MONTHYEARML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23079A2262023-03-20020 March 2023 Form 5.1-1 Post-Examination Check Sheet (Quad Cities, 2023) IR 05000254/20233012023-03-0707 March 2023 NRC Initial License Examination Report 05000254/2023301; 05000265/2023301 ML23079A2222023-02-21021 February 2023 Form 2.1-1 Examination Preparation Checklist ML23079A2192023-02-21021 February 2023 Form 1.3-1 Exam Security Agreement SVP-23-007, Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023)2023-02-0909 February 2023 Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023) ML23079A2282023-02-0808 February 2023 Post-Exam Review Comments (None) ML23020A4132023-01-23023 January 2023 Operator License Examination Approval - Quad Cities Nuclear Power Station, January 2023 ML23079A2072023-01-13013 January 2023 Form 2.3-4 Written Examination Quality Checklist (Quad Cities, 2023) ML23079A2042023-01-13013 January 2023 Form 2.3-2 Operating Test Quality Checklist (Quad Cities, 2023) ML23079A2032022-11-11011 November 2022 Licensee Proposed Exam Cover Letter (SVP-22-065, Quad Cities, 2023) ML23079A0842022-10-17017 October 2022 Form 3.4-1 Events and Evolutions Checklist (Quad Cities, 2023) ML23079A0432022-10-17017 October 2022 Form 2.3-1 Examination Outline Quality Checklist (Quad Cities, 2023).pdf ML23079A0272022-10-0505 October 2022 Licensee Outline Submittal Email (Quad Cities, 2023) ML22188A1752022-07-11011 July 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21281A1242021-10-0808 October 2021 GFE Results, September 2021 IR 05000254/20213012021-08-23023 August 2021 NRC Initial License Examination Report 05000254/2021301; 05000265/2021301 ML22192A2062021-07-0909 July 2021 2021 QC Ile Outline Submittal Comments ML22192A2052021-07-0909 July 2021 2021 QC Ile ES-401-9 Written Examination Review Worksheet-Final ML22192A2032021-07-0909 July 2021 2021 QC Ile ES-301-7 Operating Test Review Worksheet-Final ML22192A1922021-07-0909 July 2021 2021 QC Ile ES-201-1 ML22192A1932021-07-0909 July 2021 2021 QC Ile ES-201-3 Security Agreement-Final ML22192A1952021-07-0909 July 2021 2021 QC Ile ES-403-1 Written Exam Quality Checklist ML22192A2042021-07-0909 July 2021 2021 QC Ile ES-401-4 Rejected KAs ML22192A1962021-06-22022 June 2021 2021 QC Ile Post-Exam Submittal Letter-06-22-2021 ML22193A2862021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Written Exam-Final ML22193A2872021-06-14014 June 2021 2021 QC Ile Administered RO and SRO List of Reference Handouts-Final ML22193A0932021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Admin JPMs-Final ML22193A1072021-06-14014 June 2021 2021 QC Ile Administered Simulator Scenarios-Final ML22193A1052021-06-14014 June 2021 2021 QC Ile Administered Simulator and Inplant JPMs-Final ML21152A1022021-06-0202 June 2021 Operator Licensing Examination Approval ML22193A3112021-05-0505 May 2021 2021 QC Ile Proposed Simulator Scenarios ML22193A3102021-05-0505 May 2021 2021 QC Ile Proposed Simulator and Inplant JPMs ML22193A3012021-05-0505 May 2021 2021 QC Ile ES-301-6 Competencies Checklist ML22193A3082021-05-0505 May 2021 2021 QC Ile Proposed RO and SRO Admin JPMs ML22193A3002021-05-0505 May 2021 2021 QC Ile ES-301-4 Simulator Scenario Quality Checklist ML22193A3032021-05-0505 May 2021 2021 QC Ile ES-401-6 Written Exam Quality Checklist ML22193A2992021-05-0505 May 2021 2021 QC Ile ES-301-3 Operating Test Quality Checklist ML22193A3122021-05-0505 May 2021 2021 QC Ile Proposed Written Exam-RO and SRO ML22193A3222021-04-0707 April 2021 2021 Quad-Cities Ile ES-D-1 Scenario Outlines ML22193A3202021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-2 RO and SRO Sim-Inplant Systems Outlines ML22193A3142021-04-0707 April 2021 2021 Quad-Cities Ile ES-201-2 Outline Quality Checklist ML22193A3192021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-1 RO and SRO Admin Topics Outlines 2023-08-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23079A2262023-03-20020 March 2023 Form 5.1-1 Post-Examination Check Sheet (Quad Cities, 2023) IR 05000254/20233012023-03-0707 March 2023 NRC Initial License Examination Report 05000254/2023301; 05000265/2023301 ML23079A2192023-02-21021 February 2023 Form 1.3-1 Exam Security Agreement ML23079A2222023-02-21021 February 2023 Form 2.1-1 Examination Preparation Checklist SVP-23-007, Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023)2023-02-0909 