Notice of Issuance & Availability of Amends 79,79,& 76 to Licenses DPR-38,DPR-47 & DPR-55,respectively
ML15112A906
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/07/1980
From: Reid R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML15112A902 List:
References
NUDOCS 8002200303
Download: ML15112A906 (2)


Text

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKETS NOS. 50-269, 50-270 AND 50-287 DUKE POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendments Nos. 79, 79, and 76 to Facility Operating Licenses Nos. DPR-38, DPR-47 and DPR-55, respectively, issued to Duke Power Company, which revised the Technical Specifications for operation.of the Oconee Nuclear Station, Units Nos.

1, 2 and 3, located in Oconee County, South Carolina. The amendments are effective as of the date of issuance.

These amendments revise the Technical Specifications by delaying the irradiation of an Oconee Unit No. 3 material surveillance capsule in the host Crystal River Unit No. 3 reactor from Crystal River Unit 3's third cycle to its sixth cycle of operation.

This rescheduling is necessary to accommodate irradiation requirements for another reactor due to unavailability of its original host, Three Mile Island Unit No. 2.

The application for the amendments complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission had made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments. Prior public notice of these amendments was not required since the amendments do not involve a significant hazards consideration.

The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR §51.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of these amendments.

800220030 7590-01 For further details with respect to this action, see (1) the application for amendments dated December 21, 1979, (2) Amendments Nos. 79, 79, and 76 to Licenses Nos. DPR-38, DPR-47 and DPR-55, respectively, and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N.W., Washington, D. C. and at the Oconee County Library, 201 South Spring Street, Walhalla, South Carolina. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention: Director, Division of Operating Reactors.

Dated at Bethesda, Maryland, this 7th day of:FEBRUARY 1980 FOR THE NUCLEAR REGULATORY COMMISSION Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors