Text
Docket No. 50-261 November 21, 1985 D
ocket Fl-e-RDiggs R
OPA, CMiles Local PDR LHarmon Mr. E. E. Utley, Senior Executive Vice President ORB#1 Rdg EJordan Power Supply and Engineering & Construction HThompson BGrimes Carolina Power and Light Company CParrish JPartlow Post Office Box 1551 BRequa TBarnhart Raleigh, North Carolina 27602 OELD WJones SECY ACRS, 10
Dear Mr. Utley:
ORB#1 Gray File
SUBJECT:
SUPPLEMENTAL SAFETY EVALUATION FOR APPENDIX R TO 10 CFR PART 50, ITEMS III.G.3 AND III.L; ALTERNATE SAFE SHUTDOWN CAPABILITY - H. B. ROBINSON STEAM PLANT, UNIT 2 - TAC NO. 60106 Our letter dated August 8, 1984 issued a Safety Evaluation (SE) for Alternate Safe Shutdown Capability at H. B. Robinson. The SE contained an open item concerning spurious operation of the high-low pressure interface valves due to a postulated fire (hot short).
By letter dated June 18, 1985 you responded to this concern and provided supplemental information and clarifications to your February 6, 1984 submittal.
We have completed our review of your June 18, 1985 submittal.
Based on our review, contained in the enclosed Supplemental Safety Evaluation, we find that you have demonstrated the capability to achieve and maintain safe shutdown conditions at HBR-2 following a fire in all 25 fire zones. Our acceptance is based on the plants utilization of the alternate dedicated shutdown systems including pre-fire repairs.
We conclude, therefore, that the HBR-2 alternate/dedicated shutdown capability meets the requirements of Appendix R to 10 CFR 50, Sections III.G.3 and III.L. We, therefore, consider these items closed.
A copy of our Safety Evaluation is enclosed.
/s/SVarga Steven A. Varga, Chief Operating Reactors Branch #1 Division of Licensing
Enclosure:
Safety Evaluation ORB#1:D ORB#1:i B 1:DL CParrish\\
BRequ '
a 11/k /85 11/a /85 11
/85 8512060130 13511 2 1.
R ADOCK 25000261 F
Mr. E. E. Utley Carolina Power & Light Company H. B. Robinson 2 cc:
G. F. Trowbridge, Esquire Mr. Dayne H. Brown, Chief Shaw, Pittman, Potts and Trowbridge Radiation Protection Branch 1800 M Street, N.W.
Division of Facility Services Washington, DC 20036 Department of Human Resources P.90. Box 12200 Raliegh, North Carolina 27605 Mr. McCuen Morrell, Chairman Darlington County Board of Supervisors County Courthouse Darlington, South Carolina 29535 State Clearinghouse Division of Policy Development 116 West Jones Street Raleigh, North Carolina 27603 Attorney General Department of Justice Justice Building Raleigh, North Carolina 27602 U.S. Nuclear Regulatory Commission Resident Inspector's Office H. B. Robinson Steam Electric Plant Route 5, Box 413 Hartsville, South Carolina 29550 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30303 Mr. R. Morgan General Manager H. B. Robinson Steam Electric Plant Post Office Box 790 Hartsville, South Carolina 29550
- Hartvill, Suth aroina 955