ML15131A348
| ML15131A348 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 04/29/2015 |
| From: | Gerlach R Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 028401, 2015-18560 | |
| Download: ML15131A348 (87) | |
Text
Apr. 29, 2015 Page 1
of 2
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2015-18560 USER INFORMATION:
GERLACH*ROSEY M EMPL#:028401 CA#:
0363 Address: NUCSA2 Phone#:
254-3194 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSEY M 04/29/2015 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 04/14/2015 ADD MANUAL TABLE OF CONTENTS DATE: 04/28/2015 CATEGORY: DOCUMENTS TYPE:
TRM2
,a
Apr.
29, 2015 Page 2
of 2
ID:
TEXT 3.2.1 ADD:
REV:
11 REMOVE:
REV:10 CATEGORY:
DOCUMENTS TYPE: TRM2 ID:
TEXT LOES ADD:
REV: 85 REMOVE:
REV:84 CATEGORY:
ID:
TEXT REMOVE:
DOCUMENTS TYPE: TRM2 TOC REV:23 ADD:
REV: 24 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL
- USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:
04/28/2015 Procedure TEXT LOES
Title:
TEXT TOC
Title:
Name Rev 85 LIST OF EFFECTIVE SECTIONS Issue Date 04/28/2015 Change ID Change Number 24 04/28/2015 TABLE OF CONTENTS TEXT 1.1 0
11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1
02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2. 2
Title:
11 01/31/2014 PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 6
03/05/2015
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT 3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT 3.1.3 4
05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
Title:
REACTIVITY CONTROL SYSTEMS CHECK VALVE 11/19/2002 CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND TEXT 3.2.1 11 04/28/2015
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
Page 1 of 15 Report Date: 04/28/15 Page 1 of 15 Report Date: 04/28/15
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0
11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3
03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 7
03/05/2015
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 4
04/29/2014
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1
11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3
05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 1
03/05/2015
Title:
WATER MONITORING INSTRUMENTATION PageZ of 15 Report Date: 04/28/15 Page 2 of 15 Report Date: 04/28/15
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1
Title:
REACTOR TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 3.4.6
Title:
REACTOR TEXT 3.5.1 1
04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 2 05/14/2009 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1
04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1
04/25/2013 RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION 1
02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1
11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2
04/29/2014
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3;6.3 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3 of 15 Report Date: 04/28/15 Page 3 of
.15 Report Date: 04/28/15
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0
11/19/2002 Titles CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7. 1
Title:
PLANT TEXT 3.7.2
Title:
PLANT TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT TEXT 3.7.3.4
Title:
PLANT TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT TEXT 3.7.3.7
Title:
PLANT TEXT 3.7.3.8
Title:
PLANT TEXT 3.7.4 Title.:
PLANT 0
11/19/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)
SHUTDOWN 0
11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)
AND GROUND WATER LEVEL 2
04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3
04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3
04/16/2009 SYSTEMS C02 SYSTEMS 2
04/16/2009 SYSTEMS HALON SYSTEMS 2
04/16/2009 SYSTEMS FIRE HOSE STATIONS 2
04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1
04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 11 09/27/2012 SYSTEMS FIRE DETECTION INSTRUMENTATION 1
04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM Page 4 of 15 Report Date: 04/28/15 Page4 of 15 Report Date: 04/28/15
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1 1
03/05/2015
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0
11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1
04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3
06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2
09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 9
03/05/2015
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1
08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 2
04/29/2014
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 1
10/02/2009
Title:
PLANT SYSTEMS TEXT 3.8.1 3
06/20/2012
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2
11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION CONTINUOUS TEXT 3.8.2.2 2
12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION AUTOMATIC Page 5 of 15 Report Date: 04/28/15
SSES MANTJAI..
Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3
Title:
ELECTRICAL TEXT 3.8.4
Title:
ELECTRICAL TEXT 3.8.5
Title:
ELECTRICAL TEXT 3.8.6
Title:
ELECTRICAL TEXT 3.8.7 2
06/20/2012 POWER DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 1
02/04/2005 POWER 24 VDC ELECTRICAL SUBSYSTEM 1
11/14/2013 POWER DEGRADED VOLTAGE PROTECTION 2
12/14/2006 POWER EMERGENCY SWITCHGEAR ROOM COOLING 2
10/22/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1
04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2
06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.11.1.1 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Page 6 of 15 Report Date: 04/28/15
SSES MANUJAL Manual Name:
TRM2
- Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2
Title:
RADIOACTIVE TEXT 3.11.1.3
Title:
RADIOACTIVE TEXT 3.11.1.4
Title:
RADIOACTIVE TEXT 3.11.1.5
Title:
RADIOACTIVE TEXT 3.11.2.1
Title:
RADIOACTIVE TEXT 3.11.2.2
Title:
RADIOACTIVE TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE TEXT 3.11.2.6
Title:
RADIOACTIVE TEXT 3.11.3
Title:
RADIOACTIVE TEXT 3.11.4.1
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
04/26/2006 LIQUID EFFLUENTS DOSE 1
04/26/2006 LIQUID WASTE TREATMENT SYSTEM 2
10/09/2012 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 3
03/05/2015 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3
04/26/2006 DOSE RATE 1
04/26/2006 DOSE -
NOBLE GASES 1
04/26/2006 DOSE -
11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM 4
07/03/2013 VENTILATION EXHAUST TREATMENT SYSTEM 5
03/05/2015 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 1
04/26/2006 TOTAL DOSE 4
03/05/2015 MONITORING PROGRAM Page 2 of 15 Report Date: 04/28/15 Page 7 of
.15 Report Date: 04/28/15
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0
11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3,12.2 4
04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3,12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4, 1
Title:
TEXT 4,2
Title:
TEXT 4,3
Title:
TEXT 4,4
Title:
TEXT 4.5
Title:
TEXT 4.6
Title:
TEXT 4,7
Title:
0 09/27/2003 ADMINISTRATIVE CONTROLS ORGANIZATION ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0
09/27/2003 CONTROLS REPORTABLE EVENT ACTION 0
09/27/2003 CONTROLS SAFETY LIMIT VIOLATION 1
12/18/2008 CONTROLS PROCEDURES & PROGRAMS 0
09/27/2003 CONTROLS REPORTING REQUIREMENTS 0
09/27/2003 CONTROLS RADIATION PROTECTION PROGRAM 0
09/27/2003 CONTROLS TRAINING Page ~
of 15 Report Date: 04/28/15 Page -a of 15 Report Date: 04/28/15
SSES MANUJAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 6
03/05/2015
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY TEXT B3.1.1 2
04/29/2014
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT B3.1.3 3
04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1
Title:
INSTRUMENTATION TEXT B3.3.2
Title:
INSTRUMENTATION TEXT B3.3.3
Title:
INSTRUMENTATION TEXT B3.3.4
Title:
INSTRUMENTATION TEXT B3.3.5
Title:
INSTRUMENTATION TEXT B3.3.6
Title:
INSTRUMENTATION 1
01/31/2014 BASES RADIATION MONITORING INSTRUMENTATION 2
03/31/2011 BASES SEISMIC MONITORING INSTRUMENTATION 2
11/09/2007 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 4
07/09/2010 BASES TRM POST ACCIDENT.MONITORING (PAM)
INSTRUMENTATION 2
11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 5
01/31/2014 BASES TRM ISOLATION ACTUATION INSTRUMENTATION Page ~.
of 15 Report Date: 04/28/15 Page 9 of
.15 Report Date: 04/28/15
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7 1
11/09/2007
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1
10/22/2003
Title:
INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 3
05/14/2009
Title:
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 3
02/22/2012
Title:
INSTRUMENTATION BASES REACT6R RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1
10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1
04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.4.6 1
04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Page 10 of 15 Report Date: 04/28/15
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1
Title:
11/19/2002 BASES ADS MANUAL INHIBIT TEXT B3.5.2 1
11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1
11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1
04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1
Title:
PLANT TEXT B3.7.2
Title:
PLANT TEXT B3.7.3.1
Title:
PLANT TEXT B3.7.3.2
Title:
PLANT TEXT B3.7.3.3
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 ULTIMATE HEAT SINK (UHS)
GROUND WATER LEVEL 3
06/15/2010 FIRE SUPPRESSION WATER SUPPLY SYSTEM 2
04/26/2006 SPRAY AND SPRINKLER SYSTEMS 0
11/19/2002 C02 SYSTEMS Page ii of 15 Report Date: 04/28/15 Page 11 of
.15 Report Date: 04/28/15
SSES MANUJAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4
Title:
PLANT TEXT B3.7.3.5
Title:
PLANT TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
Title:
PLANT TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 2
04/29/2014 HALON SYSTEMS 1
04/26/2006 FIRE HOSE STATIONS 1
04/26/2006 YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0
11/19/2002 FIRE RATED ASSEMBLIES 3
09/27/2012 FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SOLID RADWASTE SYSTEM 0
11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0
SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 LIQUID HOLDUP TANKS 4
06./04/2013 ESSW PUMPHOUSE VENTILATION 2
01/31/2008 TEXT B3.7.7
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 4
Title:
PLANT SYSTEMS BASES SNUBBERS 01/31/2014 Page i2~
of 15 Report Date-: 04/28/15 Page 12 of 15 Report Date-: 04/28/15
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 2
12/08/2011
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11
Title:
STRUCTURAL TEXT B3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT B3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT B3.8.2.2
Title:
ELECTRICAL AUTOMATIC TEXT B3.8.3
Title:
ELECTRICAL TEXT B3.8.4
Title:
ELECTRICAL TEXT B3.8.5
Title:
ELECTRICAL TEXT B3.8.6
Title:
ELECTRICAL TEXT B3.8.7 2
04/14/2010 INTEGRITY 2
03/i0/2010 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0
11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 1
- 09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD
.0 11/19/2002 POWER BASES DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 0
11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 1
11/14/2013 POWER BASES DEGRADED VOLTAGE PROTECTION 3
06/20/2012 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 2
06/04/2013 PROTECTION -
PROTECTION -
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Page i3~
of 15 Report Date: 04/28/15 Page 13 of
.15 Report Date: 04/28/15
SSES MANUIAL.
Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1
04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.11.1.1
Title:
RADIOACTIVE TEXT B3.11.1.2
Title:
RADIOACTIVE TEXT B3.11.1.3
Title:
RADIOACTIVE TEXT B3.11.1.4
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 0
11/19/2002 BASES LIQUID EFFLUENTS CONCENTRATION 0
11/19/2002 BASES LIQUID EFFLUENTS DOSE 0
BASES 11/19/2002 LIQUID WASTE TREATMENT SYSTEM 0
11/19/2002 BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5
Title:
RADIOACTIVE EFFLUENTS 0
BASES 11/19/2002 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
NOBLE GASES 0
Page 14 of 15 Report Date: 04/28/15 Page 14 of
.15 Report Date: 04/28/15
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3
Title:
RADIOACTIVE EFFLUENTS PARTICULATES FORM 0
BASES 11/19/2002 DOSE -
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 5
07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION 1
BASES 01/27/2004 RADIOACTIVE GASEOUS EFFLUENT MONITORING TEXT B3.11.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 5
03/05/2015
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.3
Title:
RADIOACTIVE EFFLUENTS 0
11/19/2002 BASES LAND USE CENSUS 0
BASES 11/19/2002 INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1
10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1
12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3
Title:
LOADS CONTROL PROGRAM 0
11/19/2002 BASES LIGHT LOADS REQUIREMENTS Page i5~
of 15 Report Date: 04/28/15 Page 15 of
.15 Report Date: 04/28/15
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 24 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 1.0 USE AND A PPLICATIO N.............................................................................
1.0-1 1.1 D efinitio ns...............................................................................................
1.0 -1 2.0 PLANT PROGRAMS AND SETPOINTS......................................................
2.0-1 2.1 Plant Program s.......................................................................................
2.0-1 2.2 Instrument Trip Setpoint Table........................
TRM/2.0-5 3.0 A PPLICA BILITY...................................................................................
TRM/3.0-1 3.0 Technical Requirement for Operation (TRO) Applicability.............. TRM/3.0-1 3.0 Technical Requirement Surveillance (TRS) Applicability............... TRM/3.0-3 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.2 3.2.1 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.3.6 3.3.7 3.3.8 3.3.9 3.3.10 3.3.11 3.3.12 3.4 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 3.4.6 REACTIVITY CONTROL SYSTEMS....................................................
TRM/3.1-1 Anticipated Transient Without Scram Alternate Rod Injection (ATWS-ARI) Instrumentation...........
.................... e............. TRM/3.1-1 Control Rod Drive (CRD) Housing Suppot................
TRM/3.1-4 Control Rod Block Instrumentation.....................
TRM/3.1-5 Control Rod Scram Accumulators Instrumentation C heck Valve.....................................................
............ TRM /3.1-9 CORE OPERATING LIMITS REPORT.
TRM/3,2-1 Core Operating Limits Report.
TRM/3.2-1 INSTRUMENTATION.
...TRM/3.3-1 Radiafion M o
e ton.............................................
TRM/3.3-1 Seismic Mon tion...................................... TRM/3.3-4 Meteorologic g Instrumentation.....................................
TRM/3.3-7 TRM Post-Acci Monitoring Instrumentation........................... TRM/3.3-9 Section Not Used.................................................................
TRM/3.3-12 TRM Isolation Actuation Instrumentation........................................
TRM/3.3-13 Main Turbine Overspeed Protection System................................
TRM/3.3-17 Section Not Used............................................................................
TRM /3.3-19 OPRM Instrumentation Configuration.............................................
TRMI3.3-21 Reactor Recirculation Pump MG Set Stops....................................
TRM/3.3-22 MVP Isolation Instrumentation........................................................
TRM/3.3-24 Water Monitoring Instrumentation...................................................
TRM/3.3-26 REACTOR COOLANT SYSTEM.........................................................
TRM/3.4-1 Reactor Coolant System Chemistry................................................
TRM/3.4-1 N ot U sed.........................................................................................
T RM /3.4-6 High/Low Pressure Interface Leakage Monitors............................. TRM/3.4-9 Reactor Recirculation Flow and Rod Line Limit.............
TRM/3.4-12 Reactor Vessel Materials............................................................
TRM/3.4-13 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction......................................................................
TRM /3.4-14 SUSQUEHANNA - UNIT 2 TRM / TOC-1 EFFECTIVE DATE 04/23/2015
SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
PPL Rev. 24 SECTION 3.5 3.5.1 3.5.2 3.5.3 3.6 3.6.1 3.6.2 3.6.3 3.6.4 TITLE PAGE EMERGENCY CORE COOLING AND RCIC........................................
TRM/3.5-1 A D S M anual Inhibit.........................................................................
T R M /3.5-1 ECCS and RCIC System Monitoring Instrumentation..................... TRM/3.5-3 Long Term Nitrogen Supply to ADS.......................................................
3.5-6 C O N T A IN M E N T...........................................................................................
3.6-1 V enting o r P urging..................................................................................
3.6-1 Suppression Chamber-to-Drywell Vacuum Breaker Position Ind icatio n.................................................
...................................... T R M /3.6 -3 Suppression Pool Alarm Instrumentation................................................
3.6-4 Primary Containment Closed System Boundaries TRM/3.6-7 3.7 3.7.1 3.7.2 3.7.3 3.7.3.1 3.7.3.2 3.7.3.3 3.7.3.4 3.7.3.5 3.7.3.6 3.7.3.7 3.7.3.8 3.7.4 3.7.5 3.7.5.1 3.7.5.2 3.7.5.3 3.7.6 3.7.7 3.7.8 3.7T9 3.7.10 3.7.11 3.8 3.8.1 3.8.2 3.8.2.1 3.8.2.2 3.8.3 PLANT SYSTEMS Emergency Service Water System (ESW) Shutdown TRM/3.7-1 TRM/3.7-1 Ultimate Heat Sink (UHS) and Ground W ater Level...............................
3.7-3 Fire Protection................................................................................
TRM/3.7-4 Fire Suppression W ater Supply System.........................................
TRM/3.7-4 Spray and Sprinkler Systems.........................................................
TRM/3.7-8 C02 systems..................................................................................
TRM/3.7-12 Halon Systems...............................................................................
TRM/3.7-16 Fire Hose Stations..........................................................................
TRM/3.7-18 Yard Fire Hydrants and Hydrant Hose Houses............................... TRM/3.7-22 Fire Rated Assemblies....................................................................
TRM/3.7-24 Fire Detection Instrumentation........................................................
TRM/3.7-26 Solid Radwaste System..................................................................
TRM/3.7-34 Explosive Gas and Storage Tank Radioactivity Monitoring Program........................................................................
TRM/3.7-37 Main Condenser Offgas Hydrogen Monitor....................................
TRM/3.7-37 Main Condenser Offgas Explosive Gas Mixture.....................................
3.7-38 Liquid Holdup Tanks.......................................................................
TRM/3.7-39 ESSW Pumphouse Ventilation......................................................
TRM/3.7-40 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Intrumentation.............................................................
TRM/3.7-41 S nu bbe rs.................................................
...................................... T R M /3.7-4 3 Control Structure HVAC..................................................................
TRM/3.7-49 Spent Fuel Storage Pools (SFSPs)................................................
TRM/3.7-.51 Structural Integrity...........................................................................
TRM/3.7-54 ELECTRICAL POW ER.........................................................................
TRM/3.8-1 Primary Containment Penetration Conductor Overcurrent Protective Devices..........................................................................
TRM/3.8-1 Motor Operated Valves Thermal Overload Protection.................... TRM/3.8.5 Motor Operated Valves (MOV) Thermal Overload Protection -
C ontinuo us.....................................................................................
