70 80 90 100 Core Power (% RATED)

CD POWER DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS OPERABLE (0 ATRIUMTM-10 FUEL C."

FIGURE 6.2-3

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 29 of 53 Main Turbine Bypass Inoperable SUSQUEHANNA UN IT 1 TRM/3.2-30 EFFECTIVE DATE 04/21/2015

SSES UNIT 1 CYCLE 19

.CD 1.10 1.00 0.90 0.80 I-0 r-0.70 CD CD M

0=.

03 r-H cn 0.60 o

U-.

0.50 0.40 C~)

I--

(x 0.30 30 40 50 60 70 80 90 100 110 Total Core Flow (MLBIHR)

-U 0

FLOW DEPENDENT LHGR LIMIT MULTIPLIER Co CD MAIN TURBINE BYPASS INOPERABLE -n 0

ATRIUMTM-10 FUEL 0 CD, FIGURE 6.2-4 01

<0.

0>

C,)

SSES UNIT I CYCLE 19 C

1.10 m

II C

I.

-1

.2-

-u0

-H rI-CD CL (A

0 0)1

(~0 a,.

1N3 m

m m

m

-H m

-H m

20 30 40 50 60 70 80 90 100 Core Power (% RATED) -0 -u N)

I.

POWER DEPENDENT LHGR LIMIT MULTIPLIER CD MAIN TURBINE BYPASS INOPERABLE ATRIUMTM-10 FUEL 0OCD FIGURE 6.2-5 "~ < 0

0) 0

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 32 of 53 7.0 ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY REQUIREMENTS 7.1 Technical 9pecification Reference Technical Specification 3.3.2.1 7.2 Description The RBM Allowable Value and Trip Setpoints for; a) Low Power Range Setpoint, b) Intermediate Power Range Setpoint, c) High Power Range Setpoint, d) Low Power Range - Upscale, e) Intermediate Power Range - Upscale, and f) High Power Range - Upscale shall be established as specified in Table 7.2-1. The RBM setpoints are valid for Two Loop and Single Loop Operation, Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.

The RBM system design objective is to block erroneous control rod withdrawal initiated by the operator before fuel design limits are violated. If the full withdrawal of any control rod would not violate a fuel design limit, then the RBM system is not required to be operable. Table 7.2-2 provides RBM system operability requirements to ensure that fuel design limits are not violated.

SUSQUEHANNA UNIT I TRM/3. 2 -33 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 33 of 53 Table 7.2-1 RBM Setpoints Allowable Nominal Trip Function Valued1 ) Setpoint Low Power Range Setpoint 28.0 24.9 Intermediate Power Range Setpoint 63.0 61.0 High Power Range Setpoint 83.0 81.0 Low Power Range - Upscale 123.4 123.0 Intermediate Power Range - Upscale 117.4 117.0 High Power Range - Ups cale 107.6 107.2 (1) Power setpoint function (Low, Intermediate, and High Power Range Setpoints) determined in percent of RATED THERMAL POWER. Upscale trip setpoint function (Low, Intermediate, and High Power Range Upscale) determined in percent of reference level.

Table 7.2-2 RBM System Operability Requirements Thermal Power MCPR (2,3)

(% of Rated)__________________

Ž__28 and <90 < 1.76

_Ž90 and <95 < 1.47

> 95 < 1.70 (2) Applicable to Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.

(3) Applicable to both Two Loop and Single Loop Operation.

SUSQUEHANNA UNIT 1 TRM/3. 2-34 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-001 Rev. I Page 34 of 53 8.0 RECIRCULATION LOOPS - SINGLE LOOP OPERATION 8.1 Technical Specification Reference Technical Specification 3.2.1, 3.2.2, 3.2.3, 3.3.4.1, 3.4.1, 3.7.6, and 3.7.8 8.2 Description APLHGR The APLHGR limit for ATRIUMTM-10 fuel shall be equal to the APLHGR Limit from Figure 8.2-1.

The APLHGR limits in Figure 8.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Single Loop operation.

