Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 3, Figures 3.3-1 Through 3.6(N)-2
ML14317A510
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/21/2014
From:
NextEra Energy Seabrook
To:
Office of Nuclear Reactor Regulation
Shared Package
ML14317A463 List:
References
SBK-L-14179
Download: ML14317A510 (49)


Text

S EABROOK S TATION U PDATED F INAL S AFETY A NALYSIS R EPORT C HAPTER 3 DESIGN OF STRUCTURES

, COMPONENTS

, EQUIPMENT AND SYSTEMS F IGURES Pressure Coefficients Distribu tion for Cylinders and Spheres S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.3-1

1.00.90.8 0.70.60.50.40.30.20.1Size Factor C S = Average Pressure/Max. Tornado PressureSize Factor C S = Average Pressure/Max. Tornado Pressure300270240210180150120 60 30 90L (Feet)G:\Images_P\UFSAR\332.ds4 Tornado Size Factor C s Versus Building Length (L)

S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.3-2

Composite Piping Zones (Nuclear) Key Plan S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3A-1 See 805067

Turbine Building Zone Key Plan Piping S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3A-2 See 202117

Auxiliary Building Zone Key Plan Piping S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3A-3 See 202118

Waterproofing Concrete Typical Details S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.4-1 See 101696

Possible Turbine Missile Trajectory S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.5-1

Y X Y R L U ZG:\Word\Images_P\UFSAR\352.ds4 8 Coordinate Systems S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.5-2

ContainmentContainmentWasteProc AuxFuelPumpHouseTurbineTurbineAdminHeater BayHeater BayD. G.ControlD. G.Control AuxFuelElevation View From The NNWPlan ViewM. N.NScale in Feet 0100200Dashed Envelope is TargetArea For Large Aircraft.

Crossed Section of Envelope is FB-111A Target Area.G;\Word\Images_P\UFSAR\353.ds4 Plot Plan and Elevation View Showing Effective Target Area S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.5-3

2 16 14 12 10 8 6 4G:\Images_P\UFSAR\354.ds4 D 1 = Penetrationd = Diameter of Missle D S = Thickness required to Prevent Spalling D 1/d 2 4 6 8 10 12 S p a l l i n g L i m i tLimit Thickness D S d Relationship of Penetration to Scabbing Limit Thickness (Reference 12)

S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.5-4

X m/X e Curves for Elasto-Plastic System Rectangular Impulse Load (Reference 15)

S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.5-5

Main Steam Piping Outside Containment S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-1

Feedwater Piping Outside Containment S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-2

Containment Penetration (Hot High Energy Lines)

S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-3

Containment Penetration (Cold High Energy Lines)

S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-4

RC Line 13 Pipe Whip Restra int Protecting CS, RC and RH Lines and Valves - Containment Zone 43B S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-5

Pressurizer Surge Line Pipe Whip Restraint Protecting Steam Generator Blowdown and Safety Injection Lines - Containment Zone 45B S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-6

Pressurizer Surge Line Pipe Whip Restraint Protecting Steam Generator Support, Reactor C oolant and Safety Injection Lines -Containment Zone 44B and 45B S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-7

RC-58 Pipe Whip Restraint Protecting RC, RH, and SI Lines and Valves - Containment Zone 46B S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-8

Safety Injection Accumulator Line Pipe Whip Restraint Protecting CS, RH and RC Lines and Valves - Containment Zone 43B S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-9

SI Line Pipe Whip Restrain ts Protecting RC, RH, and SI Lines and Valves - Containment Zone 44B S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-10

SI Pipe Whip Restraint Protecting RC and SI Lines and Valves -Containment Zone 45B S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-11

SI Pipe Whip Restraint Protecting CS, RC, RH and SI Lines and Valves - Containment Zone 46B S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-12

MS & FW Pipe Whip Restraints Protecting MS and RC Lines, Upper Level Taps and CRDM Assembly - Containment Zone 57E [2 Sheets]

