RE;
'JLIAT',51 INFORMATION DSRBTI-1SE (RIDS)
ACCESSION NBR:52Oll$02.43 DOCl.DATE:
32/01/11
-NOTARIZED: NO DOCKET I
F-ACIL..O-2b1 +..
3:, RD is ol ant, Unit, 2,, C'arolinl 1 Power~ an Lligh 030 0 0 26 1, AUTH.NA1E.
A.ur,*irR AFFILiIATIONa ZIMMERAMANS.
Cla~rob~ina Poe
&1 Light Co,.
R E C I P.N NAA E' RCPIE!Atr AFFILiIATION S UBJ E CT: F or w a rds oin e oive r s ize e ngi ne e ring f~l ow d i ag-ra m h ow in g s e i s ijct : ot nd a Pi e s o~f,a Lj x i i a ry f ee dw at er s vS.D i aqr a i n a Jv r te n-t I oiit t ed f r om 8 112 31.r es p o.n se t o G e ner ic, Lit r 8 1 Ape rt u re c a ird i s a v ai ab 1e i n P D R!
DISTRIBUTION CO0DE : A001S COPIES RECEI-VED:LnR EINCUA SIZE~1_j1 TITLE,: General' Distri-Duti:3n foir, after Issuance 0jf,
,eretingi License NOTES:
7<21 R EC IPIE NT Copi.EIS REC IP I E NT1 COPIES ID) COJDEV/AAEi L IT R E N C L I-D, CODE/M4MEi LTTR EJNCLi ACTION:
R B 4,1 3 C; 01, 13 13 INTERNALI: ELD
- 1.
0 1E 06 2
2 NRR/D'1F6 D-EiPiYOS 1
1 NRR/DL! DIR 1
1 1 0 INRR / DS I A 3; 1
1 EXTERNALI: ACRS 09 110 10 LPDR
'03 1
1 Nk RC POR.
- 02.
1 1
14$1C; 05, 1
1 TOTAL 1 N U I3ER OF COPIE76 REQJI1RED-:* L TT R 35 ENC L!
33,
CP&L Carolina Power & Light;Company January 11, 1982 File: NG-3514(R)
Serial No.:
NO-82-051 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Washington, D.C.
20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO.
DPR-23 ENCLOSURE FOR RESPONSE TO GENERIC LETTER NO. 81-14
Dear Mr. Eisenhut:
In our letter of December 31, 1981 responding to your Generic Letter 81-14, dated February 10, 1981, we indicated that an engineering flow diagram showing the seismic boundaries of the AFWS was enclosed with the letter. This diagram was inadvertently omitted from the original, which was forwarded to your office. The subject diagram is enclosed for your review.
Yours very truly, Manager Licensing & Permits DCW/lr (6819) cc:
W. J. Ross (w/o enclosure)
JAN 15 11' 8201180248 820111 PDR ADOCK 05000261 1P PDRJ 411 Fayetteville Street
- P. 0. Box 1551
- Raleigh, N. C. 27602
'Si F.'
Distribution: Central File,-
NRR R/F DSS R/F RJMattson JAN 0 5 1980 LVGossick L0 MEMORANDUM FOR Chairman Ahearne Iq
'Commissioner Gilisky Commissioner Kennedy Commissioner Hendrie.
-Commissioner Bradford FROM:
Lee V. Gossick Executive Direc or for Operations SUBJECT TMI ACTION PLAN PREREQUISITES FOR RESUMPTION OF LICENSING In response to the Secretary's memorandum of December 28 and the guidance of the Commission at the meeting on December 21, the TMI Action Plan Steering Group has developed a proposed definition of the actions that would be required to be taken before reactor licensing could be resumed. This memorandum provides that proposed definition and reports on an important initial step in that effort --
the identification of the specific licensing requirements for the near-term operating.license applications. This memorandum and its attached list of near-term OL requirements were presented to and discussed with the Directors of NRR, _IE, RES, and SD on January 4, and they have concurred.
The Executive Legal Director has no legal objections.