Minimum Critical Power Ratio Limit The MCPR limit is specified as a function of core power, core flow, and plant equipment operability status. The MCPR limits for all fuel types (ATRIUMT M -10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.

a) Main Turbine Bypass / EOC-RPT / Backup Pressure Regulator Operable Figure 8.2-2: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-3: Power-Dependent MCPR value determined from BOC to EOC b) Main Turbine Bypass Inoperable Figure 8.2-4: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-5: Power-Dependent MCPR value determined from BOC to EOC c) EO.C-RPT Inoperable Figure 8.2-6: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-7: Power-Dependent MCPR value determined from BOC to EOC d) Backup Pressure Regulator Inoperable Figure 8.2-8: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-9: Power-Dependent MCPR value determined from BOC to EOC SUSQUEHANNA UNIT 1 TRM/3. 2-35 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-001 Rev. I Page 35 of 53 The MCPR limits in Figures 8.2-2 through 8.2-9 are valid only for Single Loop operation.

Linear Heat Generation Rate Limit The LHGR limits for Single Loop Operation are defined in Section 6.0.

RBM Setpoints and Operability Requirements The RBM setpoints and operability requirements for Single Loop Operation are defined in Section 7.0.

SUSQUEHANNA UNIT 1 TRM/3. 2-36 EFFECTIVE DATE 04/21/2015

0 SSES UNIT I CYCLE 19 16.0 m

14.0 E- 12.0

.10 N.)

r-CD CA

-T- 4-0 1* 80o

,_0

-n m

6.0 4.0 0.0 10000.0 20000.0 30000.0 40000.0 50000.0 60000.0 70000.0 Average Planar Exposure (MWDIMTU) -0 -U CD N.) AVERAGE PLANAR LINEAR HEAT GENERATION RATE LIMIT VERSUS

E AVERAGE PLANAR EXPOSURE - SINGLE LOOP OPERATION 0 C Vi ATRIUMTM-10 FUEL -n FIGURE 8.2-1

PPL Rev. 15 PL-NF-14-001 Rev. I Page 37 of 53 Main Turbine Bypass / EOC-RPT I Backup Pressure Regulator Operable SUSOUEHANNA UNIT I TRM/3. 2-38 EFFECTIVE DATE 04/21/2015

SSES UNIT 1 CYCLE 19 3.6 LEGEND 3.4 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 3.2 4-CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.0 t 1'--

E 2.8 2e 4 4 4- SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 m .J 03 2.6 M

a) USED IN DETERMINING MFLCPR I-"

0 2.4 CD (L

C0 2.2 2.0 CDA 1.8 REFERENCE T.S.

REFERENCE:

3.4.1. and 3.2. 2-T.S3. *10,14 1.6

-n 1.4 30 40 50 60 70 80 90 100 110 Total Core Flow (MLB/HR)

-D -z MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS / EOC-RPT / BACKUP PRESSURE REGULATOR OPERABLE (0 (D SINGLE LOOP OPERATION (BOC to EOC)

~< 03 FIGURE 8.2-2 CA1 R

V)

SSES UNIT I CYCLE 19 4.6 'I.

+ 4-I F(*FNIl 4.4 'I. 4-LEGE--

CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 4.2 INSERTION TIME 4.0 CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 23,3.72 2 =:Tý 3.61 CURVE C: CORE POWER <26% AND CORE FLOW <50 MLBM/HR

,J.u X i26, 3.56 1 I-- - I 3.4 C I I SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES 26,3.3_8 ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2

-u

-u 3.0 _USED IN DETERMINING MFLCPR I-n-

0 CD 0.

0C.- 2.8 ~1 0~I 2.6 6.01, 2.40 I-2.4 a*o 2.2 ]40, ___A

____________ 1 4. 4 +

I 1100, I 1.92 N) 2.0 J j ~ L...j.......a .1. J 4 F -~

1.8

REFERENCE:

T.S. 3.4.1 and 3.2.21_....

1.6 1.4 20 30 40 50 60 70 80 90 100 Core Power (% RATED)

MCPR OPERATING LIMIT VERSUS CORE POWER CD MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE (0,

SINGLE LOOP OPERATION (BOC to EOC) 00 CD FIGURE 8.2-3 -.  :)

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 40 of 53 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT 1 TRM/3. 2 -41 EFFECTIVE DATE 04/21/2015

SSES UNIT 1 CYCLE 19 4.2 I I I I.