T R M /3.8-5 Motor Operated Valves (MOV) Thermal Overload Protection -
A uto m atic........................................................................................
T R M /3.8-1 1 Diesel Generator (DG) Maintenance Activities...............................
TRM/3.8-13 I.
SUSQUEHANNA UNIT 2 TRM/TOC-2 EFFECTIVE DATE 04/23/2015 SUSQUEHANNA - UNIT 2 TRM / TOC-2 EFFECTIVE DATE 04123/2015
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 24 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.8.4 24 VDC Electrical Power Subsystem..............................................
TRM/3.8-15 3.8.5 Degraded Voltage Protection.........................................................
TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling...........................................
TRM/3.8-24 3.8.7 Battery Monitoring and Maintenance Program................................
TRM/3.8-26 3.9 REFUELING OPERATIONS................................
3.9-1 3.9.1 D e ca y T im e............................................................................................
3.9 -1 3.9.2 C om m unications.....................................................................................
3.9-2 3.9.3 R efueling P latform..................................................................................
3.9-3 3.10 MISCELLANEOUS...............................................................................
TRM/3.10-1 3.10.1 Sealed Source Contamination........................................................
TRM/3.10-1 3.10.2 Shutdown Margin Test RPS Instrumentation..........................................
3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI)...................... TRM/3.10-7 3.11 RADIOACTIVE EFFLUENTS................................................................
TRM/3. 11-1 3.11.1 Liquid E ffluents...............................................................................
T R M /3. 11-1 3.11.1.1 Liquid Effluents Concentration........................................................
TRM/3. 11-1 3.11.1.2 Liquid Effluents Dose.....................................................................
TRM/3.11-4
.3.11.1.3 Liquid Waste Treatment System....................................................
TRM/3.11-6 3.11A1.4 Liquid Radwaste Effluent Monitoring Instrumentation..................... TRM/3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation................. TRM/3.11-13 3.11.2 G aseous Effluents..........................................................................
T R M /3.11-17 3.11.2.1 D ose R ate......................................................................................
T R M /3.11-17 3.11.2.2 Dose - Noble Gases.......................................................................
TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in P articulate Form.............................................................................
T R M /3.11-2 1 3.11.2.4 Gaseous Radwaste Treatment System..........................................
TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System...........................................
TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation...............................................................................
T R M /3.11-25 3.11.3 Total Dose.....................................
TRM/3.11-33 3.11.4 Radiological Environmental Monitoring...........................................
TRM/3.11-35 3.11.4.1 M onitoring Program........................................................................
T R M /3.11-35 3.11.4.2 Land Use Census TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program..............................................
TRM/3.11-47 3.12 LOADS CONTROL PROGRAM............................................................
TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool.........................................
TRM/3.12-1 3.12.2 Heavy Loads Requirements...........................................................
TRM/3.12.3 3.12.3 Light Loads Requirements..............................................................
TRMI3.12-5 SUSQUEHANNA-UNIT2 TRM / TOC-3 EFFECTIVE DATE 04/23/2015 SUSQUEHANNA - UNIT 2 TRM / TOC-3 EFFECTIVE DATE 04/23/2015
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 24 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 4.0 ADM INISTRATIVE CO NTRO LS...................................................................
4.0-1 4.1 O rganization...........................................................................................
4.0-1 4.2 Reportable Event Action.........................................................................
4.0-2 4.3 Safety Lim it Violation..............................................................................
4.0-3 4.4 Procedures and Program s..............................................................
TRM/4.0-4 4.5 Reporting Requirem ents.........................................................................
4.0-5 4.5.1 Startup Reports......................................................................................
4.0-5 4.5.2 Annual Reports.......................................................................................
4.0-6 4.5.3 Special Reports......................................................................................
4.0-6 4.6 Radiation Protection Program.................................................................
4.0-7 4.7 Training...................................................................................................
4.0-8 SUSQUEHANNA - UNIT 2 TRM /TOC-4 EFFECTIVE DATE 04/23/2015
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 24 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.0 Technical Requirement for Operation (TRO) Applicability.............. TRM/B 3.0-1 B 3.0 Technical Requirement Surveillance (TRS) Applicability................ TRM/B 3.0-9 B 3.1.1 Anticipated Transient Without Scram Alternate Rod Injection (ATWS-ARI) Instrumentation..........................................................
TRM/B 3.1-1 B 3.1.2 Control Rod Drive (CRD) Housing Support.............................................
B 3.1-4 B 3.1.3 Control Rod Block Instrumentation.................................................
TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck V alve............................................................................
T R M /B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR)....................................................
B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation.............................................
TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation................................................
TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation.....................................
TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation.............................. TRM/B 3.3-4 B 3.3.5 Section Not Used............................................................................
TRM/B 3.3-9 B 3.3.6 TRM Isolation Actuation Instrumentation........................................
TRM/B 3.3-10 B 3.3.7 Turbine Overspeed Protection System...........................................
TRM/B 3.3-14 B 3.3.8 Section Not Used............................................................................
TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation....................................................................
TRM/B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Stops....................................
TRM/B 3.3-20 B 3.3.11 MVP Isolation Instrumentation........................................................
TRM/B 3.3-22 B 3.3.12 Water Monitoring Instrumentation...................................................
TRM/B 3.3-24 B 3.4.1 Reactor Coolant System Chemistry........................................................
B 3.4-1 B 3.4.2 N ot U sed.........................................................................................
T R M /B 3.4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitor............................... TRM/B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit.............................. TRM/B 3.4-5 B 3.4.5 Reactor Vessel Materials........................................................................
B 3.4-6 B 3.4.6 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction......................................................................
TRM/B3.4-7 B 3.5.1 A D S M anua l Inhibit.................................................................................
B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation..................... TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS...............................................
TRM/B 3.5-4 B 3.6.1 Venting or Purging..........................................................................
TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ic a tio n................................................................................................
B 3.6 -3 B 3.6.3 Suppression Pool Alarm Instrumentation........................................
TRM/B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries.......................... TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown)......................................
B 3.7-1 B 3.7.2 Ultimate Heat Sink (UHS) Ground Water Level......................................
B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System.........................................
TRM/B 3.7-3 SUSQUEHANNA - UNIT 2 TRM / TOC-5 EFFECTIVE DATE 04/23/2015
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 24 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.7.3.2 Spray and Sprinkler Systems.........................................................
TRM/B 3.7-5 B 3.7.3.3 C 0 2 S ystem s.................................................................................
TR M /B 3.7-7 B 3.7.3.4 H alon System s...............................................................................
TR M /B 3.7-8 B 3.7.3.5 Fire Hose Stations..........................................................................
TRM/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses...............................
TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assemblies....................................................................
TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation......................................................
TRM/B 3.7-14 B 3.7.4 Solid Radwaste System................................................................
TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor..........................................
B 3.7-17 B 3.7.5.2 Main Condenser Offgas Explosive Gas Mixture...................................
B 3.7-19 B 3.7.5.3 Liquid H oldup Tanks................................................
............................. B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation.....................................................
TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation.............................................................
TRM/B 3.7-22 B 3.7.8 S nubbers........................................................................................
T R M /B 3.7-24 B 3.7.9 Control Structure HVAC..................................................................
TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools...............................................................
TRM/B 3.7-33 B 3.7.11 Structural Integrity...........................................................................
T R M /B 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective D evices..........................................................................
T R M /B 3.8-1 B 3.8.2.1 Motor Operated Valves (MOV) Thermal Overload Protection -
C ontinuo us.....................................................................................
T R M /B 3.8-3 B 3.8.2.2 Motor Operated Valves (MOV) Thermal Overload Protection -
A uto m atic........................................................................................
T R M /B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintenance Activities...................
B 3.8-5 B 3.8.4 24 VDC Electrical Power Subsystem..............................................
TRM/B 3.8-6 B 3.8.5 Degraded Voltage Protection.........................................................
TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling...................
TRM/B 3.8-17 B 3.8.7 Battery Monitoring and Maintenance Program................................ TRM/B 3.8-18 B.3.9.1 D ecay T im e............................................................................................
B 3.9-1 B 3.9.2 C om m unications.....................................................................................
B 3.9-2 B 3.9.3 R efueling P latform..................................................................................
B 3.9-3 B 3.10.1 Sealed Source Contamination................................................................
B 3.10-1 B 3.10.2 Shutdown Margin Test RPS Instrumentation..........................................
B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI)...................... TRM/B 3.10-4 B 3.11.1.1 Liquid Effluents Concentration................................................................
B 3.11-1 B 3.11.1.2 Liquid Effluents Dose.............................................................................
B 3.11-4 B 3.11.1.3 Liquid Waste Treatment System............................................................
B 3.11-6 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation.............................
B 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation.............. TRM/B 3.11-10 SUSQUEHANNA -
UNIT 2 TRM / TOC-6 EFFECTIVE DATE 04/23/2015 SUSQUEHANNA - UNIT 2 TRM /TOC-6 EFFECTIVE DATE 04/23/2015
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 24 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.11.2.1 D ose R ate....................................................................................