The licensing pause has been described previously, but not in the detail now needed. It was broadly defined by the Commission in its November-9, 1979 letter-I to Dr. Press in the Executive Office of the President. In providing its analysis and views of the recommendations of the President's Commission, the NRC said in that letter, in part, "NRC has decided that new plants will not be licensed until the required criteria have been developed. This approach assures that the NRC staff can give the necessary attention to implementation of the changes on operating plants.
NRC plans to proceed systematically in the following manner: (1) review and correlate the recommendations of the President's Commission, those of internal lessons learned groups, those of the Advisory Committee on Reactor Safeguards, the findings of NRC Special Inquiry (when available); the findings of ongoing Congressional investigations (when available),.and other inputs; (2) transform the recommendations in each subject area into a statement of goals (i e define the new or improved safety objectives to be accomplished in each area); (3) develop task action plans to transfor the goals into organizational or procedural changes as they apply to NRC'
.IL JBJPY4
2 or into regulatory requirements as they apply to licensees; (4) initiate implementation of the new regulatory requirements on operating plants; and (5) initiate implementation of the new regulatory requirements on plants under construction."
The "action plans" called for in the November 9 letter have now come to be known, as the draft TMI Action Plan (NUREG-0660). The desired format and content of.
the action plan in the context of the Commission's licensing pause were described' in Commissioner Hendrie's memorandum of November '16, as "...essentially a matrix C formed by listing the points in the November 9th paper, plus any. other actions-we think necessary along one axis and the various'classes of cases.along the other axis."
Table 1 of NUREG-0660 is the matrix of licensing and other actions developed by the staff in response to this guidance from the Commission.
The Action Plan contains what the staff presently believes constitutes the complete set of additional requirements and programs for NRC, for operating reactors, for operating license applicants, for reactors under construction, and for construction permit applicants. In.
its totality, the Action Plan will identify all actions considered to be necessary as a result of the accident at TMI. Some will be required to be finished before the resumption of licensing.
Others may be required to be undertaken before resumption of licensing. Still other, longer term actions may not be undertaken until well after licensing has been resumed. Adoption of the Plan describing all of these actions by the NRC would constitute "getting its house in order."
We do not believe that the.
isolated approval of any particular subset of action items -
for example, the licensing requirements that are applicable to near-term operating licenses is a sufficient condition to justify the resumption of licensing.
We believe that Commission consideration and approval of the Action Plan in its entirety is a necessary action. Approval of the plan would mean Commission endorsement that the total program defined in' the Plan constitutes the sufficient measures to be undertaken to permit resumption of licensing. This is important and necessary guidance for licensees, license applicants, the staff, and the hearing boards. In this connection, the form of the Commission approval of the Plan is an important subject that needs further consideration.
Some preliminary thoughts by ELD on this subject are attached.
There are several deficiencies in the present draft that render it inadequate for approval at this time. First, it is incomplete. Recognizing that the NRC Special Inquiry report may contain additional requirements not presently identi fied in the draft Action Plan and that there is staff review of the plan still ongoing, we are not recommending approval of the existing draft Action Plan.
Second, the plan as presently drafted is a mixture of policy objectives, program descriptions, and.specific licensing criteria. Some of this material is at a level of detail that is 'too specific for Commission approval (i.e.,it is at a level of detail more'appropriate for.staff action and interpretation).- We anticipate furnishing to the Commission another draft of the plan within about a month of issuance of the NRC Special Inquiry Report. It is our intent, that
3 it will correct these sorts of deficiencies. In addition, at that time, we expect to furnish an analysis of the resource and programmatic implications of the Plan, including the identification of necessary reprogramming, future budget requirements, and effect'on present programs,.
We recognize that thre are many action items in the present draft of the Plan that require clea re6 description fuller explanation of need, development of.
detailed criteria consideration 1of alternative approaches, and.the like, before final decisions on *them could be expected. 'We6plan, for the next draft to identify each ofthos actions and proposed schedule and method for obtaining Commission app We propose that those approvals can be granted to or subsequent' to 'Commission appovalof the Action Plan itself. Approval of the Plan will simply mean, in tie areas that the Commission agrees in principal with the indicated action but i.ntends to.treat them separately and on specific schedules and according'to'methods or procedures outlined in the Plan.. The balanc, of the action items in the.Plan will be sufficiently well described that Commission approval of the overall Plan will constitute specific approval of those items. Examples of the sort of detailed. requirements that can be decided by.Commission approval of the overall Plan are the specific near-term operating license requirements described below.
