Forwards Insp Rept 50-261/85-18 on 850511-0610.No Violation or Deviation Noted
ML14175B293
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/18/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML14175B294 List:
References
NUDOCS 8507100429
Download: ML14175B293 (1)


See also: IR 05000261/1985018

Text

JUN 18 1985

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

SUBJECT:

REPORT NO. 50-261( 8)

On May 11 - June 10,

1985,

NRC inspected activities authorized by NRC Operating

License No.

DPR-23 for your H. B. Robinson facility.

At the conclusion of the

inspection,

the findings were discussed with those members

of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas,

the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

. Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL SIGNED BY

DAVID M. VERRELLI

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-261/85-18

cc w/encl:

G. P. Beatty, Jr., Manager

Robinson Nuclear Project Department

R. E. Morgan, Plant General Manager

bcc w/encl:

NRC Resident Inspector

Document Control Desk

State of North Carolina

  • RII

RI

RII

A Wrn:dr

r

ickson

DVerrelli

6/1/85

6 / (l

6//?/85

8507100429 850618

PDR ADOCK 05000261