February 2023 Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023) ML23079A2282023-02-0808 February 2023 Post-Exam Review Comments (None) ML23020A4132023-01-23023 January 2023 Operator License Examination Approval - Quad Cities Nuclear Power Station, January 2023 ML23079A2072023-01-13013 January 2023 Form 2.3-4 Written Examination Quality Checklist (Quad Cities, 2023) ML23079A2042023-01-13013 January 2023 Form 2.3-2 Operating Test Quality Checklist (Quad Cities, 2023) ML23079A2032022-11-11011 November 2022 Licensee Proposed Exam Cover Letter (SVP-22-065, Quad Cities, 2023) ML23079A0842022-10-17017 October 2022 Form 3.4-1 Events and Evolutions Checklist (Quad Cities, 2023) ML23079A0432022-10-17017 October 2022 Form 2.3-1 Examination Outline Quality Checklist (Quad Cities, 2023).pdf ML23079A0272022-10-0505 October 2022 Licensee Outline Submittal Email (Quad Cities, 2023) ML22188A1752022-07-11011 July 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000254/20213012021-08-23023 August 2021 NRC Initial License Examination Report 05000254/2021301; 05000265/2021301 ML22192A1952021-07-0909 July 2021 2021 QC Ile ES-403-1 Written Exam Quality Checklist ML22192A2032021-07-0909 July 2021 2021 QC Ile ES-301-7 Operating Test Review Worksheet-Final ML22192A1932021-07-0909 July 2021 2021 QC Ile ES-201-3 Security Agreement-Final ML22192A2052021-07-0909 July 2021 2021 QC Ile ES-401-9 Written Examination Review Worksheet-Final ML22192A2062021-07-0909 July 2021 2021 QC Ile Outline Submittal Comments ML22192A2042021-07-0909 July 2021 2021 QC Ile ES-401-4 Rejected KAs ML22192A1922021-07-0909 July 2021 2021 QC Ile ES-201-1 ML22192A1962021-06-22022 June 2021 2021 QC Ile Post-Exam Submittal Letter-06-22-2021 ML22193A1052021-06-14014 June 2021 2021 QC Ile Administered Simulator and Inplant JPMs-Final ML22193A2862021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Written Exam-Final ML22193A2872021-06-14014 June 2021 2021 QC Ile Administered RO and SRO List of Reference Handouts-Final ML22193A0932021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Admin JPMs-Final ML22193A1072021-06-14014 June 2021 2021 QC Ile Administered Simulator Scenarios-Final ML21152A1022021-06-0202 June 2021 Operator Licensing Examination Approval ML22193A2992021-05-0505 May 2021 2021 QC Ile ES-301-3 Operating Test Quality Checklist ML22193A3082021-05-0505 May 2021 2021 QC Ile Proposed RO and SRO Admin JPMs ML22193A3032021-05-0505 May 2021 2021 QC Ile ES-401-6 Written Exam Quality Checklist ML22193A3102021-05-0505 May 2021 2021 QC Ile Proposed Simulator and Inplant JPMs ML22193A3122021-05-0505 May 2021 2021 QC Ile Proposed Written Exam-RO and SRO ML22193A3002021-05-0505 May 2021 2021 QC Ile ES-301-4 Simulator Scenario Quality Checklist ML22193A3012021-05-0505 May 2021 2021 QC Ile ES-301-6 Competencies Checklist ML22193A3112021-05-0505 May 2021 2021 QC Ile Proposed Simulator Scenarios ML22193A3202021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-2 RO and SRO Sim-Inplant Systems Outlines ML22193A3142021-04-0707 April 2021 2021 Quad-Cities Ile ES-201-2 Outline Quality Checklist ML22193A3162021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-5 Transient and Event Checklists ML22193A3192021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-1 RO and SRO Admin Topics Outlines ML22193A3222021-04-0707 April 2021 2021 Quad-Cities Ile ES-D-1 Scenario Outlines ML22193A3212021-04-0707 April 2021 2021 Quad-Cities Ile ES-401-1 and ES-401-3 2023-08-07
[Table view] |
Text
Exelon Nuclear Job Performance Measure Initiate Standby Liquid Control with Failure to Inject JPM Number: 2014 ILT NRC JPM a Revision Number: 00 Date: 02/27/14 Developed By:
Instructor Date Validated By:
SME or Instructor Date Reviewed By:
Operations Representative Date Approved By:
Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 9
2014 ILT NRC JPM a - Rev. 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure QCOP 1100-02 Rev: 12 Procedure Rev:
Procedure Rev:
________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 9
2014 ILT NRC JPM a - Rev. 00 Revision Record (Summary)
Revision 00, Renamed 2014 ILT NRC JPM a. Restarted revision numbering accordingly.
Previous changes were:
Revision 06, Reworded to match wording of LS-008-I, the non-faulted version of the same JPM.
Revision 07, JPM revised to reflect procedure changes.
