ML15112B033
| ML15112B033 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/11/1981 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML15112B032 | List: |
| References | |
| PDR-47-A-100, NUDOCS 8110020146 | |
| Download: ML15112B033 (11) | |
Text
UNITED STATES
-NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555 DUKE POWER COMPANY DOCKET MO.
50- 269 OCONEE NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.100 License No. DPR-38
- 1. The Nuclear Regulatory Commission (the Comission) has found that:
A. The application for amendment by Duke Power Company (the licensee) dated August 19, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and'regulations set forth in 10 CFR Chapter I;
,B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission;
.C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissionis regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's reaulations and all applicable requirements have been satis fied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility Operating License No. DPR-38 is hereby amended to read as follows:
3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.100 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
8110020146 91091f PDR ADOCK 05000269 P1 PDR)
-2
- 3. This license amendment is effective asof the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION oh F. Stolz, Chie perating Reactors Branch 4 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: September 11, 1981
REGl UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMIPANY DOCKET
- 10.
50-270 OCONEE NUCLEAR STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.100 License No. DPR-47
- 1. The Nuclear Regulatory Commission (the Cornission) has found that:
A. The application for amendment by Duke Power Company (the licensee) dated August 19, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility Operating License No.
DPR-47 is hereby amended to read as follows:
3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.100 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
-2
- 3. This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION on F. Stolz, Chi 0 erating Reactors Branch V4 Division of Licensing
Attachment:
- Changes to the Technical Specifications Date of Issuance:
September 11, 1981
o UNITED STATES
- NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 DUKE POWER COIMPANY DOCKET NO.
50-287 OCONEE NUCLEAR STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 97 License No. DPR-55
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Duke Power Company (the licensee) dated August 19, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of thi-s amendment is in accordance with 10 CFR Part 51 of the Commission's reaulations and all applicable requirements have been satis fied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility Operating License No. DPR-55 is hereby amended to read as follows:
3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 97 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Jo F. Stolz, Chief rating Reactors ranch #4 vision of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: September 11, 1981
ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT NO.100 TO DPR-38 AMENDMENT NO.100 TO DPR-47 AMENDMENT NO.
97 TO DPR-55 DOCKETS NOS.
50-269, 50-270 AND 50-287 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by amendment numbers and contain vertical lines indicating the area of change.
Rem6ve Pages Insert Pages 3.5-16a 3.5-16a 3.5-19a 3.5-19a 3.5-22 3.5-22 3.5-25a 3.5-25a
- e 110 (280.102)
POWER LEVEL (234. 102) 100 100 CUTOFF OPERATION NOT (275.92) 9.0 ALLOWED 80 RESTRICTED 250 30 70 C-,'
600 u
50 (173,50)
(200,50)
SHUTDOWN 40 40a MARGIN LIMIT OPERATION PERMISSIBLE 30 20 10
< 0)
A 0 00100 150 200 250 300 Roo Inoex.
7nor w n0 0
25 50 75 100 0
25 50 75 100 Group 5 Group 7 0
25 50 75 100 Group 6 ROD POSITION LIMITS FOR FOUR PUMP OPERATION FROM 150 + 10 TO 390 + 10 EFPD 30 t
UNIT 2 OCONEE NUCLEAR STATION Figure 3.5.2-1B2 3.5-16a
\\10 (260 102)
(234.102) 100 OPERATION o
90 NOT ALLOWED 80 70 200.64) 60 50 SHUTDOWN MARGIN 173. 50)
LIMIT 40 PERMISSIBLE OPERATING 30 REGION o
20 20 0
50 100 150 200 250 300 Roa Intex.
i tnerawn 0
25 50 75 100 0
25 50 75 100 Group 5 Group 7 0
25 50 75 100 Group 5 ROD POSITION LIMITS FOR Two AND THREE PUM4P OPERATION FROM 150 t 10 TO 390 + 10 EFPD UNIT 2
-30 jo we QCONEE NUCLEAR STATION Figure 3.5.2-2B2
RESTRICTED REGION POWER.
5 OF.2568 MWt
- 110
(-19.102) k+19 102) 100
(-22.92) 90 i+27.92)
(+30.80)
-31 80) 80 8
70 PERMISSIBLE 60 OPERATING 50 REGION 40 30 20 10
-40
-30
-20
-10 0
10 20 30 40 50 Core Imbalance (5)
OPERATIONAL POWER IM=.ALANCE ENVEOCP FOR OPERATION FROM 0 TO 390 + 10 :.-D UNIT 2
- 30 MaEE OCONEE NUCLEAR STATION Figure 3.5.2-3B1 3.5-22
110
- 6.
102)
- 27. 102) 100 (6 92) 30 92) 20 RESTRICTED REGION 80-0 80)
'30.80) 70 60 00
- 50. 50) 50 00 40) 40 30 20 PERMISSIBLE OPERATiNG 10 REGION 0
I 0
10 20 30 40 50 60 70 80 90 100 APSR Pos:tion (
Witnarawn)
APSR POSITION LIMITS FOR OPERATION FROM 150 - 10 EFPD TO 390 + 10 EFPD 0 yUnit 2
'30 OCONEE NUCLEAR STATION Figure 3.5.2-4B2 3.5-25a