Forwards Insp Repts 50-269/96-13,50-270/96-13,50-287/96-13 & 72-0004/96-13 on 960825-1005 & Nov.Violation of Concern Because Site Procedures Did Not Incorporate Some QA Topical Rept Requirements
ML15118A144
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/04/1996
From: Wert L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hampton J
DUKE POWER CO.
Shared Package
ML15118A145 List:
References
NUDOCS 9611150210
Download: ML15118A144 (3)


See also: IR 05000269/1996013

Text

November 4, 1996

Duke Power Company

ATTN: Mr. J. W. Hampton, Vice President

Oconee Nuclear Station

P. 0. Box 1439

Seneca, SC 29679

SUBJECT:

NRC INSPECTION REPORT 50-269/96-13, 50-270/96-13,

50-287/96-13 AND NOTICE OF VIOLATION

Dear.Mr. Hampton:

On October 5, 1996, the NRC completed an inspection at your Oconee 1, 2, and 3

reactor facilities. The enclosed report presents the results of that

inspection.

During the 6-week period covered by this inspection, your conduct of

activities at the Oconee facilities was generally characterized by safety

conscious Operations, Maintenance, and Engineering practices. However, three

violations of NRC requirements were identified. The first violation is of

.

concern because site procedures did not incorporate some Quality Assurance

Topical Report requirements. The second violation is also of concern because

it involved a failure to perform an adequate 10 CFR 50.59 evaluation for a

modification associated with piping connected to the reactor coolant system.

The third violation involved plant service water issues that had been

previously-discussed with the-NRC and corrective actions were in progress.

These violations are cited in the enclosed Notice of Violation (Notice), and

the circumstances surrounding the violations are described in detail in the

enclosed report. Please note that you are required to respond to this letter

and should follow the instructiqns specified in the enclosed Notice when

preparing your response. Regarding Violation C, the NRC has concluded that

information regarding the reason for this violation, the corrective actions

taken and planned to correct the /violation and prevent recurrence is already

adequately addressed on the docket in Inspection Report 50-269,270,287/94-39

and correspondence dated December 28, 1995, and July 2, 1996. Therefore, you

are not required to respond to Violation C. unless the description therein

does not accurately reflect your corrective actions or your position. In that

case, or if you choose to provide additional information in relation to

Violation C, you should followsthe instructions specified in the enclosed

Notice. The NRC will use your response to Violations A and B, in part, to

determine whether further enforcement action is necessary to ensure compliance

with regulatory requirements.

9611150210 961104

PDR ADOCK 05000269

W G

PDR

DPC

2

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room

(PDR).

Sincerely,

Original signed by:

L. D. Wert, Acting Chief

Reactor Projects Branch 1

Division of Reactor Projects

Docket Nos. 50-269, 50-270, 50-287, 72-04

License Nos. DPR-38, DPR-47, DPR-55, SNM-2503

Enclosures: 1. Notice of Violation

2. Inspection Report 50-269/96-13,

50-270/96-13, 50-287/96-13

cc w/encls:

Mr. J. E. Burchfield

Compliance

Duke Power Company

.P.

0.

Box 1439

Seneca, SC 29679

Mr. Paul R. Newton

Legal Department (PB05E)

Duke Power Company

422 South Church Street

Charlotte, NC 28242-0001

Mr. Robert P. Gruber

Executive Director

Public Staff - NCUC

P. 0. Box 29520

Raleigh, NC 27626-0520

Mr. Robert B. Borsum

Framatome Technologies

1700 Rockville Pike, Suite 525

Rockville, MD 20852

Mr. J. Michael McGarry, III, Esq.

Winston and Strawn

1400 L Street, NW

Washington, D. C. 20005

.

cc w/encls cont'd: (See page 3)

DPC

3

cc w/encls cont'd:

Dayne H. Brown, Director

PUBLIC

Division of Radiation Protection

N. C. Department of Environmental

NRC Resident Inspector

Health & Natural Resources

U.S. Nuclear Regulatory Commission

P. 0. Box 27687

78128 Rochester Highway

Raleigh, NC 27611-7687

Seneca, SC 29672

Mr. Max Batavia, Chief

Bureau of Radiological Health

South Carolina Department of Health

and Environmental Control

2600 Bull Street

Columbia, SC 29201

County Supervisor of

Oconee County

Walhalla, SC 29621

Manager, LIS

NUS Corporation

2650 McCormick Drive

Clearwater, FL 34619-1035

Mr. G.

A.

Copp

Licensing - ECO50

Duke Power Company

P. 0. Box 1006

Charlotte, NC 28201-1006

Ms. Karen E. Long

Assistant Attorney General

N. C. Department of Justice

P. 0. Box 629

Raleigh, NC

27602

Distribution w/encls:

D. LaBarge, NRR

R. Carroll, RII

R. V. Crlenjak, RII

N. Economos, RII

R. Baldwin, RII

G. Hallstrom, RU.S.

Nuclear RgloyCm

OFFICE

RI DRP:OCONEE

RII:DRP:OCONEE

RII:DRP:0CONEE

RII:DRS

RII:DRS

SIGNATURE

J

NAME

MScott

GHUMPHREY

NSALGADO

GWALTON

PKELLOGG

DATE

11

96

11

96

11 /f /96

11/

/96

11 /f

/96

11/

/96

COPY? A

O

YES

NO

YES

YES

YES

NO