Revision 08, JPM revised to reflect simulator setup commands and new average performance time.
Revision 09, JPM revised to reflect procedure changes.
Revision 10, JPM revised to reflect single pump injection, procedure change, and removal of one critical task.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 9
2014 ILT NRC JPM a - Rev. 00 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC at power > 20%
- 2. Manual Actuation:
Ensure the SBLC key is in the Control switch.
- 3. Malfunctions (contained in caep file A caep.cae)
Setup for a jpml00:00:00l00 Fail the SBLC pumps to work (2 commands)l00:00:00l01 imf SL01Al00:00:02l02 imf SL01Bl00:00:04l03 Set triggers 1 and 2 true when both squib lights are outl00:00:04l04 trgset 1(.NOT. ZLOHS11130301(2)) .AND. (.NOT. ZLOHS11130301(4)) l00:00:06l05 trgset 2(.NOT. ZLOHS11130301(2)) .AND. (.NOT. ZLOHS11130301(4)) l00:00:08l06 When triggers 1 and 2 true, delete the pump tripsl00:00:00l07 trg 1 dmf sl01a l00:00:10l08 trg 2 dmf sl01b l00:00:12l09
- 4. Remotes:
NONE
- 5. Overrides:
NONE
- 6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
- 7. This completes the setup for this JPM.
A caep.cae JPM A QCOP 1100-02, Rev 012, IN SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 9
2014 ILT NRC JPM a - Rev. 00 INITIAL CONDITIONS U-1 has experienced an ATWS. The following conditions exist:
o Reactor power > 5%.
o Both Recirc pumps were tripped per QGA 101.
There is no LOCA in progress.
The SBLC system is in standby lineup.
The Unit Supervisor has determined that SBLC must be initiated per QGA 101.
This JPM is not time critical.
INITIATING CUE Inject the Standby Liquid Control System per the hard card.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 9
2014 ILT NRC JPM a - Rev. 00 JPM Start Time:
Comment SAT UNSAT STEP ELEMENT STANDARD Number Obtain procedure to be used. Obtains procedure QCOP 1100- ___ ___ ___
02 hard card for injecting SBLC.
F.1. Select System 1 or 2 with Positions SBLC keylock switch ___ ___ ___
keylock switch A and B to System 1 or 2.
SELECT.
EVALUATOR NOTE: Initial cue states no LOCA in progress, candidate should only inject with one pump at a time.
- F.2. *Determines SBLC NOT Determines SBLC NOT ___ ___ ___
injecting.* injecting by any one or more of the following indications:
SBLC flow light NOT lit.
SBLC tank level is NOT decreasing. (LI-1-1140-2)
Pump discharge press < Rx press. (PI-1-1140-1)
Verify neutron flux NOT decreasing. (APRM recorders)
EVALUATOR NOTE: Alternate path starts here.
- F.3. *Attempt to inject SBLC with the Repositions SBLC keylock ___ ___ ___
opposite switch position.* switch to the opposite position that was initially selected.
SIMULATOR OPERATOR NOTE: When operator takes switch to the opposite position, verify triggers 1 and 2 go true and malfunctions SL01A and SL01B are deleted.
Reports SBLC is injecting. Informs US that SBLC is ___ ___ ___
injecting.
EVALUATOR: The candidate should inform you that the task is complete.
JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 9
2014 ILT NRC JPM a - Rev. 00 JPM
SUMMARY
Operators Name: Job
Title:
EO RO SRO FS STA/IA SRO Cert JPM
Title:
Initiate Standby Liquid Control with Failure to Inject JPM Number: 2014 ILT NRC JPM a Revision Number: 00 Task Number and
Title:
SR-1100-P02 (Freq: LIC=A) (ILT-MP) Given a reactor plant with an ATWS, inject boron prior to exceeding 110 degrees torus water temperature OR if core instability is observed in accordance with QGA 101 and QCOP 1100-02.
(Important PRA Operator Action - starting SBLC terminates 1 of the top 100 most probable Core Damage Sequences and has a RAW of 17.3)
K/A Number and Importance: K/A: 211000 A4.02 Rating: 4.2/4.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 1100-02, Rev. 12, INJECTION OF STANDBY LIQUID CONTROL Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 6.0 minutes Actual Time Used: minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: (Print)
Evaluators Signature: Date:
[If this page is an odd numbered page, a blank page is automatically generated after this page to keep the student cue sheet separate from this page]
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 9
INITIAL CONDITIONS U-1 has experienced an ATWS. The following conditions exist:
o Reactor power > 5%.
o Both Recirc pumps were tripped per QGA 101.
o There is no LOCA in progress The SBLC system is in standby lineup.
The Unit Supervisor has determined that SBLC must be initiated per QGA 101.
This JPM is not time critical.
INITIATING CUE Inject the Standby Liquid Control System per the hard card.
SRRS: 3D.105 (when utilized for operator initial or continuing training)