Category:Letter type:RS
MONTHYEARRS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-074, Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-06-0909 June 2023 Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-23-055, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2023-04-10010 April 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-23-052, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-03-24024 March 2023 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-038, Response to Request for Additional Information for the Byron Proposal to Reinsert an Accident Tolerant Fuel Lead Test Assembly2023-02-27027 February 2023 Response to Request for Additional Information for the Byron Proposal to Reinsert an Accident Tolerant Fuel Lead Test Assembly RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-118, Withdrawal of License Amendment Request to Revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2022-10-31031 October 2022 Withdrawal of License Amendment Request to Revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.2022-09-20020 September 2022 Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. RS-22-097, License Amendment Request to Reinsert an Accident Tolerant Fuel Lead Test Assembly2022-08-31031 August 2022 License Amendment Request to Reinsert an Accident Tolerant Fuel Lead Test Assembly RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.2022-08-10010 August 2022 R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. RS-22-084, Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator .2022-06-17017 June 2022 Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator . RS-22-072, Response to Request for Additional Information Regarding License Amendment to Revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2022-06-0606 June 2022 Response to Request for Additional Information Regarding License Amendment to Revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-22-075, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2022-06-0202 June 2022 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-22-074, Response to Request for Additional Information - Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds .2022-05-20020 May 2022 Response to Request for Additional Information - Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds . RS-22-073, Supplemental Information Regarding License Amendment Request -Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube.2022-05-19019 May 2022 Supplemental Information Regarding License Amendment Request -Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube. RS-22-057, Constellation Radiological Emergency Plan Addendum Revision2022-04-21021 April 2022 Constellation Radiological Emergency Plan Addendum Revision RS-22-037, License Amendment Request - Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2022-04-21021 April 2022 License Amendment Request - Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-047, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2022-04-0808 April 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-22-050, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2022-04-0808 April 2022 Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-014, Application to Adopt TSTF-246, RTS Instrumentation, 3.3.1 Condition F Completion Time2022-03-24024 March 2022 Application to Adopt TSTF-246, RTS Instrumentation, 3.3.1 Condition F Completion Time RS-22-041, Withdrawal of License Amendment Request to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) to Add References to NRC Approved Topical Report with Administrative Changes2022-03-22022 March 2022 Withdrawal of License Amendment Request to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) to Add References to NRC Approved Topical Report with Administrative Changes RS-22-036, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2022-03-10010 March 2022 Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC 2024-01-11
[Table view] |
Text
Michael P. Gallagher Vice President. License Renewal Exelon Generation Exelon Nuclear 200 Exelon Way Kennett Square. PA 19348 610 765 5958 Office 610 765 5956 Fax www.exeloncorp.com michaelp.gallagher@exeloncorp.com 10 CFR 50 10 CFR 51 10 CFR 54 RS-15-035 January 23, 2015 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455
Subject:
Update to Report the Completion of Commitment 47, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, License Renewal Application
References:
- 1. Letter from Michael P. Gallagher, Exelon Generation Company LLC (Exelon) to NRC Document Control Desk, dated May 29, 2013, "Application for Renewed Operating Licenses"
- 2. Letter from Michael P. Gallagher, Exelon, to NRC Document Control Desk, dated December 19, 2013, "Updated Responses to two NRC Requests for Additional Information from Set 1, dated October 7, 2013, related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2 License Renewal Application" In Reference 1, Exelon Generation Company, LLC (Exelon) submitted the License Renewal Application (LRA) for the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2 (BBS) . In Reference 2, Exelon provided information related to the Byron Unit 2 reactor head closure stud 11, including a commitment.
During the Byron Unit 2 refueling outage in the fall of 2014, Exelon removed the previously stuck reactor head closure stud 11 and installed a new stud at this location, thereby completing license renewal commitment 47. Upon removal of stud 11, only minor surface corrosion of the removed stud and its associated reactor vessel head flange stud hole was found . Debris and
January 23, 2015 U.S. Nuclear Regulatory Commission Page 2 dirt were found within the stud hole and were removed via vacuuming and steam cleaning.
There were no signs of thread damage to either the removed stud or the stud hole. The stud hole was evaluated and determined acceptable for re-use, with minor clean-up performed, prior to placing the new stud in service at this location. These findings are consistent with the stuck-stud cause evaluation provided within the response to Request 3 associated with RAI B.2.1.3-1, contained in Exelon letter RS-13-247.
Enclosure A contains an update to the affected portion of LRA Appendix B, Section B.2.1.3, Reactor Head Closure Stud Bolting.
