JUN 18 1985
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
SUBJECT:
REPORT NO. 50-261( 8)
On May 11 - June 10,
1985,
NRC inspected activities authorized by NRC Operating
License No.
DPR-23 for your H. B. Robinson facility.
At the conclusion of the
inspection,
the findings were discussed with those members
of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas,
the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
. Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL SIGNED BY
DAVID M. VERRELLI
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-261/85-18
cc w/encl:
G. P. Beatty, Jr., Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
bcc w/encl:
NRC Resident Inspector
Document Control Desk
State of North Carolina
- RII
RI
RII
A Wrn:dr
r
ickson
DVerrelli
6/1/85
6 / (l
6//?/85
8507100429 850618
PDR ADOCK 05000261