Forwards Safety Evaluation Re Util 840413 Submittal of Revised Inservice Testing Program for Pumps & Valves for Second 10-yr Interval.Valves Mentioned in Evaluation Should Be Scheduled for Inclusion in Testing Program
ML14192A727
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 12/23/1985
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML14192A728 List:
References
TAC-11215, NUDOCS 8601060106
Download: ML14192A727 (7)


Text

DEC 2 3 1985 Docket No. 50-261 DISTRIBUTION DokFte NRC PDR L PDR ORB#1 Rdg Gray File HThompson Mr. E. E. Utley, Senior Executive Vice President OELD GRequa Power Supply and Engineering & Construction Edordan CParrish Carolina Power and Light Company BGrimes JPartlow Post Office Box 1551 ACRS(10)

ORotherberg Raleigh, North Carolina 27602 SVarga LRubenstein

==Dear

==

r.

Uley:RBosnak

==Dear

==

r. Uley:Ei senhut/Denton

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 -

IN-SERVICE TESTING (DST)

PROGRAM FOR PUMPS AND VALVES FOR THE SECOND 10 YEAR INTERVAL -

(TAC 11215)

We have completed our review of your revised In-Service Test (IST) program for inspection interval 2 (March 7, 1981 to March 7, 1991) submitted by letter dated January 13, 1984 for H. B. Robinson Unit 2. The submittal was supplemented by letter dated April 13, 1984.

Your submittals contained requests for relief for H. B. Robinson Unit 2 from the American Society of Mechanical EngineersSection XI Code requirements for inservice testing of pumps and valves. These requests superseded your earlier requests dated March 10, 1981 and December 9, 1982.

Our findings are summarized in the enclosed Safety Evaluation (SE)

Sections 2 and 3 of the SE certain reliefs and denials including the basis of each (see Appendix E for list of denials).

The pumps and valves of the fire protection system were not reviewed in the enclosed SER.

You are required to comply with the IST program dated January 13, 1984 as amended on April 13, 1984 in accordance with the relief granted or denied by the SER. Any program revisions subsequent to and/or not in compliance with those notes in the SER are not approved. Required program changes, such as additional relief requests or the deletions of any components from the cST program, should be submitted to the NRC under separate cover in order to receive prompt attention; but must not be implemented prior to the review and approval by the NRC.

In our evaluation of your program, we identified possible deficiencies in the scope of the program. These are summarized in Appendix D and E of the SE.

Please review our position regarding these valves in our SE and either schedule these for inclusion into your testing program or provide justification for their omission from your program within 30 days of receipt of this letter. We have determined pursuant to 10 CFR 50.55a(g)(6)(i), that the granting of relief is authorized by law and will E601060106, 81-51223 PDR ADUCK.O0o0261 P_

PJR_

9 Mr. E. E. Utley

- 2 not endanger life or property or the common defense and security and is otherwise in the public interest. In making this determination, we have given due consideration to the burden that could result if these requirements were imposed on your facility.

Our Safety Evaluation is enclosed for your information.

Sincerely, Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/enclosure:

See next page

  • SEE PREVIOUS WHITE FOR CONCURRENCES ORB#1:DL ORB#1:

- R #1:DL V OELD AD/CSEB* MEB*

CParrish GReq

'a RJBosnak Rothberg 9/25/85 11/9 5

10/3/85 10/28/85 10/28/85 OR D:DL D

GL as HThompson ShuHD on 11/)/85

/85 1

/

D:PAD-2 LRube stein 85

Mr. E. E. Utley

- 2 The pumps and valves of the fire protection system were not reviewed in the enclosed SER.

You are required to comply with the IST program dated January 13, 84 as amended on April 13, 1984 in accordance with the relief granted denied by the SER. Any program revisions subsequent to and/or not in ompliance with those notes in the SER are not approved. Required progr m changes, such as additional relief requests or the deletions of any omponents from the IST program, should be submitted to the NRC unde separate cover in order to receive prompt attention; but must not be i lemented prior to the review and approval by the NRC.

In our evaluation of your program, we identified p sible deficiencies in the scope of the program. These are summarized i Appendix D and E of the SE. Please review our position regarding these alves in our SE and either schedule these for inclusion into your testing rogram or provide justification for their omission from your pr gram within 30 days of receipt of this letter. We have determined ursuant to 10 CFR 50.55a(g)(6)(i), that the granting of reli f is authorized by law and will not endanger life or property or the com n defense and security and is otherwise in the public interest. In ing this determination, we have given due consideration to the burden hat could result if these requirements were imposed on your fa ility.

Our Safety Evaluation is enclosed or your information.

Sincerely, Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/enclosure:

See next page /

  • SEE PREVIOUS WHITE FOR CONCURRENCES ORB#1* Zi BC-ORB#1:DL*

OELD*

AD/

MEB CParrish GRe s

SVarga RJBonak Roth erg 9/25/85 l00/

/85 10/2/85 10/3/85 10/85 10485

.AD-OR:DL D:DL GLainas HThompson 10/ /85 10/ /85

Mr. E. E. Utley

- 2 The pumps and valves of the fire protection system were not reviewed in the enclosed SER.