(A LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 3.8 INSERTION TIME

-,_ CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.6 3.4 3.2 SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS E VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 o 3.0 USED IN DETERMINING MFLCPR r-2.8

0. CD 0ý fL 2.6 2.4 2.4 2.2 m

2.0 m

C-)

-H 1.8

REFERENCE:

T.S. 3.4.1, 3.7.6, and 3.2.2 108, 1.

m 1.6 1.4 30 40 50 60 70 80 90 100 110 Total Core Flow (MLBIHR) -U 0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW CD N) MAIN TURBINE BYPASS INOPERABLE 0CD SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8.2-4 (A).4'.,ý

c/)

SSES UNIT 1 CYCLE 19 (A) 4.2 23 41 I I I LEGEND m

4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 3.8 26, 3.81 CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 23, 3.61 I

3.6 ZIVZIZI Iz CURVE C: CORE POWER *26% AND CORE FLOW *50 MLBM/HR 3.4 C\

1I~Z~i38 I -,

E SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS

-j 3.2 VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2

-0 3.0 0 T USED IN DETERMINING MFLCPR 0i a.. 2.8 2.6 126.01, 2.45I 2.4 40,2.13, 2.2 m

60 I.D98 - -1 00,.981 r-H 2.0 ____________

____________ II

REFERENCE:

T.S. 3.4.1, 3.7.6, and 3.2.21

  • .t I I

-H 1.8 I I I I I I 20 30 40 50 60 70 80 90 100 Core Power (% RATED)

-~-0 MCPR OPERATING LIMIT VERSUS CORE POWER CD P,

MAIN TURBINE BYPASS INOPERABLE SINGLE LOOP OPERATION (BOC to EOC) (D 6 FIGURE 8.2-5 0(1~n

PPL Rev. 15 PL-NF-14-001 Rev. I Page 43 of 53 EOC-RPT Inoperable SUSQUEHANNA UNIT I .TRM/3.2-44 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-001 Rev. I Page 44 of 53 0

0 w0 000 0

00 0

-1 0--

0 D J0c z W0 L 0u zO I- - -J o~ Z Ul) wi 0.

C-,

0 u 0

0 c~)

0! 'DR ( I (4i R OR le ll N R cc 'R q*t m~ N4 N N N C4 - ~

l~i- BuIlejedo MId3 SUSOUEHANNA UNIT 1 TRM/3.2-45 EFFECTIVE DATE 04/21/2015

CA SSES UNIT I CYCLE 19 C 4.6 CA C

m

-H E

-j -u

-H C-CA 0~

01 m

-n

-n Ph C-)

-H m

Ph 20 30 40 50 60 70 80 90 100 Core Power (% RATED)

S.-

MCPR OPERATING LIMIT VERSUS CORE POWER N) EOC-RPT. INOPERABLE -Ah1 I' SINGLE LOOP OPERATION (BOC to EOC) c-fl FIGURE 8.2-7 0~

W1 "

PPL Rev. 15 PL-NF-14-001 Rev. I Page 46 of 53 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT I TRM/3. 2-47 EFFECTIVE DATE 04/21/2015

SSES UNIT 1 CYCLE 19 C,) 4.0 I I m 3.8 t k: MAXIMUM ALLOWABLE AVERAGE SCRAM

  • 1 3.6 *1~ t 1-- INSERTION TIME C= 3: REALISTIC AVERAGE SCRAM INSERTION TIME 3.4 I i i I K

3.2 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 E 3.0 4 4 4-4 2.8 4 4 4 .

USED IN DETERMINING MFLCPR 1

a-0 2.6 CD W,

2.4 co 2.2 m

2.0 ... 1.92 JA30, r1i C-)

1.8 mr _RFERENCE: T.S. 3.4.1, 3.7.8, and 3.2.2 108,1 1.6 mD 1.4 30 40 50 60 70 80 90 100 110 Total Core Flow (MLBIHR)

CD MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE SINGLE LOOP OPERATION (BOC to EOC) 1h' < C) 01n C FIGURE 8.2-8

SSES UNIT I CYCLE 19 V,) 4.6

-0 r-E CD cn1 Qý CL 0.