Enclosure B contains an update to the affected portion of LRA Appendix A, Section A.5, License Renewal Commitment List, updating the implementation status of this commitment. In addition, the Commitment List update corrects an editorial error associated with both Commitments 47 and 48, as further described in Enclosure B.
There are no new regulatory commitments contained in this letter.
If you have any questions, please contact Mr. Al Fulvio, Manager, Exelon License Renewal, at 610-765-5936.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on /- ~ J ""' 2 ()/ S-Respectfully, Michael P. Gallagher Vice President - License Renewal Projects Exelon Generation Company, LLC
Enclosures:
A: Byron and Braidwood Stations (BBS), Units 1 and 2, License Renewal Application (LRA) Update B: Byron and Braidwood Stations (BBS), Units 1 and 2, License Renewal Commitment List Update cc: Regional Administrator- NRC Region Ill NRC Project Manager (Safety Review), NRR-DLR NRC Project Manager (Environmental Review), NRR-DLR NRC Senior Resident Inspector, Braidwood Station NRC Senior Resident Inspector, Byron Station NRC Project Manager, NRR-DORL-Braidwood and Byron Stations Illinois Emergency Management Agency - Division of Nuclear Safety
RS-15-035 Enclosure A Page 1 of 3 Enclosure A Byron and Braidwood Stations (BBS), Units 1 and 2, License Renewal Application (LRA) Update This Enclosure provides an update to the Byron and Braidwood Stations (BBS), Units 1 and 2, LRA Appendix B, Reactor Head Closure Stud Bolting Program Description sub-section of Section B.2.1.3, as previously revised by Exelon submittal RS-13-285.
Revisions are indicated with bolded italics for inserted text and strikethroughs for deleted text.
B.2.1.3 Reactor Head Closure Stud Bolting Program Description The Reactor Head Closure Stud Bolting aging management program is an existing preventive and condition monitoring program which credits ASME Code,Section XI inspections of reactor head closure studs and associated RPV head flange threads, nuts, and washers for cracking and loss of material. The Reactor Head Closure Stud Bolting aging management program manages aging effects of an air with borated water leakage environment. The program is based on the examination and inspection requirements specified in the ASME Section XI Code, Subsection IWB, Table IWB-2500-1, and preventive measures described in NRC NUREG-1339, "Resolution of Generic Safety Issue 29: Bolting Degradation or Failure of Nuclear Power Plants"; and NRC Regulatory Guide 1.65, Materials and Inspection for Reactor Vessel Closure Studs.
The current Byron and Braidwood ISI program plans for the third ten-year inspection interval are based on the 2001 Edition of the ASME Code,Section XI, through the 2003 addenda. The future 120-month inspection intervals will incorporate the requirements specified in the version of the ASME Code incorporated into 10 CFR 50.55a, 12 months before the start of the inspection interval. The Reactor Head Closure Stud Bolting aging management program implements ASME Code,Section XI inspection requirements through the ISI program plan. The inspections monitor for cracking, loss of material, and reactor coolant leakage. The program uses visual and volumetric examinations in accordance with the requirements of Section XI, Subsection IWA-2000. The Reactor Head Closure Stud Bolting aging management program was developed in accordance with the requirements detailed in the ASME Code,Section XI, Division 1, Subsection IWB, Table IWB-2500-1.
ASME Code,Section XI allows for a number of examination methods to be used for volumetric and visual inspections. The RPV head flange threads and studs receive a volumetric examination and the surfaces of nuts and washers are inspected using a VT-1 examination. All pressure-retaining boundary
RS-15-035 Enclosure A Page 2 of 3 components in Examination Category B-P receive a visual VT-2 examination during the system leakage test and the system hydrostatic test. The extent and schedule for examining and testing the reactor head closure studs and associated RPV head flange threads, nuts, and washers is specified in Table IWB-2500-1 for Examination Category B-G-1 components, Pressure Retaining Bolting Greater than 2 Inches in Diameter.
Indications and relevant degraded conditions detected during examinations are evaluated in accordance with ASME Code,Section XI Subsection IWB-3100 for Class 1 components by comparing ISI results with the acceptance standards of IWB-3400 and IWB-3500. Specifically, flaw indications or relevant degraded conditions are evaluated in accordance with IWB-3515 or IWB-3517 as indicated in Table IWB-2500-1 and Table 3410-1 of ASME Code,Section XI. These monitoring methods are effective in detecting cracking and loss of materials and the frequency of monitoring is adequate to prevent significant age-related degradation.