T R M /B 3.11-12 B 3.11.2.2 D ose - Noble G ases............................................................................
B 3.11-16 B 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in P articulates Form.................................................................................
B 3.11-18 B 3.11.2.4 Gaseous Radwaste Treatment System.......................................
TRM/B 3.11-20 B 3.11.2.5 Ventilation Exhaust Treatment System........................................
TRM/B 3.11-21 B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation............................................................................
T R M /B 3.11-24 B 3.11.3 T otal D ose...........................................................................................
B 3.1 1-26 B 3.11.4.1 Monitoring Program.....................................................................
TRM/B 3.11-28 B 3.11.4.2 Land U se C ensus................................................................................
B 3.11-34 B 3.11.4.3 Interlaboratory Comparison Program...........................................
TRM/B 3.11-36 B.3.12.1 Crane Travel - Spent Fuel Storage Pool.....................................
TRM/B 3.12-1 B.3.12.2 Heavy Loads Requirements........................................................
TRM/B 3.12-2 B.3.12.3 Light Loads Requirements...........................................................
TRM/B 3.12-3 SUSQUEHANNA -
UNIT 2 TRM / TOC-7 EFFECTIVE DATE 04/23/2015 SUSQUEHANNA - UNIT 2 TRM /TOC-7 EFFECTIVE DATE 04/23/2015
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 85 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Pages TRM / 2.0-8 and TRM / 2.0-9 Page TRM / 2.0-10 Page TRM / 2.0-11 Page TRM /2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page TRM / 3.3-6 Page TRM 3.3-7 Page 3.3-8 04/23/2015 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 01/21/2014 04/15/2009 05/15/2008 01/07/2011 02/02/2010 11/15/2004 04/15/2009 11/15/2004 11/15/2005 02/19/2015 03/15/2002 02/19/2015 10/31/2007 08/31/1998 03/27/2007 04/15/2009 03/27/2007 02/18/1999 02/18/1999 08/31/1998 04/21/2015 07/16/1999 10/31/2007 03/10/2011 10/31/2007 08/31/1998 3.1 3.2 3.3 SUSQUEHANNA
- UNIT 2 TRM / LOES-1 EFFECTIVE DATE 04/23/2015 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 04/23/2015
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 85 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Pages TRM / 3.3-9 and TRM / 3.3-9a Page TRM / 3.3-10 Page TRM /3.3-11 Page TRM / 3.3-11a Page TRM /3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 Page TRM / 3.3-26 Page TRM / 3.3-27 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 Page TRM / 3.4-14 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 Effective Date 06/30/2010 10/31/2007 06/30W201 0 02/19/2015 03/30/2001 01/07/2011 12/14/1998 04/11/2014 01/07/2011 06/14/2002 10/31/2007 10/22/2003 04/15/2009 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 02/19/2015 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/3q1/2007 08/31/1998 04/17/2009 03/31/2006 04/25/2013 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 04/16/2014
.08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.5 3.6 CONTAINMENT Pages 3.6-1 and 3.6-2 Pages TRM / 3.6-3 and TRM / 3.6-3a Page 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 SUSQU~HANNA-UNIT 2 TRM / LOES-2 EFFECTIVE DATE 04/23/20 15 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 04/23/2015
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 85 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Page TRM / 3.7-4 Page TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Page TRM / 3.7-25 Page TRM / 3.7-26 Page TRM / 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-32a Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Page TRM / 3.7-37 Page TRM / 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Pages TRM / 3.7-40a through TRM / 3.7-40c Page TRM / 3.7-41 Page TRM / 3.7-42 Pages TRM / 3.7-43 Pages TRM / 3.7-44 and TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Page TRM / 3.7-55 Page TRM / 3.7-56 07/29/1999 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 01/21/2000 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 09/25/2012 11/24/2011 09/25/2012 09/25/2012 03/31/2006 02/01/1999 02/19/2015 08/31/1998 03/31/2006 05/24/2012 05/24/2012 09/04/2008 08/31/1998 02/19/2015 10/05/2006 06/07/2007 09/05/2012 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 09/25/2009 04/01/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 04/23/2015
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 85 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Page TRM / 3.8-2 Pages TRM / 3.8-3 and TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 and TRM / 3.8-22 Page TRM / 3.8-23 Page TRM / 3.8-24 Page TRM / 3.8-25 Pages TRM / 3.8-25a and TRM / 3.8-25b Page TRM / 3.8-26 Page TRM / 3.8-27 Page TRM / 3.8-28 Page TRM / 3.8-29 04/02/2002 01/28/2005 06/12/2012 04/02/2002 10/31/2007 09/03/2004 12/03/2004 06/12/2012 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 11/07/2013 11/30/2011 06/11/2012 11/30/2011 05/28/2009 11/29/2006 05/28/2009 10/20/2009 08/31/1998 03/31/2006 08/30/1998 03/27/2007 06/10/2010 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 3.11 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 and TRM / 3.11-8 Pages TRM / 3.11-9 and TRM / 3.11-10 Pages TRM / 3.11-11 and TRM / 3.11-12 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 10/09/2012 08/31/1998 SUSQUEHANNA
- UNIT 2 TRM / LOES-4 EFFECTIVE DATE 04/23/20 15 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 04/23/2015
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 85 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Page TRM / 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 and TRM / 3.11-31 Page TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Page TRM / 3.11-40 Pages TRM / 3.11-41 through TRM / 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4.
Pages TRM / 4.0-5 through TRM / 4.0-8 Effective Date 02/19/2015 12/03/2004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 06/18/2013 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 02/19/2015 03/31/2006 08/31/1998 03/31/2006 11/30/2005 02/19/2015 08/31/1998 03/31/2006 08/31/1998 03/31/2006 3.12 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 4.0 SUSQUEHANNA-UNIT 2 TRM / LOES-5 EFFECTIVE DATE 04/23/20 15 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 04/23/2015
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 85 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Pages TRM / B 3.0-4a and TRM / B 3.0-4b Page TRM / B 3.0-5 Pages TRM / B 3.0-6 and TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 through TRM / B 3.0-15 B 3.1 B 3.2 B 3.3 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Page TRM / B 3.1-2 Page TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page TRM / B 3.3-2 Page TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Page TRM / B 3.3-4 Page TRM / B 3.3-5 Page TRM / B 3.3-6 Page TRM / B 3.3-7 Page TRM / B 3.3-8 Page TRM / B 3.3-9 Page TRM / B 3.3-10 Page TRM / B 3.3-11 Pages TRM / B 3.3-12 and TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a and TRM / B 3.3-19b Page TRM / B 3.3-19c
.08/31/1998 02/19/2015 02/19/2015 02/19/2015 06/12/2012 08/31/1998 03/15/2002 02/19/2015 07/13/1999 04/16/2014 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 01/21/2014 03/10/2011 10/31/2007 10/31/2007 06/30/2010 05/30/2006 06/30/2010 10/31/2007
.6/30/2010 10/31/2007 01/07/2011 02/21/2014 01/07/2011 06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/27/2007 04/17/2009 SUSQUEHANNA
- UNIT 2 TRM / LOES-6 EFFECTIVE DATE 04/23/2015 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 04/23/2015
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 85 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.4 B 3.5 Pages TRM / B 3.3-19d and TRM / B 3.3-19e Page TRM / B 3.3-20 Page TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 Pages TRM / B 3.3-24 and TRM / B 3.3-25 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 Pages TRM / B 3.4-2 and TRM / B3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 Page TRM / B 3.4-7 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM I B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Page TRM / B 3.7-3 Page TRM / B 3.7-3a Page TRM. / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 B 3.6 03/27/2007 02/16/2012 08/03/2010 10/22/2003 05/16/2003 04/07/2009 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 04/25/2013 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 06/10/2010 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 04/11/2014 08/02/1999 B 3.7 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 04/23/2015
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 85 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / B 3.7-10a through TRM / B 3.7-11a Pages TRM / B 3.7-12 and TRM / B 3.7-13 Pages TRM / B 3.7-14 through TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Pages TRM / B 3.7-21a through TRM / B 3.7-21d Pages TRM / B 3.7-21e through TRM / B 3.7-21g Pages TRM / B 3.7-22 and TRM / B 3.7-23 Page TRM / B 3.7-24 Page TRM / B 3.7-25 Pages TRM / B 3.7-26 through TRM / B 3.7-29 Page TRM / B 3.7-30 Page TRM / B 3.7-30a Page TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 and TRM / B 3.7-37 Page TRM / B 3.7-38 Page TRM / B 3.7-39 Page TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 Page TRM / B 3.8-2a Pages TRM / B 3.8-3 and TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM I B 3.8-15 Page TRM / B 3.8-16 Page TRM / B 3.8-17 Page TRM / B 3.8-17a Page TRM / B 3.8-17b Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 and TRM / B 3.8-22 Page TRM / B 3.8-23 Page TRM / B 3.8-24 03/31/2006 08/02/1999 09/25/2012 02/01/1999 08/31/1998 05/29/2013 05/24/2012 05/29/2013 01/30/2008 10/05/2006 01/21/2014 10/05/2006 06/07/2007 10/05/2006 01/21/2014 11/30/2011 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/01/2009 09/25/2009 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 09/03/2004 04/02/2002 08/31/1998 04/02/2002 11/07/2013 11/30/2011 06/11/2012 11/30/2011 05/29/2013 05/28/2009 05/29/2013 05/28/2009 B 3.8 SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 04/23/2015
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 85 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9.