You are required to comply with the IST program dated January 13, 1984 as amended on April 13, 1984 in accordance with the relief granted or denied by the SER. Any program revisions subsequent to and/or not in compliance with those notes in the SER are not approved. Required program changes, such as additional relief requests or the delegations of any component from the IST program, should be submitted to the NRC under separate c er in order to receive prompt attention; but must not be implemented pr or to the review and approval by the NRC.

In our evaluation of your program, we identified possible defi encies in the scope of the program. These are summarized in Appendix D and E of the SE. Please review our position regarding these valves in o SE and either schedule these for inclusion into your testing program or ovide justification for their omission from your program withi 30 days of receipt of this letter. We have determined pursuant to 0 CFR 50.55a(g)(6)(i), that the granting of relief is autho zed by law and will not endanger life or property or the common defense nd security and is otherwise in the public interest. In making this etermination, we have given due consideration to the burden that could esult if these requirements were imposed on your facility.

Our Safety Evaluation is enclosed for your I formation.

Since ely, teven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing

Enclosure:

As stated cc w/enclosure:

See next page ORB#1:D ORB#1:

C-B#1:DL CPa ish GRe Va a

9M 5 9

/9

/85 0/ 5/85

DEC 2 3 1985 Docket No. 50-261 DISTRIBUTION DocketFile NRC PDR L PDR ORB#1 Rdg Gray File HThompson Mr. E. E. Utley, Senior Executive Vice President QELD GRequa Power Supply and Engineering & Construction Edordan CParrish Carolina Power and Light Company BGrimes JPartlow Post Office Box 1551 ACRS (10)

ORotherberg Raleigh, North Carolina 27602 SVarga LRubenstein RBosnak

Dear Mr. Utley:

Eisenhut/Denton

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 -

IN-SERVICE TESTING (DST)

PROGRAM FOR PUMPS AND VALVES FOR THE SECOND 10 YEAR INTERVAL -

(TAC 11215)

We have completed our review of your revised In-Service Test (1ST) program for inspection interval 2 (March 7, 1981 to March 7, 1991) submitted by letter dated January 13, 1984 for H. B. Robinson Unit 2. The submittal was supplemented by letter dated April 13, 1984.

Your submittals contained requests for relief for H. B. Robinson Unit 2 from the American Society of Mechanical EngineersSection XI Code requirements for inservice testing of pumps and valves. These requests superseded your earlier requests dated March 10, 1981 and December 9, 1982.

Our findings are sum~marized in the enclo sed Safety Evaluation (SE)

Sections 2 and 3 of the SE certain reliefs and denials including the basis of each (see Appendix E for list of denials).

The pumps and valves of the fire protection system were not reviewed in the enclosed SER.

You are required to comply with the IST program dated January 13, 1984 as amended on April 13, 1984 in accordance with the relief granted or denied by the SER. Any program revisions subsequent to and/or not in compliance with those notes in the SER are not approved. Required program changes, such as additional relief requeis-or the deletions of 'any components from the cST program, should be submitted to the NRC under separate cover in order to receive prompt attention; but must not be implemented prior to the review and approval by the NRC.

In our evaluation of your program, we identified possible deficiencies in the scope of the program. These are sunarized in Appendix D and E of the SE. Please review our position regarding these valves in our SE and either schedule these for inclusion into your testing program or provide justification for their omission from your program within 30 days of receipt of this letter. We have determined pursuant to 10 CFR 50.55a(g)(6)(i), that the granting of relief is authorized by law and will

V Mr. E. E. Utley

-2 not endanger life or property or the common defense and security and is otherwise in the public interest. In making this determination, we have given due consideration to the burden that could result if these requirements were imposed on your facility.

Our Safety Evaluation is enclosed for your information.

Sincerely, Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/enclosure:

See next page

  • SEE PREVIOUS WHITE FOR CONCURRENCES ORB#1:DL ORB#1:
  1. 1:DL %OELD AD/CSEB* MEB*

CParrish G eq RdBosnak Rothberg 9/25/85 11/9 5

10/3/85 10/28/85 10/28/85

-OR D:DL GL as HThompson HDon 11/5 1()/85

/85 D:PAD-2 ub stein 85

Mr. E. E. Utley Carolina Power & Light Company H. B. Robinson 2 cc:

G. F. Trowbridge, Esquire Mr. Dayne H. Brown, Chief Shaw, Pittman, Potts and Trowbridge Radiation Protection Branch 1800 M Street, N.W.

Division of Facility Services Washington, DC 20036 Department of Human Resources P.O. Box 12200 Mr. c~ue MorellChaimanRaliegh, North Carolina 27605 Mr. McCuen Morrell, Chairman Darlington County Board of Supervisors County Courthouse Darlington, South Carolina 29535 State Clearinghouse Division of Policy Development 116 West Jones Street Raleigh, North Carolina 27603 Attorney General Department of Justice Justice Building Raleigh, North Carolina 27602 U.S. Nuclear Regulatory Commission Resident Inspector's Office H. B.

Robinson Steam Electric Plant Route 5, Box 413 Hartsville, South Carolina 29550 Regional Administrator, Region II U.S. Nuclear Regulatory Commission

.Suite 2900 101 Marietta Street Atlanta, Georgia 30303 Mr. R.

Morgan General Manager H. B. Robinson Steam Electric Plant Post Office Box 790 Hartsville, South Carolina 295502