SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT CHAPTER 3 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT AND SYSTEMS FIGURES
Pressure Coefficients Distribution for Cylinders and Spheres SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.3-1
1.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 Size Factor CS = Average Pressure/Max. Tornado Pressure Size Factor CS = Average Pressure/Max. Tornado Pressure 300 270 240 210 180 150 120 60 30 90 L (Feet)
G:\\Images_P\\UFSAR\\332.ds4 Tornado Size Factor Cs Versus Building Length (L)
SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.3-2
Composite Piping Zones (Nuclear) Key Plan SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3A-1 See 805067
Turbine Building Zone Key Plan Piping SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3A-2 See 202117
Auxiliary Building Zone Key Plan Piping SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3A-3 See 202118
Waterproofing Concrete Typical Details SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.4-1 See 101696
Possible Turbine Missile Trajectory SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.5-1
Y X
Y R
L U
Z G:\\Word\\Images_P\\UFSAR\\352.ds4 8
Coordinate Systems SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.5-2
Containment Containment Waste Proc Aux Fuel Pump House Turbine Turbine Admin Heater Bay Heater Bay D. G.
Control D. G.
Control Aux Fuel Elevation View From The NNW Plan View M. N.
N Scale in Feet 0
100 200 Dashed Envelope is Target Area For Large Aircraft.
Crossed Section of Envelope is FB-111A Target Area.
G;\\Word\\Images_P\\UFSAR\\353.ds4 Plot Plan and Elevation View Showing Effective Target Area SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.5-3
2 16 14 12 10 8
6 4
G:\\Images_P\\UFSAR\\354.ds4 D1 = Penetration d = Diameter of Missle DS = Thickness required to Prevent Spalling D1/d 2
4 6
8 10 12 Spalling Limit Limit Thickness DS d
Relationship of Penetration to Scabbing Limit Thickness (Reference 12)
SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.5-4
Xm/Xe Curves for Elasto-Plastic System Rectangular Impulse Load (Reference 15)
SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.5-5
Main Steam Piping Outside Containment SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-1
Feedwater Piping Outside Containment SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-2
Containment Penetration (Hot High Energy Lines)
SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-3
Containment Penetration (Cold High Energy Lines)
SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-4
RC Line 13 Pipe Whip Restraint Protecting CS, RC and RH Lines and Valves - Containment Zone 43B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-5
Pressurizer Surge Line Pipe Whip Restraint Protecting Steam Generator Blowdown and Safety Injection Lines -
Containment Zone 45B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-6
Pressurizer Surge Line Pipe Whip Restraint Protecting Steam Generator Support, Reactor Coolant and Safety Injection Lines -Containment Zone 44B and 45B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-7
RC-58 Pipe Whip Restraint Protecting RC, RH, and SI Lines and Valves - Containment Zone 46B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-8
Safety Injection Accumulator Line Pipe Whip Restraint Protecting CS, RH and RC Lines and Valves - Containment Zone 43B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-9
SI Line Pipe Whip Restraints Protecting RC, RH, and SI Lines and Valves - Containment Zone 44B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-10
SI Pipe Whip Restraint Protecting RC and SI Lines and Valves -Containment Zone 45B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-11
SI Pipe Whip Restraint Protecting CS, RC, RH and SI Lines and Valves - Containment Zone 46B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-12
MS & FW Pipe Whip Restraints Protecting MS and RC Lines, Upper Level Taps and CRDM Assembly -
Containment Zone 57E [2 Sheets]
SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-13 Sh. 1 of 2
MS & FW Pipe Whip Restraints Protecting MS and RC Lines, Upper Level Taps and CRDM Assembly -
Containment Zone 57E [2 Sheets]
SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-13 Sh. 2 of 2
Main Steam Pipe Whip Restraints Protecting SB, CBS Lines, Valves and Containment Liner/Penetrations - Containment Zone 53C SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-14
Main Steam Line Axial Pipe Whip Restraints Protecting Containment Penetrations - MS and FW Pipe Chase Zone 13B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-15
Main Steam Pipe Whip Restraints Protecting the Main Steam Isolation Valves and the Containment Penetrations - MS and FW Pipe Chase Zone 14B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-16
Break and Thrust Locations Isometric for MS Pipes in West Pipe Chase SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-17
Main Steam Line Axial Pipe Whip Restraints Protecting Containment Penetrations-MS and FW Pipe Chase Zone 16B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-18
Main Steam Pipe Whip Restraint Protecting Containment Liner and Penetrations - Containment Zone 55D SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-19
Main Steam Line Axial Pipe Whip Restraints Protecting Containment Penetrations - MS and FW Pipe Chase Zone 16B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-20
Main Steam Pipe Whip Restraints Protecting the Main Steam Isolation Valves and Containment Penetrations - MS and FW Pipe Chase Zone 17B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-21
Break and Thrust Locations Isometric for MS Pipes in East Pipe Chase SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-22
Main Steam Pipe Whip Restraints Protecting West Pipe Chase North Wall - MS and FW Pipe Chase Zone 17C SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-23
Main Steam and Feedwater Pipe Whip Restraints Protecting East Wall of Control Building and Electrical Chase - MS and FW Pipe Chase Zone 15B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-24
Feedwater Pipe Whip Restraint Protecting the Containment Liner and Penetrations and CC & SB Lines and Valves -
Containment Zone 53C SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-25
Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - MS and FW Pipe Chase Zone 13A SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-26
Break and Thrust Locations Isometric for FW Pipes in West Pipe Chase SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-27
Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - MS and FW Pipe Chase Zone 14A SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-28
Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - Containment Zone 55C SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-29
Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - Containment Zone 16A SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-30
Break and Thrust Locations Isometric for FW Pipes in East Chase SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-31
Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - Containment Zone 17A SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-32
Pipe Bridge West Main Steam and Feedwater Pipe Whip Restraints Protecting Turbine and Control Buildings SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-33
Pipe Bridge East Main Steam and Feedwater Pipe Whip Restraints Protecting Turbine Building and Condensate Storage Tank SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-34
Boundary Boundary Boundary Boundary Test Connection (Means of Verifying That Check Valve Is Closed)
CASE I Outgoing Lines With Normally Closed Valve Reactor Coolant Piping Note: Pressurizer Safety Valves Are Included Under This Case.
CASE II Outgoing Lines With Normally Open Valve Note: The Reactor Coolant Pump No. 1 Seal Is Assumed To Be Equivalent To First Valve Restraint Fail Closed or Fail-As-Is Valves R
R CASE III Incoming Lines Normally With Flow No. 1 No. 2 Test Connection CASE IV Incoming Lines Normally Without Flow CASE V All Instrumentation Tubing and Instruments Connected Directly to the Reacotor Coolant System is Considered as a Boundary. However, a Break Within this Boundary Results in a Relatively Small Flow Which Can Normally be Made Up With the Charging System.
G:\\Word\\Images_P\\UFSAR\\36N1.ds4 Loss of Reactor Coolant Accident Boundary Limits SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(N)-1
Steam Generator Upper Support Reactor Coolant Pump Reactor Coolant Pump Support Steam Generator Lower Support Reactor Pressure Vessel 1
3 G:\\Word\\Images_P\\UFSAR\\36N2.ds4 Reactor Coolant System, Pipe Break and Whip Restraint Locations SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(N)-2