IR 05000277/2014001

From kanterella
(Redirected from ML15062A180)
Jump to navigation Jump to search
ROP 15 Annual Assessment Letter for Peach Bottom Atomic Power Station (Report 05000277/2014001 and 05000278/2014001)
ML15062A180
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/04/2015
From: Fred Bower
Reactor Projects Region 1 Branch 4
To: Bryan Hanson
Exelon Nuclear
BOWER, FL
Shared Package
ML15049A477 List:
References
IR 2014001
Download: ML15062A180 (5)


Text

March 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION (REPORT 05000277/2014001 AND 05000278/2014001)

Dear Mr. Hanson:

On February 12, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Peach Bottom Atomic Power Station (PBAPS). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, PBAPS Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to the baseline inspection program at PBAPS, we also plan to conduct Inspection Procedure (lP) 71004, "Power Uprate, and IP 60855.1, Operation of an IFISI Independent Spent Fuel Storage Installation at Operating Plants. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," is ongoing for various sites. The audit includes an onsite visit for the NRC staff to evaluate mitigating strategies as described in the licensee submittals, and to receive and review information relative to associated open items. This onsite audit will occur prior to the first unit at the site achieving compliance with the Orders and the audit will aid NRC staff in developing a final Safety Evaluation for the site. The audit at your site is being coordinated for the week of June 22, 2015. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

From January 1 to December 31, 2014, the NRC issued one traditional escalated enforcement action associated with the violation found in the inspection report 07200029/14-008 (ML14307A797). Therefore, the NRC plans to conduct IP 92702, Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders, to follow-up on this violation.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Fred Bower at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Fred L. Bower, III, Chief

Division of Reactor Projects

Projects Branch 4

Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56

Enclosure: Peach Bottom Atomic Power Station Inspection/Activity Plan

cc w/encl: Distribution via ListServ

ML15062A180 SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available

OFFICE RI/DRP RI/DRP

NAME SBarber/ GSB FBower/ FLB

DATE 02/19/15 02/ 19 /15

Page 1 of 2 01/26/2015 09:41:20 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Peach Bottom Inspection / Activity Plan 01/01/2015 - 06/30/2016 3/23EXAM

- INITIAL OL EXAM

2 FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAM U01911 02/23/2015 02/27/2015

FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAM U01911 03/23/2015 04/03/2015 7111111B

- REQUAL INSP W/ P/F RESULTS

2, 3 IP Licensed Operator Requalification Program 7111111B 03/23/2015 03/27/2015 EP

- EP PROGRAM INSPECTION

2, 3 IP Alert and Notification System Testing 7111402 03/09/2015 03/13/2015 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/09/2015 03/13/2015 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/09/2015 03/13/2015 TRI FI

- TRIENNIAL FIRE PROTECTION INSPECTION

2, 3 IP Fire Protection [Triennial]

7111105T 03/16/2015 03/20/2015 2, 3 IP Fire Protection [Triennial]

7111105T 03/30/2015 04/03/2015 71152B

- PI&R - BIENNIAL

2, 3 IP Problem Identification and Resolution 71152B 04/06/2015 04/10/2015 2, 3 IP Problem Identification and Resolution 71152B 04/20/2015 04/24/2015 ISFSI

- ISFSI LOADING INSPECTION

2, 3 IP Operation Of An ISFSI 60855 05/11/2015 05/15/2015 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/11/2015 05/15/2015 RS7

- 71124.07

2, 3 IP Radiological Environmental Monitoring Program 71124.07 06/22/2015 06/26/2015 71124.08

- RADWASTE

2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 07/20/2015 07/24/2015 RS45

- 71124.03,.04,.05

2, 3 IP Occupational Dose Assessment 71124.04 07/20/2015 07/24/2015 2, 3 IP Radiation Monitoring Instrumentation 71124.05 07/20/2015 07/24/2015 7111108G

- U3 INSERVICE INSPECTION

3 IP Inservice Inspection Activities - BWR 7111108G 09/14/2015 09/18/2015 RS123

- 71124.01,.02,.03

2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/28/2015 10/02/2015 2, 3 IP Occupational ALARA Planning and Controls 71124.02 09/28/2015 10/02/2015 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/28/2015 10/02/2015 2, 3 IP 71151-OR01 09/28/2015 10/02/2015 2, 3 IP 71151-PR01 09/28/2015 10/02/2015 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 01/26/2015 09:41:20 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Peach Bottom Inspection / Activity Plan 01/01/2015 - 06/30/2016 7111117T

- PERMANENT PLANT MODIFICATIONS

2, 3 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 01/25/2016 01/29/2016 2, 3 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 02/08/2016 02/12/2016 EP

- EP EXERCISE EVALUATION

2, 3 IP Exercise Evaluation 7111401 04/25/2016 04/29/2016 RS1234

- HP INSPECTION

2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/07/2016 03/11/2016 2, 3 IP Occupational ALARA Planning and Controls 71124.02 03/07/2016 03/11/2016 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/07/2016 03/11/2016 2, 3 IP Occupational Dose Assessment 71124.04 03/07/2016 03/11/2016 7111107T

- TRIENNIAL HEAT SINK

2, 3 IP Heat Sink Performance 7111107T 06/13/2016 06/17/2016 RS567

- HP TEAM INSPECTION

2, 3 IP Radiation Monitoring Instrumentation 71124.05 06/20/2016 06/24/2016 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/20/2016 06/24/2016 2, 3 IP Radiological Environmental Monitoring Program 71124.07 06/20/2016 06/24/2016 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.