(L m

m m

m 20 30 40 50 60 70 80 90 100 Core Power (% RATED)

MCPR OPERATING LIMIT VERSUS CORE POWER (D z

,I. BACKUP PRESSURE REGULATOR INOPERABLE (0 (0)

SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8.2-9 0

PPL Rev. 15 PL-NF-14-001 Rev. I Page 49 of 53 9.0 POWER i FLOW MAP 9.1 Technical Specification Reference Technical Specification 3.3.1.1 9.2 Description Monitor reactor conditions to maintain THERMAL POWER / core flow outside of Stability Regions I and II of the Power I Flow map, Figure 9.1.

If the OPRM Instrumentation is OPERABLE per TS 3.3.1.1, Region I of the Power I Flow map is considered an immediate exit region.

If the OPRM Instrumentation is inoperable per TS 3.3.1.1, Region I of the Power

/ Flow map is considered an immediate scram region.

Region I1of the Power / Flow map is considered an immediate exit region regardless of the operability of the OPRM Instrumentation.

SUSQUEHANNA UNIT I TRM/3. 2 - 50 EFFECTIVE DATE 04/21/2015

PPL Rev. 16 Figure 9.1 SSE$ Unit I CybIe 19 Power/Flow Map SUSQUEHANNA UNIT I TRM/3.2-51 EFFECTIVE DATE 0412112015

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 51 of 53 10.0 OPRM SETPOINTS 10.1 Technical Specification Reference Technical Specification 3.3.1.1 10.2 Description Setpoints for the OPRM Instrumentation are established that will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR Safety limit is not violated. The setpoints are described in Section 2.0 and are listed below:

Sp = 1,11 7 15 S 60 MIbm / hr SUSQUEHANNA UNIT 1 TRM/3. 2 -52 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-001 Rev. I Page 52 of 53

11.0 REFERENCES

11.1 The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:

1. XN-NF-81-58(P)(A), Revision 2 and Supplements 1 and 2, "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," Exxon Nuclear Company, March 1984.
2. EMF-2361(P)(A), Revision 0, "EXEM BWR-2000 ECCS Evaluation Model,"

Framatome ANP, May 2001.

3. EMF-2292(P)(A), Revision 0, "ATRIUM T71-10: Appendix K Spray Heat Transfer Coefficients," Siemens Power Corporation, September 2000.
4. XN-NF-84-105(P)(A), Volume 1 and Volume I Supplements 1 and 2, "XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis," Exxon Nuclear Company, February 1987.
5. XN-NF-80-19(P)(A), Volume 1 and Supplements 1 and 2, "Exxon Nuclear Methodology for Boiling Water Reactors: Neutronic Methods for Design and Analysis," Exxon Nuclear Company, March 1983.
6. XN-NF-80-19(P)(A), Volumes 2, 2A, 2B, and 2C "Exxon Nuclear Methodology for Boiling Water Reactors: EXEM BWR ECCS Evaluation Model," Exxon Nuclear Company, September 1982.
7. XN-NF-80-19(P)(A), Volume 3 Revision 2 "Exxon Nuclear Methodology for Boiling Water Reactors Thermex: Thermal Limits Methodology Summary Description," Exxon Nuclear Company, January 1987.
8. XN-NF-80-19(P)(A), Volume 4, Revision 1, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company, June 1986.
9. XN-NF-85-67(P)(A), Revision 1, "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," Exxon Nuclear Company, Inc.,

September 1986.

10. ANF-524(P)(A), Revision 2 and Supplements 1 and 2, "Advanced Nuclear Fuels Corporation Critical Power Methodology for Boiling Water Reactors,"

November 1990.

11. NE-092-001A, Revision 1, "Licensing Topical Report for Power Uprate With Increased Core Flow," Pennsylvania Power & Light Company, December 1992 and NRC SER (November 30, 1993).

