ML15112A901

From kanterella
Jump to navigation Jump to search
Amends 79,79 & 76 to Licenses DPR-38,DPR-47 & DPR-55, Respectively,Revising Tech Specs by Delaying Irradiation of Matl Surveillance Capsule in Host Reactor from Third Cycle to Sixth Cycle of Operation
ML15112A901
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/07/1980
From: Reid R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML15112A902 List:
References
NUDOCS 8002200291
Download: ML15112A901 (8)


Text

UNITED STATES S

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 0

DUKE POWER COMPANY DOCKET NO. 50-269 OCONEE NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 7 9 License No. DPR-38

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Duke Power Company (the licensee) dated December 21, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.

2. Accordingly, the license is anended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility Operating License No. DPR-38 is hereby amended to read as follows:

3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 79 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

8002200

-2

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors

Attachment:

Changes to the Technical Specifications Date of Issuance: FEBRUARY 0 7 1980

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO. 50-270 OCONEE NUCLEAR STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 79 License No. DPR-47

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Duke Power Company (the licensee) dated December 21, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.

Accorlingly, the license is anended by changes to the Technical Specifications as indicated in the attachment to this.license amendment and paragraDh 3.B of Facility Operating License No.

0PR-47 is hereby amended to read as follows:

3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 79 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

-2

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors

Attachment:

Changes to the Technical Specifications Date of Issuance: FFBRUARY 0 7 19M

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO. 50-287 OCONEE NUCLEAR STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 76 License No. DPR-55

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Duke Power Company (the licensee) dated December 21, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied.

2. Accordingly, the license is anended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragranh 3.B of Facility Operating License No. DPR-55 is hereby amended to read as follows:

3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 76 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

-2

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Ro ert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors

Attachment:

Changes to the Technical Specifications Date of Issuance:

FEBRUARY 0 7 1980

ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT NO. 79 TO DPR-38 AMENDMENT NO. 79 TO DPR-47 AMENDMENT NO.

76 TO DPR-55 DOCKETS NOS. 50-269, 50-270 AND 50-287 Revise Appendix A as follows:

Remove Page Insert Page 4.2-4 4.2-4 Changes on the revised page are indicated by a marginal line.

Table 4.2-1 OCONEE NUCLEAR STATION CAPSULE ASSEMBLY WITHDRAWAL SCHEDULE AT CRYSTAL RIVER UNIT NO. 3 Capsule Designation Insertion Withdrawal OCI-A End of 1st Cycle End of 7th Cycle OCI-B End of 7th Cycle End of 16th Cycle OCI-C End of 2nd Cycle End of 11th Cycle OCI-D End of 9th Cycle End of 18th Cycle OCII-A End of 1st Cycle End of 2nd Cycle OCII-B End of 4th Cycle End of 9th Cycle OCII-D End of 9th Cycle End of 18th Cycle OCII-E End of 1st Cycle End of 9th Cycle OCII-F End of 9th Cycle End of 18th Cycle OCIII-B End of 1st Cycle End of 2nd Cycle OCIII-C End of 5th Cycle End of 10th Cycle OCIII-D End of 1st Cycle End of 9th Cycle OCIII-E End of 5th Cycle End of 18th Cycle OCIII-F End of 11th Cycle End of 20th Cycle NOTE:

OCI Capsules are from Unit No. 1 OCII -

Capsules are from Unit No. 2 OCIII -

Capsules are from Unit No. 3 Amendments Nos. 79, 79, and 76 4.2-4