There are several subsets of requirements that could be extracted from the Plan for separate consideration and decision by the Commission. Consistent with our understanding of the Commission's request at the December 21 meeting, we have extracted those actions that are uniquely applicable to near-term operating licenses. We have'defined "near-term operating licenses, as those that would be issued before Joly 1980.
A longer time period 'would add,,subtract, or modify requirements. It is necessary to establish such a temporal definition because the subset of actions required to be accomplished by applicants before obtaining an OL differs depending on that definition. The set of requirements.for near-term OL applicants according to a July 1980 definition is'attached as.
A similar listing of requirements could be extracted for other classes of activities, such as the-set of short-term lessons learned already applied to
-operating reactors, the additional requirements for operating reactors beyond the short-term lessons learned, the actions required to be taken by holders of construction permits, and the internal actions required to be taken by the NRC that would define "putting our house in order."
It is our intent that an improved Table 1 in the next draft of NUREG-0660 will more clearly identify such subgroupings of all the actions contained in the Plan.
Besides tfie information discussed above, the Steering Group will be prepared at its meeting with the Commission on January 9 to discuss the status of ongoing work to revise the action plan generallyto identify the method being'used to :
identify resource :reprogramming cididates in the current NRC operating plan
4 and budget submissions, and to propose a method for obtaining feedback and ideas from reactor operators and others involved in the implementation of the TMI-related requirements.
e V Gossick Executive Director for Operations Enclosures
- 1.
Near-Term Operating License Requirements
- 2.
ELD Comments on Form of Commission Approval cc:
Office Directors Steering Group Members Task Managers
%k~tr AE
TMI ACTION PLAN NEAR-TERM OPERATING LICENSE REqUIREMENTS Requirement Already Approved When Applicable*
I.A.1.1 Shift Technical Advisor-.
Provide technical advisors with engineering expertise on each shift.
Yes FL I.A.1.2 Shift Supervisor Duties Minimize administrative duties.
Yes FL I.A.1.3 Shift Manning (1) SRO and RO in control room.
No FL (2) ;Administrative aide to shift supervisor on each shift.
No FL (3) Restrictions on use of overtime.
No FL I.B.1.1 Organization and Management Criteria Interoffice NRC review of licensee management to determine organizational and managerial capabilities, pending development of criteria.
No FL xFL = before fuel load FP = before full power 1
Requirement Already Aporoved When ADplicable I.B.3.1 Safety Engineering Group Licensee provide onsite safety engineering group to provide supplemental engineering review and support.
Interoffice NRC review of the adequacy of this group, pending development of formal criteria.
No FL'-.
I.B.3.4 Resident Inspector NRC resident inspector at each site for new OL.
No FL I.C.1.1 Analysis and Procedure Miodifications (1) Phase I - small break LOCA's.
Yes FL (2) Phase II - inadequate core cooling.
Yes FL I.C.1.2 Shift Relief and Turnover Procedures Plant procedures for shift and relief turnover.
Yes FL I.C.1.3 Shift Personnel Responsibilities Plant procedures specifying responsibilities of shift personnel for safe operation of the plant.
Yes FL 2
Requirement Alreadv Approved When Applicable I.C.1.4 Control Room Access Plant procedures for limiting access to the control room.
Yes FL I.C.2 Vendor Review of Procedures NSSS vendor review of licensee emergency procedures, low power test procedures, and power ascension procedures.
No FP I.C.3 Pilot Program for Review of Selected Emergency Procedures NRC conduct in-depth review of development and use of selected emergency procedures on NTOL plants.
No FP I.E.1 Licensee Operating Experience Evaluation Capability Onsite and offsite capability for evaluation of operating experiences at nuclear power plants.
Partial FL I.E.2 Licensee Dissemination of Operating Experiences Procedures that assure feedback of operating experiences to operators and other personnel.