SUSQUEHANNA UNIT I TRM/3. 2 - 53 EFFECTIVE DATE 04/21/2015

PPL Rev. 15 PL-NF-14-001 Rev. 1 Page 53 of 53

12. ANF-89-98(P)(A) Revision I and Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs," Advanced Nuclear Fuels Corporation, May 1995.
13. EMF-2209(P)(A), Revision 3, "SPCB Critical Power Correlation," AREVA NP, September 2009.
14. EMF-85-74(P)(A), Revision 0, Supplement 1(P)(A) and Supplement 2(P)(A),

"RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model,"

Siemens Power Corporation, February 1998.

15. EMF-2158(P)(A), Revision 0, "Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/Microburn-B2," Siemens Power Corporation, October 1999.
16. EMF-CC-074(P)(A), Volume 4, Revision 0, "BWR Stability Analysis -

Assessment of STAIF with Input from MICROBURN-B2," Siemens Power Corporation, August 2000.

17. NEDO-32465-A, "BWROG Reactor Core Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.
18. ANF-913(P)(A), Volume 1 Revision 1 and Volume 1 Supplements 2, 3, and 4, "COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses,' Advanced Nuclear Fuels Corporation, August 1990.
19. ANF-1358(P)(A), Revision 3, "The Loss of Feedwater Heating Transient in Boiling Water Reactors," Framatome ANP, September 2005.

SUSQUEHANNA UNIT 1 TRM/3. 2 - 54 EFFECTIVE DATE 04/21/2015

Radioactive Gaseous Effluent Monitoring Instrumentation PPL Rev. 5 3.11.2.6 3.11 Radioactive Effluents 3.11.2 Gaseous Effluents 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation TRO 3.11.2.6 The radioactive gaseous effluent monitoring instrumentation channels shown in Table 3.11.2.6-1 shall be OPERABLE with their setpoints established in accordance with the ODCM to ensure that the limits of Requirement 3.11.2.1 are not exceeded.

APPLICABILITY: According to Table 3.11.2.6-1 ACTIONS


NOTE --------------------------------------------------------

1. Separate condition entry is allowed for each char
2. The provisions of TRO 3.0.6 are not applicable. I CONDITION REQUIRED ACTION COMPLETION TIME A. Radioactive gaseous A.1 Suspend the release of Immediately effluent monitoring radioactive gaseous effluents instrumentation channel monitored by the affected alarm/trip setpoint less channel conservative than required to ensure that the limits of OR Requirement 3.11.2.1 are not exceeded A.2 Declare the channel Immediately inoperable (continued)

SUSQUEHANNA - UNIT 1 TRM / 3.11-25 EFFECTIVE DATE 04/12/2007

Radioactive Gaseous Effluent Monitoring Instrumentation PPL Rev. 5 3.11.2.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Reactor Building B.1 Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Ventilation System while release is Noble Gas Activity in progress.

Monitor low range AND channel inoperable B.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> isotopic activity to the required of grab sample LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1)

AND B.3 Restore monitoring 30 days instrumentation C. Deleted D. Reactor Building D.1 Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Ventilation Monitoring while release is System Effluent System in progress Flow Rate Monitor or AND Sampler Flow Rate Monitor inoperable D.2 Restore monitoring 30 days instrumentation (continued)

SUSQUEHANNA - UNIT 1 TRM / 3.11-26 EFFECTIVE DATE 01/21/2004

Radioactive Gaseous Effluent Monitoring Instrumentation PPL Rev. 5 3.11.2.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. Turbine Building Ventilation E.1 Verify mechanical vacuum Immediately System Noble Gas Activity pump is not in operation

.Monitor low range channel inoperable AND E.2 Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while release is in progress AND E.3 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> isotopic activity to the after sample required LLDs for the principal noble gas gamma emitters (Table 3.11.2.1-1)

AND E.4 Restore monitoring 30 days instrumentation F. Deleted G. Turbine Building Ventilation G.1 Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Monitoring System Effluent while release is System Flow Rate Monitor in progress.

or Sampler Flow Rate AND Monitor inoperable G.2 Restore monitoring 30 days instrumentation (continued)

