ML15016A159

From kanterella
Jump to navigation Jump to search
ISI RFI 2015
ML15016A159
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 01/16/2015
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: William Gideon
Progress Energy Carolinas
Linda K. Gruhler 404-997-4633
References
3150-0008, 3150-0011, 3150-0014, 3150-0044, 3150-0214
Download: ML15016A159 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 16, 2015 William R. Gideon Vice President Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461

SUBJECT:

BRUNSWICK NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR DOCUMENTS

Dear Mr. Gideon:

During the weeks of March 2 - 6, 2015, and March 16 - 20, 2015, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Radiation Safety Inspection at the Brunswick Nuclear Plant (NRC Inspection Procedures 71124.01, 71124.02, 71124.03, 71124.04, 71124.05, 71151, and the health physics portions of Temporary Instruction 2800/041). In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this activity. The NRC requests that these documents be provided to the inspectors no later than February 19, 2015.

We have discussed the schedule for these inspection activities with your staff, and understand that our regulatory contact for this inspection will be Mark Turkel. If there are any questions about this inspection, or the material requested, please contact the lead inspector, Adam Nielsen at 404-997-4660, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRCs Rules of Practice, a copy of this letter, and its Enclosure, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS; accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0214. The NRC may not conduct or

W. Gideon 2

sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

Sincerely,

/RA/

Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-324 and 325 License Nos. DPR-62 and DPR-71

Enclosure:

Document Request List cc: Distribution via Listserv

ML15016A159 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRS/PSB1 SIGNATURE ADN BRB1 NAME A. Nielsen B. Bonser DATE 1/ 15 /2015 1/ 16 /2015 E-MAIL COPY YES NO YES NO

Enclosure Document Request List Inspection Dates:

March 2 - 6, 2015, and March 16 - 20, 2015 Documents Due to Region II by:

February 19, 2015 Inspection Procedures:

IP 71124.01 Radiological Hazard Assessment and Exposure Controls IP 71124.02 Occupational As Low As Reasonably Achievable Planning and Controls IP 71124.03 In-plant Airborne Radioactivity Control and Mitigation IP 71124.04 Occupational Dose Assessment IP 71124.05 Radiation Monitoring Instrumentation IP 71151 Performance Indicator Verification TI 2800/041 10 CFR 37 Materials Security Review - At Facilities with a 10 CFR 73 Physical Protection Program Lead Inspector:

Adam Nielsen Sr. Health Physicist US NRC Region II 404-997-4660 Adam.Nielsen@nrc.gov Note: The current version of these documents is expected unless specified otherwise.

Electronic media is preferred if readily available. [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below, to the extent possible. Experience has shown that a poorly organized CD leads to a less efficient inspection and places additional burden on licensee staff.

Pay particular attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.

Miscellaneous

1. List of primary contacts for each inspection area w/phone numbers.
2. Corrective action program (CAP) procedure(s).

71124.01 - Radiological Hazard Assessment and Exposure Controls

1. List of outage radiation work permits (RWPs).
2. Timeline of major outage activities (e.g., Gantt chart or similar list).
3. Procedures related to health physics (HP) controls (e.g., posting, labeling, surveys, RWPs, contamination control, high radiation area (HRA)/locked high radiation area (LHRA)/very high radiation area (VHRA) control, key control, control of divers, special controls during fuel offload, hot spots, etc.).
4. Procedures related to release of personnel and materials (e.g., release surveys, decontamination, guidance for alarm followup, etc.).
5. List of Nationally Tracked Sources and any change-of-ownership transactions.
6. Most recent sealed source inventory record.

2

7. List of all non-fuel items stored in spent fuel pool.
8. Most recent self-assessment or audit covering HP controls.
9. List of NCRs related to HP controls (e.g., radworker error, HP technician error, posting issues, HRA/LHRA/VHRA issues, survey problems, etc.) issued since March 14, 2014.

[This should be a list of corrective action documents containing an AR number and brief description, not full nonconformance reports (NCRs).]

71124.02 - Occupational As Low As Reasonably Achievable Planning and Controls

1. All procedures related to As Low As Reasonably Achievable (ALARA) (e.g., temporary shielding, ALARA planning, source term reduction, etc.).
2. List of top 5 dose jobs for the upcoming refueling outage and ALARA planning packages (including dose estimates, work hour estimates, special HP controls, and dose reduction initiatives), if available.
3. ALARA trending point data for last two outages.
4. Source term reduction strategic plan, if available.
5. Minutes from the last four Plant ALARA Committee Meetings.
6. Most recent self-assessment or audit of ALARA program.
7. List of NCRs related to ALARA since April 1, 2013. [This should be a list of corrective action documents containing an AR number and brief description, not full NCRs.]

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

1. Procedures related to airborne monitoring and control (e.g., use of purge systems, use of portable HEPA/charcoal units, temporary ventilation enclosures, use of continuous air monitors (CAMs), air sampling guidance, Alpha air sampling, etc.), as applicable.
2. Procedures related to the use of respiratory protection devices, (e.g., self-contained breathing apparatus (SCBA), total effective dose equivalent (TEDE)-ALARA guidance, powered air purifying respirators (PAPRs), storage, maintenance, training, quality assurance (QA), fit-testing, etc.).
3. The last two grade D air testing certificates for each supplied air system and SCBA filling station.
4. SCBA qualification records (a)

Vendor training certificates for all onsite individuals qualified to repair SCBA (b)

List of all licensed operators qualified to use SCBA (c)

List of all I&C personnel qualified to use SCBA (d)

List of all HP personnel qualified to use SCBA

5. Documentation for last two surveillances performed on SCBA stored for emergency use.
6. Most recent audit or self-assessment covering airborne controls and respiratory protection.
7. List of NCRs related to airborne monitoring and respiratory protection since April 1, 2013.