Page TRM / B 3.11-10 Pages TRM / B 3.11-11 and TRM / B 3.11-1la Pages TRM / B 3.11-12 and TRM / B 3.11-13 Page TRM/ B 3.11-14 Page TRM/ B 3.11-15 Pages B 3.11-16 through B 3.11-19 Pages TRM / B 3.11-20 and TRM / B 3.11-20a Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Pages TRM / B 3.11-23a and TRM / B 3.11-23b Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Page TRM / B 3.11-28 Page TRM / B 3.11-29 Pages TRM / B 3.11-30 and TRM / B 3.11-31 Page TRM/ B 3.11-32 Page TRM / B 3.11-33 Pages TRM / B 3.11-34 and TRM / B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Page TRM / B 3.12-2 Page TRM / B 3.12-3 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 05/13/2005 11/14/2006 06/18/2013 01/21/2004 08/31/1998 11/30/2005 02/19/2015 05/29/2013 08/31/1998 06/30/2010 08/31/1998 02/12/1999 09/19/2007 11/29/2010 02/05/1999 TRM2 text LOES.doc 4/2312015 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 04/23/2015
Core Operating Limits Report (COLR) 3.2.1 PPL Rev. 11 3.2 G
Core Operating Limits Report (COLR) 3.2.1 Core Operating Limits Report (COLR)
TRO 3.2.1 The Core Operating Limits specified in the attached COLR shall be met.
APPLICABILITY:
Specified in the referenced Technical Specifications.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Core Operating Limits not A.1 Perform action(s)
Specified in referenced met.
described in referenced Technical Technical Specification.
Specifications.
TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY NOTE N/A No associated Surveillances. Surveillances are implemented in the applicable Technical Specifications.
SUSQUEHANNA - UNIT 2 TRM / 3.2-1 EFFECTIVE DATE 08/31/1998
PPL Rev. 11 PL-NF-1 5-002 Rev. 0 Page 1 of 53 Susquehanna SES Unit 2 Cycle 18 CORE OPERATING LIMITS REPORT Nuclear Fuels Engineering April 2015
/
pVhI pu~-
~JE
- 441~
4.
SUSQUEHANNA UNIT 2 TRM/3. 2-2 EFFECTIVE DATE 4/21/2015
PPL Rev. 11 PL-NF-1 5-002 Rev. 0 Page 2 of 53 CORE OPERATING LIMITS REPORT REVISION DESCRIPTION INDEX Rev.
Affected No.
Sections Description/Purpose of Revision 0
ALL Issuance of this COLR is in support of Unit 2 Cycle 18 operation.
FORM NFP-QA-008-2, Rev. 1 SUSQUEHANNA UNIT 2 TRM/3. 2-3 EFFECTIVE DATE 4/21/2015
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 3 of 53 SUSQUEHANNA STEAM ELECTRIC STATION Unit 2 Cycle 18 CORE OPERATING LIMITS REPORT Table of Contents 1.0 INT RO D U C TIO N....................................................................................................
4 2.0 D E FIN IT IO N S......................................................................................................
.. 5 3.0 SHUTDOW N MARG IN...........................................................................................
6 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR).................. 7 5.0 MINIMUM CRITICAL POWER RATIO (MCPR).......................................................
9 6.0 LINEAR HEAT GENERATION RATE (LHGR)........................................................
24 7.0 ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY R E Q U IR E M E N T S.......................................................................................................
32 8.0 RECIRCULATION LOOPS - SINGLE LOOP OPERATION.....................................
34 9.0 POW ER I FLOW M AP..........................................................................................
49 10.0 O PRM S ETPO INTS...............................................................................................
51 11.0 R EFER EN C ES......................................................................................................
52 SUSQUEHANNA UNIT 2 TRM/3. 2-4 EFFECTIVE DATE 4/21/2015
PPL Rev. iI PL-NF-15-002 Rev. 0 Page 4 of 53
1.0 INTRODUCTION
This CORE OPERATING LIMITS REPORT for Susquehanna Unit 2 Cycle 18 is prepared in accordance with the requirements of Susquehanna Unit 2, Technical Specification 5.6.5. As required by Technical Specifications 5.6.5, core shutdown margin, the core operating limits, RBM setpoints, and OPRM setpoints presented herein were developed using NRC-approved methods and are established such that all applicable limits of the plant safety analysis are met.
SUSQUEHANNA UNIT 2 TRM/3. 2-5 EFFECTIVE DATE 4/21/2015
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 5 of 53 2.0 DEFINITIONS Terms used in this COLR but not defined in Section 1.0 of the Technical Specifications or Section 1.1 of the Technical Requirements Manual are provided below.
2.1 The AVERAGE PLANAR EXPOSUREat a specified height shall be equal to the total energy produced per unit length at the specified height divided by the total initial weight of uranium per unit length at that height.
2.2 The PELLET EXPOSURE shall be equal to the total energy produced per unit length of fuel rod at the specified height divided by the total initial weight of uranium per unit length of that rod at that height.
2.3 FDLRX is the ratio of the maximum LHGR calculated by the core monitoring system for each fuel bundle divided by the LHGR limit for the applicable fuel bundle type.
2.4 LHGRFACf is a multiplier applied to the LHGR limit when operating at less than 108 Mlbm/hr core flow. The LHGRFACf multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from core flows less than 108 Mlbm/hr.
2.5 LHGRFAC) is a multiplier applied to the LHGR limit when operating at less than RATED THERMAL POWER. The LHGRFACP multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from partial power conditions.
2.6 MFLCPR is the ratio of the applicable MCPR operating limit for the applicable fuel bundle type divided by the MCPR calculated by the core monitoring system for each fuel bundle.
2.7 MAPRAT is the ratio of the maximum APLHGR calculated by the core monitoring system for each fuel bundle divided by the APLGHR limit for the applicable fuel bundle type.
2.8 OPRM is the Oscillation Power Range Monitor. The Oscillation Power Range Monitor (OPRM) will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR safety limit is not violated.
2.9 Np is the OPRM setpoint for the number of consecutive confirmations of oscillation half-cycles that will be considered evidence of a stability related power oscillation.
2.10 Sp is the OPRM trip setpoint for the peak to average OPRM signal.
2.11 Fp is the core flow, in Mlbm / hr, below which the OPRM RPS trip is activated.
SUSQUEHANNA UNIT 2 TRM/3. 2-6 EFFECTIVE DATE 4/21/2015
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 6 of 53 3.0 SHUTDOWN MARGIN 3.1 Technical Specification Reference Technical Specification 3.1.1 3.2 Description The SHUTDOWN MARGIN shall be equal to or greater than:
a) 0.38% Ak/k with the highest worth rod analytically determined OR b) 0.28% Ak/k with the highest worth rod determined by test Since core reactivity will vary during the cycle as a function of fuel depletion and poison burnup, Beginning of Cycle (BOC) SHUTDOWN MARGIN (SDM) tests must also account for changes in core reactivity during the cycle. Therefore, the SDM measured at BOC must be equal to or greater than the applicable requirement from either 3.2.a or 3.2.b plus an adder, "R". The adder, "R", is the difference between the calculated value of maximum core reactivity (that is, minimum SDM) during the operating cycle and the calculated BOC core reactivity. If the value of "R" is zero (that is, BOC is the most reactive point in the cycle) no correction to the BOC measured value is required.
The SHUTDOWN MARGIN limits provided in 3.2a and 3.2b are applicable in MODES 1, 2, 3, 4, and 5. This includes core shuffling.
SUSQUEHANNA UNIT 2 TRM/3. 2-*7 EFFECTIVE DATE 4/21/2015
PPL Rev. 11 PL-NF-1 5-002 Rev. 0 Page 7 of 53 4.'0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) 4.1 Technical Specification Reference Technical Specification 3.2.1 4.2 Description The APLHGRs for ATRIUMTM-10 fuel shall not exceed the limit shown in Figure 4.2-1.
The APLHGR limits in Figure 4.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Two Loop operation. The APLHGR limits for Single Loop operation are provided in Section 8.0.
SUSQUEHANNA UNIT 2 TRM/3. 2-8 EFFECTIVE DATE 4/21/2015
SSES UNIT 2 CYCLE 18 V,)
16.0 14.0 12.0 E-IL S a 10.0
_j
-D
-D r,
- 00 m
C-n m
CD 6.0 4.0 0
10000 20000 30000 40000 50000 60000 Average Planar Exposure (MWD/MTU) 70000 AVERAGE PLANAR LINEAR HEAT GENERATION RATE LIMIT VERSUS AVERAGE PLANAR EXPOSURE - TWO LOOP OPERATION ATRIUMTM-10 FUEL FIGURE 4.2-1
-a (D
CD 0C 5 w o i--
z
,-n 6
00-
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 9 of 53 5.0 MINIMUM CRITICAL POWER RATIO (MCPR) 5.1 Technical Specification Reference Technical Specification 3.2.2, 3.3.4.1, 3.7.6, and 3.7.8 5.2 Description The MCPR limit is specified as a function of core power,. core flow, average scram insertion time per Section 5.3 and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM TM-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.
a)
Main Turbine Bypass / EOC-RPT / Backup Pressure Regulator Operable Figure 5.2-1: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-2: Power-Dependent MCPR value determined from BOC to EOC b)
Main Turbine Bypass Inoperable Figure 5.2-3: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-4: Power-Dependent MCPR value determined from BOC to EOC c)
EOC-RPT Inoperable Figure 5.2-5: Flow-Dependent MCPR value'determined from BOC to EOC Figure 5.2-6: Power-Dependent MCPR value determined from BOC to EOC d)
Backup Pressure Regulator Inoperable Figure 5.2-7: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-8: Power Dependent MCPR value determined from BOC to EOC The MCPR limits in Figures 5.2-1 through 5.2-8 are valid for Two Loop operation.
The MCPR limits for Single Loop operation are provided in Section 8.0.
SUSQUEHANNA UNIT 2 TRM/3. 2-10 EFFECTIVE DATE 4/21/2015
PPL Rev. 11 PL-NF-1 5-002 Rev, 0 Page 10 of 53 5.3 Average Scram Time Fraction If the average measured scram times are greater than the Realistic Scram times listed in Table 5.3-1 then the MCPR operating limits corresponding to the Maximum Allowable Average Scram Insertion Time must be implemented.
Determining MCPR operating limits based on interpolation between scram insertion times is not permitted. The evaluation of scram insertion time data, as it relates to the attached table should be performed per Reactor Engineering procedures.
SUSQUEHANNA UNIT 2 TRM/3. 2-11 EFFECTIVE DATE 4/21/2015
PPL Rev. 11 PL-NF-1 5-002 Rev. 0 Page 11 of 53 Main Turbine Bypass I EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 2 TRM/3. 2-12 EFFECTIVE DATE 4/21/2015
SSES UNIT 2 CYCLE 18 m
W1 (D
0>
CL 2.2 2.1 2.0 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 I
I I
I LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME I
I SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 I
I USED IN DETERMINING MFLCPR S30, 1.57
REFERENCE:
T.S. 3.2.2 F108, 1.21 CD m
m m
N) 30 40 50 60 70 80 90 100 Total Core Flow (MLBIHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS I EOC-RPT / BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-1 110
~0 -0 ca~
CD
-n, 01 CD,0I'.
SSES UNIT 2 CYCLE 18 U-,
U.,
0 fl-I En a,,
Cu a,
a,.0 a,.
C-,
3.6 3.4 3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.8 1.6 1.4 1.2
-D I-"
CD rm mn 20 30 40 50 60 70 80 90 Core Power (% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER MAIN TURBINE BYPASS I EOC-RPT / BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-2 100 (D -o (D0 cn C
W -> I.
PPL Rev. !1 PL-NF-15-002 Rev. 0 Page 14 of 53 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT 2 TRM/3. 2-15 EFFECTIVE DATE 4/21/2015
SSES UNIT 2 CYCLE 18 U) m
-H N)
-H c~)
N) m mm m
C-)
m ID m
N)
N)
I'm I-a) 0 m.
2.2 2.1 2.0 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 30, 1.95 SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 L
USED IN DETERMINING MFLCPR "AB
-U.
r-Cu
, 108,1.381
_E F _C
REFERENCE:
T.S. 3.7.6 and 3.2.2 30 40 50 60 70 80 Total Core Flow (MLB/HR) 90 100 110 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS INOPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-3
-D
-zP W1 0
V,)
N.)
3.6 123, 3.581 SSES UNIT 2 CYCLE 18
-H N) m
-n
-Tim C-)
-H
- 1 m
-H N)
I.
N)
I.
C."
E 0.
c.
3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.8
-,LEGEND 2-CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM r-
- INSERTION TIME CURVE B
- REALISTIC AVERAGE SCRAM INSERTION TIME CURVE C: CORE POWER *26% AND CORE FLOW <50 MLBM/HR SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS VALVES ARE
~INOPERABLE PER SR 3.7.6.1 OR 3.7A62 26.0, USD INDETRMINNG MLCI 1401.7 X0 CD
-t
¶
~-I~
R3 lao, 1.531 1.6 1.4 1.2 I
I I
I I
J. ____________
I I
REFERENCE:
T.S. 3.7.6 and 32.2[
I I
I 20 30 40 50 60 Core Power (% RATED) 70 80 90 100 MCPR OPERATING LIMIT VERSUS CORE POWER MAIN TURBINE BYPASS INOPERABLE TWO LOOP OPERATION (BOC to EOC)
FIGURE 5.2-4 CD 0CD OW C0D
PPL Rev. 11 PL-N F-15-002 Rev. 0 Page 17 of 53 EOC-RPT Inoperable SUSQUEHANNA UNIT 2 TRM/3. 2-18 EFFECTIVE DATE 4/21/2015
SSES UNIT 2 CYCLE 18 Ln.
II m
mI m
CD
.E 0) 0.
0-I C-,
2.2 2.1 2.0 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2
-i
. 1um~
ND
!E A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME
/E B: REALISTIC AVERAGE SCRAM INSERTION TIME I.
-I-I I
I I
I.
+
4-I SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 1-
- 4.
4 USED IN DETERMINING MFLCPR
REFERENCE:
T.S. 3.3.4.1 and 3.2.2 0--
30 40 50 60 70 80 Total Core Flow (MLBIHR) 90 100 110 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW EOC-RPT INOPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-5
-0 0
h 01 cAi
-o TI-C<
" o 0N,,
SSES UNIT 2 CYCLE 18 (1)
Cl m
-H
-H Cl 0
m
-n
~1~
-H
.1 m
-H m
0 I.
0 I.
0 3.6 3.4 3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.8 1.6 1.4 1.2 03 CD 100, 1.381 20 30 40 50 60 70 80 90 Core Power (% RATED) 100 MCPR OPERATING LIMIT VERSUS CORE POWER EOC-RPT INOPERABLE TWO LOOP OPERATION (BOC to EOC)
FIGURE 5.2-6 CD (0
CA W
0 N
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 20 of 53 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 2 TRM/3. 2 - 21 EFFECTIVE DATE 4/21/2015
SSES UNIT 2 CYCLE 18 CIO UD E
(0 C-,
2.2 2.1 2.0 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SIR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR
- _30, 1.57 A
B
REFERENCE:
T.S. 3.7.8 and 3.2.2 I
-u
-U CD m
C-1 m
m C:>
N) ul 10.,..
8, 1.21 L
A J.
a I
30 40 50 60 70 80 Total Core Flow (MLB/HR) 90 100 110 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-7
-U C)
Co 0
0-I z
(Di
0 SSES UNIT 2 CYCLE 18 C,)
m
-4
-H N)
CD N)
-n
-J CL 0.
3.6 3.4 3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.8 1.6 1.4 1.2
-u I-Cu 10,1.351 20 30 40 50 60 70 80 90 Core Power (% RATED) 100 MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOC to EOC)
FIGURE 5.2-8 (0
al~
Cl
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 23 of 53 Table 5.3-1 Average Scram Time Fraction Table For Use With Scram Time Dependent MCPR Operating Limits Control Rod Average Scram Time to Position (seconds)
Posltln 45 0.470 0.520 39 0.630 0.860 25 1.500 1.910 5
2.700 3.440 Average Scram Realistic Maximum Insertion Time Allowable SUSQUEHANNA UNIT 2 TRM/3.2724 EFFECTIVE DATE 4/21/2015
PPL Rev. 11 PL-NF-1 5-002 Rev. 0 Page 24 of 53 6.0 LINEAR HEAT GENERATION RATE (LHGR) 6.1 Technical Specification Reference Technical Specification 3.2.3 and 3.7.6 6.2 Description The maximum LHGR for ATRIUMTm-10 fuel shall not exceed the LHGR limit determined from Figure 6.2-1. The LHGR limit in Figure 6.2-1 is valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
To protect against both fuel centerline melting and cladding strain during anticipated system transients initiated from reduced power and flow conditions, power and flow dependent LHGR limit multipliers are provided. The following figures are applicable to EOC-RPT Operable and Inoperable and Backup Pressure Regulator Operable and Inoperable:
a)
Main Turbine Bypass Operable Figure 6.2-2: Flow-Dependent LHGR Limit Multiplier Figure 6.2-3: Power-Dependent LHGR Limit Multiplier b)
Main Turbine Bypass Inoperable Figure 6.2-4: Flow-Dependent LHGR Limit Multiplier Figure 6.2-5: Power-Dependent LHGR Limit Multiplier The LGHR limit and LHGR limit multipliers in Figure. 6.2-1 through 6.2-5 are valid for both Two Loop and Single Loop operation.
