ML15125A168

From kanterella
Jump to navigation Jump to search

Power Ascension - 108% Hold Point Decision
ML15125A168
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/25/2015
From: Richard Ennis
Plant Licensing Branch 1
To: Ainger K
Exelon Generation Co
Ennis R, NRR/DORL/LPLI-2, 415-1420
References
TAC MF4792
Download: ML15125A168 (1)


Text

From: Ennis, Rick Sent: Saturday, April 25, 2015 1:12 PM To: Ken Ainger Cc: Kevin Borton (kevin.borton@exeloncorp.com); David Neff; Rommel, John C.:(GenCo-Nuc); Broaddus, Doug; Wilson, George; Lund, Louise; Uhle, Jennifer; Basavaraju, Chakrapani; Pettis, Robert; Ross-Lee, MaryJane; Lubinski, John; Thorp, John; Bower, Fred; Barber, Scott; Turilin, Andrey; Hansell, Samuel; Smith, Brian; Lin, Brian; Vik Shah; Vik Shah (home)

(vnshah@sbcglobal.net); Stephen Hambric; Samir Ziada

Subject:

Peach Bottom Unit 2 Power Ascension - 108% Hold Point Decision

Ken, Sorry I missed your calls earlier today. In response to your voicemail, yes, the email I sent this morning with RAI-11 provided the status update (by 3:00 pm today) promised in my 4/24 email below.

Also, with respect to the 96 hour0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> review period for the 108% hold point, and decision regarding further power ascension (mentioned in the email below), the staff has decided that it has objections to further power ascension. We believe that further power ascension is not warranted at this time based on the issues discussed in RAI-11. As noted in the RAI:

The NRC staff has reviewed the information the licensee provided and has determined that additional information, as described below, needs to be provided to help inform the staffs decision on the acceptability of the proposed change in methodology as well as power ascension beyond 108% of 3514 MWt.

We dont have all the needed staff for a call today. It looks like we could support a call on Sunday 4/26 at either of the following time periods:

12:30 - 1:15 pm 4:15 - 5:00 pm Please let me know if you have any questions.

Thanks, Rick From: Ennis, Rick Sent: Friday, April 24, 2015 6:14 PM To: Ken Ainger Cc: Broaddus, Doug; Kevin Borton (kevin.borton@exeloncorp.com); Rommel, John C.:(GenCo-Nuc);

David Neff

Subject:

Peach Bottom Unit 2 Power Ascension - Feedback Regarding 108% Call Today

Heres some feedback from the NRC staff and contractor internal discussions following our call today with Exelon and Westinghouse concerning the Peach Bottom Unit 2 power ascension 108% information:

1) The NRC and its contractors are still having internal discussions regarding the information Exelon provided for the 108% hold point at Peach Bottom Unit 2.
2) There are still concerns regarding the methodology. The concerns relate whether the proper modes were selected in the analysis. The raises uncertainty regarding whether the stresses currently calculated are correct. The staff and contractors are working over the weekend to specifically document these concerns. It is likely that additional information will be needed to address the methodology concerns.
3) We have not yet made a decision regarding power ascension from 108% to 112.4%.

Further internal discussions are needed to determine if there is reasonable assurance of structural integrity of the steam dryer at the full EPU power level given the concerns with the methodology. The staff plans to make a decision prior to the end of the 96 hour0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> license condition review period (i.e., by 7:40 pm on Sunday 4/26).

4) Rick Ennis will contact Ken Ainger by 3:00 pm on Saturday, 4/25 with a status update.
5) Doug Broaddus will call Scot Greenlee tonight to pass on the above info.

Please let me know if you have any questions.

Thanks, Rick