The reactor head closure studs are constructed of ASME Code, SA540, Class 3, Grade B23 material, which has a maximum tensile strength of less than 170 ksi, which complied with Reg Guide 1.65, Revision 0 that was in effect during plant construction. The Reactor Head Closure Stud Bolting aging management program utilizes preventive measures to mitigate cracking described in Reg Guide 1.65, which includes the use of approved corrosion inhibitors and lubricants. The reactor head closure studs, nuts, and washers are fabricated with an acceptable phosphate coating to inhibit corrosion. In addition, a stable lubricant that does not contain molybdenum disulfide is applied to the threads prior to reactor vessel head re-installation.
Currently, Byron Unit 2 stud 11 and Braidwood Unit 2 stud 35 are is not in-service because they are it is not tensioned during operation. The configuration of the reactor vessel in-service studs, nuts, and washers is designed to allow them to be completely removed during each refueling outage and placed in storage racks on the containment operating deck. Therefore, in-service studs, nuts, and washers are not exposed to the borated refueling cavity water.
Also, in-service reactor vessel flange stud holes are sealed with plugs before the reactor cavity is flooded with borated water. After the reactor cavity is drained, borated water is removed from the areas above the plugs, the plugs are removed, and the reactor vessel flange holes are inspected. If any borated water has leaked past the plugs, the borated water is removed and the holes are cleaned. The out-of-service Braidwood Unit 2 reactor vessel flange stud hole 35, which is not plugged, is cleaned and inspected prior to reactor vessel flood-up. In addition, Braidwood Unit 2 reactor vessel flange stud hole 35 is cleaned, inspected, and borated water is removed after the reactor cavity is drained.
Therefore, exposure of accessible reactor vessel flange holes to borated water is minimized.
As shown in Appendix A, Table A.5, License Renewal Commitment List, items 47 and 48, commitments were made to repair Byron Unit 2 reactor head closure
RS-15-035 Enclosure A Page 3 of 3 stud location 11 and Braidwood Unit 2 reactor head closure stud location 35 will be repaired so that all 54 reactor head closure studs will be in-service and managed as described above during the period of extended operation.
Commitment item 47 was satisfied in October 2014 when the Byron Unit 2 stud 11 location was repaired.
RS-15-035 Enclosure B Page 1 of 2 Enclosure B Byron and Braidwood Stations (BBS), Units 1 and 2, License Renewal Commitment List Update This Enclosure provides an update to the Byron and Braidwood Stations (BBS), Units 1 and 2, LRA Appendix A, Table A.5 License Renewal Commitment List, documenting that Commitment 47 has been satisfied. In addition, the superscripted note in the Program or Topic column, associated with both Commitments 47 and 48, was inadvertently changed from Note 3 to Note 2 in Exelon letter RS-14-216. This is corrected, consistent with Exelon submittal RS 285.
Notes:
To facilitate understanding, portions of the original License Renewal Commitment List have been repeated in this Enclosure, with revisions indicated.
Existing LRA text, as modified by subsequent Exelon correspondence, is shown in normal font. Additions are highlighted with bolded italics; deletions are shown using strikethroughs.
RS-15-035 Enclosure B Page 2 of 2 As a result of the completion of activities at Byron Station, Unit 2, an update is being made to the implementation status of Commitment 47, as shown below. In addition, the superscripted note in the Program or Topic column, associated with both Commitments 47 and 48, was inadvertently changed from Note 3 to Note 2 in Exelon letter RS-14-216. This is corrected, consistent with Exelon submittal RS-13-285. Existing text from the LRA, as modified by subsequent submittals, is shown in normal font. Text inserted as a result of this update is shown in bolded italics; deleted text is shown with strikethroughs.
A.5 LICENSE RENEWAL COMMITMENT LIST NO. PROGRAM OR IMPLEMENTATION COMMITMENT SOURCE TOPIC SCHEDULE*
47 Byron Unit 2 Reactor Head Byron Unit 2 reactor head closure stud location 11 will be No later than six months prior to the Exelon letter Closure Stud Configuration repaired so that all 54 reactor head closure studs are period of extended operation. RS-13-285 (Byron only)Note 23 tensioned during the period of extended operation. Complete. 12-19-2013 RAI B.2.1.3-2 updated response Exelon letter RS-14-216 12/15/2014 Exelon letter RS-15-035 01/23/2015 48 Braidwood Unit 2 Reactor Braidwood Unit 2 reactor head closure stud location 35 will be No later than six months prior to the Exelon letter Head Closure Stud repaired so that all 54 reactor head closure studs are period of extended operation. RS-13-285 Configuration tensioned during the period of extended operation. 12/19/2013 (Braidwood only)Note 23 RAI B.2.1.3-2 updated response Exelon letter RS-14-216 12/15/2014 Exelon letter RS-15-035 01/23/2015