SUSQUEHANNA UNIT 2 TRM/3. 2-25 EFFECTIVE DATE 4/21/2015
SSES UNIT 2 CYCLE 18 LA) m CD 16.0 14.0 0
(D CD 0) 12.0 10.0 8.0 6.0 4.0
-U
-U r
50 0
'C
-x 30000 40000 50000 Pellet Exposure (MWDIMTU) 0 10000 20000 60000 70000 80000 LINEAR HEAT GENERATION RATE LIMIT VERSUS PELLET EXPOSURE ATRIUMTM-10 FUEL FIGURE 6.2-1
-o3 -U a,
r Co 0"CD T O)
-D 0~ 10 co CD NJ
PPL Rev. 11 Main Turbine Bypass Operable PL-NF-1 5-002 Rev. 0 Page 26 of 53 SUSQUEHANNA UNIT 2 TRM/3. 2 - 27 EFFECTIVE DATE 4/21/2015
SSES UNIT 2 CYCLE 18 (n
Lm rn
- -H z*
CA N)
N)
-H mq ci
-Ho mo 0
1.10 1.00 0.90 I-0 z
C, S
-J 0
CC) 0~
0 C
0 Li-0.80 0.70 0.60 CD r-0.50 0.40 0.30 30 40 50 60 70 80 90 100 Total Core Flow (MLB/hr) 110 FLOW DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS OPERABLE ATRIUMTM-10 FUEL FIGURE 6.2-2
-D 0 C o*,
h <
C :
01" 0
CA 0C)x
SSES UNIT 2 CYCLE 18 m
N)
F-NO Cn 1.10 I-C, CD
=
-J CS Caa.
SC 1~
C, 0
0.
-o
-0 CD 20 30 40 50 60 70 80 90 100 Core Power (% RATED)
POWER DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS OPERABLE ATRIUMTM-10 FUEL FIGURE 6.2-3 CD 0-m m
C)~
W0C0K
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 29 of 53 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT 2 TRM/3. 2 -30 EFFECTIVE DATE 4/21/2015
SSES UNIT 2 CYCLE 18 c-fla c-fl Cam a
-H
-H
':2 S
CO N3 CA)
I' ni m
-n m
0-H
-C nfl C
-H rn C
ro C
1.10 1.00 0.90 1~a)
CD r
-J CC)
~0 CC) a.
C)
C 0
U-0.80 0.70 0.60
-u CD 0.50 0.40 0.30 10 30 40 50 60 70 a
Total Core Flow (MLB/HR) 90 100 110 FLOW DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS INOPERABLE ATRIUMTM-10 FUEL FIGURE 6.2-4
-0) w C) cu.
C)
0 SSES UNIT 2 CYCLE 18 Vt)
V) 1.10 C) 0
-J C)
C) 0 C) 0 "CD "u
r'-
mr
-n
-n mr N) 20 30 40 50 60 70 80 90 Core Power (% RATED) 100 POWER DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS INOPERABLE ATRIUMTM-10 FUEL FIGURE 6.2-5 CD CD 6
CA.
0 Wo"r~
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 32 of 53 7.0 ROD BLOCK MONITOR (RBMI) SETPOINTS AND OPERABILITY REQUIREMENTS 7.1 Technical Specification Reference Technical Specification 3.3.2.1 7.2 Description The RBM Allowable Value and Trip Setpoints for; a)
Low Power Range Setpoint, b)
Intermediate Power Range Setpoint, c)
High Power Range Setpoint, d)
Low Power Range - Upscale, e)
Intermediate Power Range - Upscale, and f)
High Power Range - Upscale shall be established as specified in Table 7.2-1. The RBM setpoints are valid for Two Loop and Single Loop Operation, Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
The RBM system design objective is to block erroneous control rod withdrawal initiated by the operator before fuel design limits are violated. If the full withdrawal of any control rod would not violate a fuel design limit, then the RBM system is not required to be operable. Table 7.2-2 provides RBM system operability requirements to ensure that fuel design limits are not violated.
SUSQUEHANNA UNIT 2 TRM/3. 2-33 EFFECTIVE DATE 4/21/2015
PPL Rev. 11 PL-N F-15-002 Rev. 0 Page 33 of 53 Table 7,2-1 RBM Setpoints Allowable Nominal Trip Function Valuet 1)
Setpoint Low Power Range Setpoint 28.0 24.9 Intermediate Power Range Setpoint 63.0 61.0 High Power Range Setpoint 83.0 81.0 Low Power Range - Upscale 123.4 123.0 Intermediate Power Range - Upscale 117.4 117.0 High Power Range - Upscale 107.6 107.2
(
Power setpoint function (Low, Intermediate, and High Power Range Setpoints) determined in percent of rated thermal power. Upscale trip setpoint function (Low, Intermediate, and High Power Range - Upscale) determined in percent of reference level.
Table 7.2-2 RBM System Operability Requirements Thermal Power MCPR (2,3)
(% of Rated)
>_28 and < 90
< 1.76
!90 and < 95
< 1.47
> 95
< 1.68 (2)
Applicable to Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
(3) Applicable to both Two Loop and Single Loop Operation.
SUSOUEHANNA UNIT 2 TRM/3.2-34 EFFECTIVE DATE 4/21/2015
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 34 of 53 8.0 RECIRCULATION LOOPS - SINGLE LOOP OPERATION 8.1 Technical Specification Reference Technical Specification 3.2.1, 3.2.2, 3.2.3, 3.3.4.1, 3.4.1, 3.7.6, and 3.7.8 8.2 Description APLHGR The APLHGR limit for ATRIUMTM-1 0 fuel shall be equal to the APLHGR Limit from Figure 8.2-1.
The APLHGR limits in Figure 8.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Single Loop operation.
Minimum Critical Power Ratio Llmlt The MCPR limit is specified as a function of core power, core flow, and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM TM-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.
a)
Main Turbine Bypass / EOC-RPT I Backup Pressure Regulator Operable Figure 8.2-2: Flow-Dependent MCPR value determined from BOG to EOC Figure 8.2-3: Power-Dependent MCPR value determined from BOG to EOC b)
Main Turbine Bypass Inoperable Figure 8.2-4: Flow-Dependent MCPR value determined from BOG to EOC Figure 8.2-5: Power-Dependent MCPR value determined from BOG to EOC c)
EOC-RPT Inoperable Figure 8.2-6: Flow-Dependent MCPR value determined from BOG to EOC Figure 8.2-7: Power-Dependent MCPR value determined from BOG to EOC d)
Backup Pressure Regulator Inoperable Figure 8.2-8: Flow-Dependent MCPR value determined from BOG to EOC Figure 8.2-9: Power-Dependent MCPR value determined from BOG to EOC SUSQUEHANNA UNIT 2 TRM/3. 2-35 EFFECTIVE DATE 412112015
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 35 of 53 The MCPR limits in Figures 8.2-2 through 8.2-9 are valid only for Single Loop operation.
Linear Heat Generation Rate Limit The LHGR limits for Single Loop Operation are defined in Section 6.0.
RBM Setpoints and Operability Requirements The RBM setpoints and operability requirements for Single Loop Operation are defined in Section 7.0.
SUSQUEHANNA UNIT 2 TRM/3. 2 -36 EFFECTIVE DATE 4/21/2015
SSES UNIT 2 CYCLE 18 16.0 14.0 a
12.0 0- c 10.0 (U;-
a0 8.0 0D C*
-D r-"
.r m
C-n C->
(51 6.0 4.0 0.0 10000.0 20000.0 30000-0 40000.0 50000.0 Average Planar Exposure (MWDIMTU) 60000.0 70000.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE LIMIT VERSUS AVERAGE PLANAR EXPOSURE - SINGLE LOOP OPERATION ATRIUMTM-10 FUEL FIGURE 8.2-1
-o
-n CoI 0x CAOIC>
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 37 of 53 Main Turbine Bypass / EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 2 TRM/3.2-38 EFFECTIVE DATE 4/21/2015
SSES UNIT 2 CYCLE 18 m
m m
m CDf M
0.0x (L
3.6 3.4 3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.8 1.6 1.4 i
I LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME I-t-I SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR R
C 3
nB
REFERENCE:
T.S. 3.4.1 and 3.2.21--
CD 30 40 50 60 70 80 Total Core Flow (MLB/HR) 90 100 110 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS I EOC-RPT / BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-2 CD o CO~-
W.I 0
SSES UNIT 2 CYCLE 18 N.)
4.6 4.4 4.2 4.0 3.8 3.6 3.4 3.2 3.0 2.8 2.6 2.4 a:t 0
m.
LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM
= __23,_4.08 INSERTION TIME
_CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 26,8 CURVE C: CORE POWER *26% AND CORE FLOW <50 MLBMIHR SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6-2
- l USED IN DETERMINING MFLCPR CD 2.2
- 140,
- no I G.UOL.........4.
4
- 4.
1
+
L~J m
-n
-n m
Cm A,-1B3,,,,,i--
I-
-4 I, i.921 I U 2.0 1.8 1.6 1.4
REFERENCE:
T.S 3.4.1__
and___
3=.22____________
20 30 40 50 60 70 Core Power (% RATED) 90 100 MCPR OPERATING LIMIT VERSUS CORE POWER MAIN TURBINE BYPASS I EOC-RPT / BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE.8.2-3
-u CD Wy 0 N
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 40 of 53 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT 2 TRM/3. 2-41 EFFECTIVE DATE 4/21/2015
V) mn Ir 4.2 4.0 3.8 3.6 3.4
,,' 3.2 E
o* 3.0 2.8 0
2.6 2.4 SSES UNIT 2 CYCLE 18 LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM
-INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 USED IN DETERMINING MFLCPR
REFERENCE:
TS. 3.4.1, 3.7.6, and 3.2.2 "0
I--
Ci,
-n m
2.2 2.0 1.8 1.6 1.4 30 40 50 60 70 80 Total Core Flow (MLBIHR) 90 100 110 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-4
-,a CD 0
01 I-"
CD' g
C)
C" NO
SSES UNIT 2 CYCLE 18 V,)
(-)
4-n m
nfl m
N\\)
c:)
E
-j c) 0~
CD
(<0 20 30 40 50 60
) 70 80 90 Core Power (% RATED) 100.
MCPR OPERATING LIMIT VERSUS CORE POWER MAIN TURBINE BYPASS INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-5 cc (D
41,
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 43 of 53 EOC-RPT Inoperable SUSQUEHANNA UNIT 2 TRM/3. 2-44 EFFECTIVE DATE 4/21/2015
SSES UNIT 2 CYCLE 18 cZ CA m
m m
E
-i 0
4.0 3.8 3.6 3.4 3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.8 1.6 1.4 I
I I
LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 1 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 SI-II USED IN DETERMINING MFLCPR 30,1.9
REFERENCE:
T.S. 3.4.1, 3.3.4.1, and 3.2.2 108, 1.48 "E)
-5 I-30 40 50 60 70 80 Total Core Flow (MLBJHR) 90 100 110 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW
. EOC-RPT INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-6 CD
-u 0
(
C:)
SSES UNIT 2 CYCLE 18 m
II
-,n
-Hm m
-n CD)
-H E
0) 0.0 0~
C.,
4.6 4.4 4.2 4.0 3.8 3.6 3.4 3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.8 1.6 1.4
'u CD 20 30 40 50 60 70 80 90 Core Power (% RATED) 100 MCPR OPERATING LIMIT VERSUS CORE POWER EOC-RPT INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-7
~0 C)
WCD N
PPL Rev. 11 PL-NF-15-002 Rev, 0 Page 46 of 53 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 2 TRM/3. 2-47 EFFECTIVE DATE 4/21/2015
SSES UNIT 2 CYCLE 18 (r)
Cr) m
-H 4.0 3.8 3.6 3.4 3.2 3.0 2.8 2.6 2.4 1
Ii i
t 4
SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 m
C-r m
m C:)
4,-
E 0
2.0 1.8 1.6 1.4 3
1 a1____.____
B USED IN DETERMINING MFLCPR I
-C r-30 40 50 60 70 80 90 100 110 Total Core Flow (MLBIHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-8 CD 0 C CA OW C)
N1 00O
SSES UNIT 2 CYCLE 18 V) mn m
41--
0, W.
4.6 4,4 4.2 4.0 3.8 3.6 3.4 3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.8 1.6
'1.4 Co 2060 70 80 90 Core Power (% RATED) 100 MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-9 CD -o (D 9 0Q CA-i C3
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 49 of 53 9.0 POWER / FLOW MAP 9.1 Technical Specification Reference Technical Specification 3.3.1.1 9.2 Description Monitor reactor conditions to maintain THERMAL POWER / core flow outside of Stability Regions I and II of the Power/ Flow map, Figure 9.1.
If the OPRM Instrumentation is OPERABLE per TS 3.3.1.1, Region I of the Power I Flow map is considered an immediate exit region.
If the OPRM Instrumentation is inoperable per TS 3.3.1.1, Region I of the Power
/ Flow map is considered an immediate scram region.
Region II of the Power / Flow map is considered an immediate exit region regardless of the operability of the OPRM Instrumentation.
SUSQUEHANNA UNIT 2 TRM/3. 2-50 EFFECTIVE DATE 4/21/2015
PPL Rev. 11 I
a
~70
~50 40 U
TRM/3.
SUSQUEHANNA UNIT
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 51 of 53 10.0 OPRM SETPOINTS 10.1 Technical Specification Reference Technical Specification 3.3.1.1 10.2 Description Setpoints for the OPRM Instrumentation are established that will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR Safety limit is not violated. The setpoints are described in Section 2.0 and are listed below:
SP 1.12 Np
=
16 FP 60 Mlbm / hr SUSQUEHANNA UNIT 2 TRM/3. 2 - 52 EFFECTIVE DATE 4/21/2015
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 52 of 53
11.0 REFERENCES
11.1 The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1. XN-NF-81-58(P)(A), Revision 2 and Supplements I and 2, "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," Exxon Nuclear Company, March 1984.
- 2. EMF-2361(P)(A), Revision 0, "EXEM BWR-2000 ECCS Evaluation Model,"
Framatome ANP, May 2001.
- 3. EMF-2292(P)(A), Revision 0, "ATRIUMTM-10: Appendix K Spray Heat Transfer Coefficients," Siemens Power Corporation, September 2000.
- 4. XN-NF-84-105(P)(A), Volume 1 and Volume 1 Supplements 1 and 2, "XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis," Exxon Nuclear Company, February 1987.
- 5. XN-NF-80-19(P)(A), Volume 1 and Supplements 1 and 2, "Exxon Nuclear Methodology for Boiling Water Reactors: Neutronic Methods for Design and Analysis," Exxon Nuclear Company, March 1983.
- 6. XN-NF-80-19(P)(A), Volumes 2, 2A, 2B, and 2C "Exxon Nuclear Methodology for Boiling Water Reactors: EXEM BWR ECCS Evaluation Model," Exxon Nuclear Company, September 1982.
- 7. XN-NF-80-19(P)(A), Volume 3 Revision 2 "Exxon Nuclear Methodology for Boiling Water Reactors Thermex: Thermal Limits Methodology Summary Description," Exxon Nuclear Company, January 1987.
- 8. XN-NF-80-19(P)(A), Volume 4, Revision 1, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company, June 1986.
- 9. XN-NF-85-67(P)(A), Revision 1, "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," Exxon Nuclear Company, Inc.,
September 1986.
- 10. ANF-524(P)(A), Revision 2 and Supplements 1 and 2, "Advanced Nuclear Fuels Corporation Critical Power Methodology for Boiling Water Reactors,"
November 1990.
- 11. NE-092-001A, Revision 1, "Licensing Topical Report for Power Uprate With Increased Core Flow," Pennsylvania Power & Light Company, December 1992 and NRC SER (November 30,1993).
SUSQUEHANNA UNIT 2 TRM/3. 2-53 EFFECTIVE DATE 4/21/2015
PPL Rev. 11 PL-NF-15-002 Rev. 0 Page 53 of 53
- 12. ANF-89-98(P)(A) Revision I and Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs," Advanced Nuclear Fuels Corporation, May 1995.
- 13. EMF-2209(P)(A), Revision 3, "SPCB Critical Power Correlation," AREVA NP, September 2009.
- 14. EMF-85-74(P)(A), Revision 0, Supplement 1(P)(A) and Supplement 2(P)(A),
"RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model,"
Siemens Power Corporation, February 1998.
- 15. EMF-2158(R)(A), Revision 0, "Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/Microburn-B2," Siemens Power Corporation, October 1999.
- 16. EMF-CC-074(P)(A), Volume 4, Revision 0, "BWR Stability Analysis -
Assessment of STAIF with Input from MICROBURN-B2," Siemens Power Corporation, August 2000.
- 17. NEDO-32465-A, "BWROG Reactor Core Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.
- 18. ANF-913(P)(A), Volume 1 Revision 1 and Volume 1 Supplements 2, 3, and 4, "COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses," Advanced Nuclear Fuels Corporation, August 1990.
- 19. ANF-1358(P)(A), Revision 3, "The Loss of Feedwater Heating Transient in Boiling Water Reactors," Framatome ANP, September 2005.
SUSQUEHANNA UNIT 2 TRM/3. 2 - 54 EFFECTIVE DATE 4/21/2015