S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-13 Sh. 1 of 2

MS & FW Pipe Whip Restraints Protecting MS and RC Lines, Upper Level Taps and CRDM Assembly - Containment Zone 57E [2 Sheets]

S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-13 Sh. 2 of 2

Main Steam Pipe Whip Restraints Protecting SB, CBS Lines, Valves and Containment Liner/Penetrations - Containment Zone 53C S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-14

Main Steam Line Axial Pipe Whip Restraints Protecting Containment Penetrations - MS and FW Pipe Chase Zone 13B S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-15

Main Steam Pipe Whip Restraints Protecting the Main Steam Isolation Valves and the Containment Penetrations - MS and FW Pipe Chase Zone 14B S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-16

Break and Thrust Locations Isometric for MS Pipes in West Pipe Chase S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-17

Main Steam Line Axial Pipe Whip Restraints Protecting Containment Penetrations-MS and FW Pipe Chase Zone 16B S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-18

Main Steam Pipe Whip Restraint Protecting Containment Liner and Penetrations - Containment Zone 55D S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-19

Main Steam Line Axial Pipe Whip Restraints Protecting Containment Penetrations - MS and FW Pipe Chase Zone 16B S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-20

Main Steam Pipe Whip Restraints Protecting the Main Steam Isolation Valves and Containmen t Penetrations - MS and FW Pipe Chase Zone 17B S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-21

Break and Thrust Locations Isometric for MS Pipes in East Pipe Chase S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-22

Main Steam Pipe Whip Restraints Protecting West Pipe Chase North Wall - MS and FW Pipe Chase Zone 17C S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-23

Main Steam and Feedwater Pipe Whip Restraints Protecting East Wall of Control Building and Electrical Chase - MS and FW Pipe Chase Zone 15B S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-24

Feedwater Pipe Whip Restraint Protecting the Containment Liner and Penetrations and CC & SB Lines and Valves - Containment Zone 53C S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-25

Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - MS and FW Pipe Chase Zone 13A S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-26

Break and Thrust Locations Isometric for FW Pipes in West Pipe Chase S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-27

Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - MS and FW Pipe Chase Zone 14A S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-28

Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - Containment Zone 55C S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-29

Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - Containment Zone 16A S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-30

Break and Thrust Locations Isometric for FW Pipes in East Chase S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-31

Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - Containment Zone 17A S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-32

Pipe Bridge West Main Steam and Feedwater Pipe Whip Restraints Protecting Turbine and Control Buildings S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-33

Pipe Bridge East Main Steam and Feedwater Pipe Whip Restraints Protecting Turbine Building and Condensate Storage Tank S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(B)-34

BoundaryBoundaryBoundaryBoundaryTest Connection (Means of VerifyingThat Check Valve Is Closed)CASE IOutgoing Lines With Normally Closed ValveReactor Coolant PipingNote: Pressurizer Safety Valves Are Included Under This Case.CASE IIOutgoing Lines With Normally Open ValveNote: The Reactor Coolant Pump No. 1 Seal Is Assumed To Be Equivalent To First ValveRestraintFail Closed or Fail-As-Is Valves R RCASE IIIIncoming Lines Normally With FlowNo. 1 No. 2Test ConnectionCASE IVIncoming Lines Normally Without FlowCASE VAll Instrumentation Tubing and Instruments Connected Directly to the Reacotor Coolant System is Considered as a Boundary. However, a Break Within this Boundary Results in a Relatively Small Flow Which Can Normally be Made Up With the Charging System.G:\Word\Images_P\UFSAR\36N1.ds4 Loss of Reactor Coolant Accident Boundary Limits S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(N)-1

Steam Generator 2Steam GeneratorUpper SupportReactor CoolantPumpReactor CoolantPump SupportSteam GeneratorLower SupportReactorPressureVessel 1 3G:\Word\Images_P\UFSAR\36N2.ds4 Reactor Coolant System, Pipe Break and Whip Restraint Locations S EABROOK S TATION UPDATED F INAL SAFETY ANALYSIS R EPORT Figure 3.6(N)-2