SUSQUEHANNA - UNIT 1 TRM / 3.11-27 EFFECTIVE DATE 01/21/2004

Radioactive Gaseous Effluent Monitoring Instrumentation PPL Rev. 5 3.11.2.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME H. Standby Gas Treatment H.1 Take grab samples Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> System Noble Gas Activity during operation of Monitor low range channel SGTS inoperable AND H.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> isotopic activity to the required of grab sample LLDs for principal noble gas being taken gamma emitters (Table 3.11.2.1-1)

AND H.3 Restore monitoring 30 days instrumentation Deleted J. SGTS Ventilation J.1 Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Monitoring System Effluent during operation of flow rate monitor or sample SGTS flow rate monitor AND inoperable J.2 Restore monitoring 30 days instrumentation (continued)

SUSQUEHANNA - UNIT 1 TRM / 3.11-28 EFFECTIVE DATE 09/08/2009

Radioactive Gaseous Effluent Monitoring Instrumentation PPL Rev. 5 3.11.2.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME K. Required Actions and K.1 Explain why this inoperability In the next Completion Times not met was not corrected in a timely Radioactive Effluent for Conditions B through J manner Release Report per TS Section 5.6 TECHNICAL REQUIREMENT SURVEILLANCE


NOTE ---------------------------------------------------------

Refer to Table 3.11.2.6-1 to determine which TRSs apply for each Monitoring Function.

SURVEILLANCE FREQUENCY TRS 3.11.2.6.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.11.2.6.2 Deleted TRS 3.11.2.6.3 Perform Source Check 31 days TRS 3.11.2.6.4 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.11.2.6.5 Perform CHANNEL CALIBRATION 24 months 4..

SUSQUEHANNA - UNIT 1 TRM / 3.11-29 EFFECTIVE DATE 12/03/2004

Radioactive Gaseous Effluent Monitoring Instrumentation PPL Rev. 5 3.11.2.6 TABLE 3.11.2.6-1 (Page 1 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS

1. REACTOR BUILDING VENTILATION MONITORING SYSTEM
a. Noble Gas Activity Monitor At all Times 1 TRS 3.11.2'6.1 (Low Range) TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5
b. Deleted
c. Deleted
d. Effluent System Flow Rate At all Times 1 TRS 3.11.2.6.1 Monitor TRS 3.11.2.6.4 TRS 3.11.2.6.5
e. Sampler Flow Rate Monitor At all Times 1 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)

SUSQUEHANNA - UNIT 1 TRM / 3.11-30 EFFECTIVE DATE 01/21/2004

Radioactive Gaseous Effluent Monitoring Instrumentation PPL Rev. 5 3.11.2.6 TABLE 3.11.2.6-1 (Page 2 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS

2. TURBINE BUILDING VENTILATION MONITORING SYSTEM
a. Noble Gas Activity Monitor At all Times 1 TRS 3.11.2.6.1 (Low Range) TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5
b. Deleted
c. Deleted
d. Effluent System Flow Rate At all Times 1 TRS 3.11.2.6.1 Monitor TRS 3.11.2.6.4 TRS 3.11.2.6.5
e. Sampler Flow Rate Monitor At all Times 1 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)

SUSQUEHANNA - UNIT 1 TRM / 3.11-31 EFFECTIVE DATE 01/21/2004

Radioactive Gaseous Effluent Monitoring Instrumentation PPL Rev. 5 3.11.2.6 TABLE 3.11.2.6-1 (Page 3 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS

3. STANDBY GAS TREATMENT SYSTEM (STGS) MONITOR
a. Noble Gas Activity Monitor During 1 TRS 3.11.2.6.1 (Low Range) operation of TRS 3.11.2.6.3 SGTS(a) TRS 3.11.2.6.4 TRS 3.11.2.6.5
b. Deleted
c. Deleted
d. Effluent System Flow Rate During 1 TRS 3.11.2.6.1 Monitor operation of TRS 3.11.2.6.4 SGTS(a) TRS 3.11.2.6.5
e. Sampler Flow Rate Monitor During 1 TRS 3.11.2.6.1 operation of TRS 3.11.2.6.4 SGTS(a) TRS 3.11.2.6.5 (a) TRO 3.0.4.c is applicable.

SUSQUEHANNA - UNIT 1 TRM / 3.11-32 EFFECTIVE DATE 04/23/2015