Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23, Figure 5.1-1, Revision 1 & 2, ISFSI Loading Operations Flowchart (See Reference 5.2).
ML15026A689
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/07/2015
From:
Exelon Generation Co
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML15023A514 List: ... further results
References
Download: ML15026A689 (3)


Text

CASK HANDLING PIT FUEL POOL AUX. BLDG. TRUCK BAY HSM SITE LOWER CASK!

LOAD DSC INTO CASK -- DSCINTO FUEL POOL FILL ANNULUS BETWEEN LOAD FUEL DSC AND CASK WITH ASSEMBLIES DEMINERALIZED INTODSC WATER

! 0 CHECK & RECORD INSTALL AND IDENTITY &

PRESSURIZE LOCATION OF ANNULUS SEAL EACH FUELASSY.

INTHEDSC 0

FILL DSC CAVITY PLACE TOP WITH SHIELD PLUG BORATED WATER ONDSC DECONTAMINATE REMOVE THE OUTER SURFACE CASKIDSC FROM FUEL OF CASK


POOL BGE-A92.01M Figure 5.1-1 ISFSI Loading Operations Flowchart Page 1 of 3

[See Reference 5.2]

Rev. 1

~ASK OECON AREA FUEL POQ1. AUX BLDG TRt.:CK BAY HSM SIT~

LOWER WATER @ WELD PLUGS OVER ] INSTALL LEVEL IN DSC -......j-~ VENT AND TRUNNION CAVITY AND SIPHON PORTS RESTRAINTS ANNULUS AND PERFORM NDE SEAL WELD TOP INSTALL DSC REf'.AOVE SHIELD PLUG TOP COVER CASKBOTIOM TODSC PLATE COVER INSTALL CASK PE~FORM SEAL WELD INNER &OUiER NDEON COVER PLATE PLUG SEAL WELD TODSCSHELL ASSEMBLIES

~":"":\ ~.

~ ,....-----11~---

DAAJN TOW LOADED REMAINING WATEF PERFORM NDE ON SEAL WELD TRAILER FROMDSCAND TOHSM ANNULUS VACUUM INSTALL CASK DRYDSC TOP COVER PLATE I I BACKFILL DSC MOVE CAVITY WITH C.A.SKTO HELIUM mAILER

,___..._____ t PERFORM LOWER CASK HELIUM L.EAK -- ONTO

'reST SUPPORT SKID 1'1 Figure 5.1-1 ISFSI Loading Qgeratjoos Flowchart Page 2 of 3

[See Reference 5.2J Rev. 2

AUX. BLDG CASK DECON PIT FUEL POOL TRUCK BAY HSM SITE INSPECTHSM ALIGN RAM AND INTERIOR FOR PUSH DSC DEBRIS INTOHSM REMOVE RAM AND POSITION PULL CASK CASK WITH OUT OF HSMOPENING HSMOPENING lr REMOVE CASK INSTALLDSC TOP COVER PLATE SEISMIC

& SKID TIE-DOWN RESTRAINT AND BRACKET HSMDOOR FASTENERS ALIGN AND TACK WELD DOCK CASK HSMCLOSED WITH HSM DOOR OPENING BGE-A92.01M SECURE SKID AND INSTALLCASK r---

RESTRAINT SYSTEM Figure 5.1-1 ISFSI Loading Operations Flowchart Page 3 of 3

. f [See Reference 5.2]