Exelon Nuclear Job Performance Measure Approve the Unit One Electrical Distribution Breaker and Voltage Verification Surveillance JPM Number: 2014 ILT NRC JPM SRO Admin 2 Revision Number: 00 Date: 10/22/2013 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 9

2014 ILT NRC JPM SRO Admin 2 - Rev. 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure QCOS 0005-08 Rev: 31 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 9

2014 ILT NRC JPM SRO Admin 2 - Rev. 00 Revision Record (Summary)

Revision 00, Renamed JPM to 2014 ILT NRC JPM SRO Admin 2. Restarted numbering accordingly.

Previous revision was:

Modified from Dresden ILT 2008 NRC Exam. JPM renamed to SRO-028-I.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 9

2014 ILT NRC JPM SRO Admin 2 - Rev. 00 SETUP INSTRUCTIONS

1. No simulator setup is required
2. Prepare a copy of QCOS 0005-08 as follows:
  • Step D.1.a. Check Normal Surveillance.
  • Step D.1.b. Sign as Unit Supervisor and write in current for date and time.
  • Step D.2 Record one for Operational Mode.
  • Sign off step H.3.(a) and (b).
  • Sign off all steps of Attachments D, except step 1.a.(3) which is N/A.
  • Sign off all steps of Attachment E except for step 1.a.(2) and 2.a.(2), indicate N/A.
3. This completes the setup for this JPM.

SRO Admin 2 QCOS 0005-08, Rev 031, UN SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 9

2014 ILT NRC JPM SRO Admin 2 - Rev. 00 INITIAL CONDITIONS You are the Unit 1 Control Room Supervisor.

Unit 1 is operating at rated power with a normal electric plant lineup.

Unit 2 is currently at 300 psig and lowering with a shutdown in progress for a weekend outage.

QCOS 0005-08, Unit One Electrical Distribution Breaker and Voltage Verification, was completed last shift by the Admin NSO and is ready for review.

Lines 0401 and 0403 are Out of Service.

Transformer 12 Load Tap Changer (LTC) is in automatic with the Tap Setting at 9.

Switchyard voltage is presently at 353 KV.

Notification from Transmission has been received that the Predicted Post Unit Trip switchyard voltage is low at 345.2 KV.

This JPM is NOT time critical.

INITIATING CUE QCOS 0005-08, Unit One Electrical Distribution Breaker and Voltage Verification surveillance has been submitted for your review. Perform the review.

{When candidate acknowledges the cue, provide the candidate with the QCOS 0005-08 for review}

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 9

2014 ILT NRC JPM SRO Admin 2 - Rev. 00 candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 9

2014 ILT NRC JPM SRO Admin 2 - Rev. 00 JPM Start Time:

Comment SAT UNSAT STEP ELEMENT STANDARD Number EVALUATOR NOTE: The examinee reviews the surveillance and identifies the two problems listed below:

Step H.1.a *Verify the number of From the Initial Conditions, ___ ___ ___

offsite lines available.* offsite lines 0401 and 0403 are OOS.

Per Attachment A, only ONE offsite line is available.

Procedure acceptance criteria for Mode 1 operation is NOT met.

CUE: As Shift Manager, acknowledge the report of only one offsite line available and state that you will review Technical Specifications for the Required Actions.

Attachment *If Unit 2 is in Modes 1, From Initial Conditions with ___ ___ ___

E 2, or 3, then verify RPV pressure at 300 psig, Unit 2 is in Mode 3.

Step 1.a.(2) EMERGENCY SOURCE ACCEPTED red light is lit Determines Attachment E, step on U2 ESS ABT.* 1.a.(2) must be performed.

Determines Attachment E, step 1.a.(3) is N/A.

CUE: If the examinee dispatches an EO to perform Attachment E step 1.a.(2),

then as EO report from the Aux Electric Room that : the EMERGENCY SOURCE ACCEPTED red light is lit on the Unit 2 ESS ABT.

EVALUATOR NOTE: The examinee should inform you that the Acceptance Criteria is NOT met and the surveillance is NOT approved. The task is complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 9

2014 ILT NRC JPM SRO Admin 2 - Rev. 00 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Review and Approve the Unit One Electrical Breaker and Voltage Verification Surveillance.

JPM Number: 2014 ILT NRC JPM SRO Admin 2 Revision Number: 00 Task Number and

Title:

SR-6500-K32 (Freq: LIC=B) Given 4KV / 480 VAC Distribution Systems operability status OR key parameter indications, various plant conditions and a copy of Tech Specs, DETERMINE Tech Spec compliance and required actions, if any.

K/A Number and Importance: KA: 2.1.25 Rating: SRO 4.2 Ability to interpret reference materials, such as graphs, curves, tables, etc.

Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOS 0005-08, Rev. 31, Unit One Electrical Distribution Breaker and Voltage Verification Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

[If this page is an odd numbered page, a blank page is automatically generated after this page to keep the student cue sheet separate from this page]

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 9

2014 ILT NRC JPM SRO Admin 2 - Rev. 00 INITIAL CONDITIONS You are the Unit 1 Control Room Supervisor.

Unit 1 is operating at rated power with a normal electric plant lineup.

Unit 2 is currently at 300 psig and lowering with a shutdown in progress for a weekend outage.

QCOS 0005-08, Unit One Electrical Distribution Breaker and Voltage Verification, was completed last shift by the Admin NSO and is ready for review.

Lines 0401 and 0403 are Out of Service.

Transformer 12 Load Tap Changer (LTC) is in automatic with the Tap Setting at 9.

Switchyard voltage is presently at 353 KV.

Notification from Transmission has been received that the Predicted Post Unit Trip switchyard voltage is low at 345.2 KV.

This JPM is NOT time critical.

INITIATING CUE QCOS 0005-08, Unit One Electrical Distribution Breaker and Voltage Verification surveillance has been submitted for your review. Perform the review.