[This should be a list of corrective action documents containing an AR number and brief description, not full NCRs.]

71124.04 - Occupational Dose Assessment

1. Procedures related to occupational dose assessment (e.g., external dose monitoring, dosimetry issuance and use, unusual dosimetry occurrences, multi-badging/extremity dosimetry/badge relocation, Effective Dose Equivalent, personnel contamination events, storage/care of personal dosimeters, use of electronic dosimeters, in-vivo and in-vitro internal dose assessment, skin dose assessment, quality control (QC) for whole body counter (WBC), use of passive monitoring if applicable, declared pregnant workers).

3

2. National Voluntary Laboratory Accreditation Program (NVLAP) accreditation documentation for current dosimetry used by site.
3. List of all positive WBCs, in-vitro, or air sampling analyses which resulted in an assigned committed effective dose equivalent (CEDE) equal to or exceeding 10 millirem since April 1, 2013. [Note: Only a listing should be provided for use by the inspectors to select a sample of issues for review during the onsite inspection.]
4. List of all Level III personnel contamination events identified since April 1, 2013. [Note:

Only a listing should be provided for use by the inspectors to select a sample of issues for review during the onsite inspection.]

5. Most recent audit or self-assessment of the dosimetry program and/or the most recent audit of the lab that processes site dosimetry.
6. List of NCRs generated since April 1, 2013, for internal or external dosimetry issues/events.

[This should be a list of corrective action documents containing an AR number and brief description, not full NCRs.]

71124.05 - Radiation Monitoring Instrumentation

1. Procedures/Guidance Documents for:

(a)

Calibration and functional test/source checks of portable radiation detection instruments (b)

Calibration and functional tests of small article monitor, personnel contamination monitor, portal monitor, WBC equipment, and continuous air monitors (c)

Collection and analysis of high-range, post-accident effluent samples (d)

QA program for count room instruments

2. The last two calibration records for each of the following instruments:

(a)

Unit 2 Post-accident Drywell High Range Area Monitors (b)

Unit 1 Reactor Building Roof Vent Monitor (c)

Main Stack Monitor and Associated Sample Line Flow Rate Monitor(s)

(d)

Unit 2 TIP Room Area Monitor (e)

All Portal Monitors at radiological controlled area (RCA) exit point (f)

All small article monitors (SAMs) at RCA exit point (g)

All Whole Body Contamination Monitors (Argos) at RCA exit point (h)

High-purity Germanium Detector No. 2

3. Documentation for the radioactive sources used to calibrate the instruments in item 2 above.

For the Main Stack Monitor and the U2 Drywell High Range Area Monitors, also include paperwork showing traceability to a National Institute of Standards & Technology (NIST) standard and/or traceability to the primary calibration, as applicable.

4. Design documents and/or calculations showing how the alarm setpoints for the following instruments are determined:

(a)

Unit 2 TIP Room Area Monitor (b)

Portal Monitors (PMs) at RCA exit point (c)

CAMs (e.g., AMS-4, mini-edgar, etc.)

5. Chart or procedure listing emergency action levels (EALs) associated with radiation monitors (if applicable).
6. The latest test record of the instrument calibrator (Shepherd validation testing/dose rate curves).
7. Latest system health report for the Radiation Monitoring system.
8. Most recent audit or self-assessment covering HP instruments (portables, RCA exit point, WBC, count room). Include any reviews conducted of vendor facilities, as applicable.

4

9. LIST of NCRs generated since April 1, 2013, related to portable instruments, effluent and area monitors, CAMs, RCA release point monitors, WBCs, and count room instruments.

[This should be a list of corrective action documents containing an AR number and brief description, not full NCRs.]

71151 - Performance Indicator Verification (Occupational and Public Cornerstones)

1. Procedure for gathering and reporting performance indicator (PI) data.
2. List of all NCRs related to effluent dose/ODCM issues since March 14, 2014. [This should be a list of corrective action documents containing an AR number and brief description, not full NCRs.]
3. LIST of all NCRs related to LHRA/VHRA issues or significant (>100 mrem) unintended doses since March 14, 2014. [This should be a list of corrective action documents containing an AR number and brief description, not full CRs.]
4. Most recent gaseous and liquid effluent release permits showing year-to-date doses to the public.
5. 2014 Annual Radioactive Effluent Report OR an end-of-year public dose report if the official Effluent Report is not ready yet.
6. LIST of electronic dosimeter alarms since March 14, 2014 (dose and dose rate).

TI 2800/041 - 10 CFR Part 37 (Health Physics portions only)

1. All procedures related to Part 37 compliance (shipping procedure, storage of radioactive material (RAM), Part 37 Security Plan, etc.). *
2. List of all known locations of Category 1 and Category 2 material.
3. All supporting calculations for determination of whether an aggregation of RAM meets the definition of Category 1 or Category 2 (e.g., warehouse calculation).
4. Shipping Logs from March 19, 2014 - present.
  • Please do not include Safeguards or Official Use Only information in the submittal. That information can be reviewed onsite.