No FL 3
Requirement Already Approved When Applicable I.G Training During Low Power Testing Conduct "hands on" training in selected plant evolutions and off-normal.events for shift personnel.
No FP ILB.1 Degraded Core -
Primary System Vent Provide design of.remotely operable high-point reactor coolant.system vents.
Yes FP II.B.2 Dearaded Core -
Shielding Provide design of additional shielding required to provide access to vital areas and protect safety equipment.
Yes FP II.B.3 Degraded Core -
Sampling Provide interim procedures and final system design for sampling and analyzing reactor coolant and containment atmosphere.
Yes FP II.B.4 Degraded Core -
Training (1) Establish training program for all operating personnel in the mitigation of severe core damage using existing equipment.
No FL (2) Complete initial training.
No FP 4
Requirement Already Approved When Applicable II.B.8 Degraded Core -
Rulemaking Issue notice of intent to conduct rulemaking on requirements for design features for accidents involving severely damaged cores.
No FP II.B.9 Interim Hydrogen Control Requirements for Small Containments Under development.
No FP II.C.1.1 Mini-IREP No FP II.C.1.8 Reliability Assurance Establish a reliability assurance program for engineered safety features systems.
No FP 1I.D.1.1 Relief and Safety Valve Test Commit to performance testing of RCS relief and safety valves under the full range of normal and accident conditions by July 1981.
Yes FL II.D.1.5 Relief and Safety Valve Position Install direct indication of relief and safety valve pcsition.
Yes FL 5
Recuirement A rd.
Approved When Appl icable II.E.1 Auxiliary Feedwater System Reliability Perform simplified reliability analysis of AFW system and modify as necessary.
No FP II.E.1.3 Auxiliary Feedwater Initiation Install safety grade automatic start of AFW and safety grade flow indicators.
Yes FP II.E.3 Emergency Power for Decay Heat Removal Install capability to supply some pressurizer heaters and controls from emergency power supply and implement necessary training and.
procedures.
Yes FP II:E.4.1 Containment Penetrations Provide design of redundant dedicated containment penetrations for external hydrogen recombiner, if applicable.
Yes FL II.E.4.3 Containment Isolation Install diverse containment isolation signal.
Yes FP II.E.4.5 Containment Purge Restrict containient purge operation and demonstrate purge valve operability.
Yes FP 6
Requirement Already Approved When Applicable II.F.2 Inadequate Core Cooling Instruments (1) Install subcooling meter.
Yes FL (2) Submit design of vessel level indicator.
Yes FL II.G Emergency Power for Pressurizer Equipment Modify power supplies for the pressurizer relief valves, block valves, and level indicators to be from emergency power sources.
Yes FL III.A.1.1 Role of NRC More detailed definition of role of NRC in emergencies than presently contained in Action Plan.
No FP III.A.1.5 Communications Install two direct dedicated telephone lines between plant and NRC.
Yes FL III.A.2.1 Technical Support Center Establish initial onsite TSC and provide plans, procedures, staffing, communications, and radiation monitoring equipment.
(Upgrade on same schedule as present OR's.)
Yes FL 7
Reouirement Already Approved When Applicable III.A.2.2 Onsite Operational Support Center Establish an OCS as described in the 10/30/79 letter to licensees.
(Upgrade on same schedule as present OR's.)
Yes FL III.A.2.3 Near-Site Emergency Operations Center Establish an EOC as a base for coordinating onsite and offsite activities and interface with State, local, and Federal agencies.
(Upgrade on same schedule as present OR's.)
Yes FL III.A.3 Upgrade Licensee Emergency Preparedness Upgrade emergency plans in accordance with Regulatory Guide 1.101 and NUREG-0610.
Yes FL III.B.3.2 FEMA-NRC Concurrence in State and Local RERP Concurrence must be obtained.
Yes FL III.D.1.3.a Area Radiation Monitors (Partial)
Provide instrumentation to determine in-plant airborne radioiodine concentrations.
Yes FL 8
Requirement Already Approved When Aoplicable III.D.2.1 Control Room Habitability Confirm compliance with existing regulatory requirements or establish schedule for necessary modifications to achieve compliance.
No FP III.D.2.2.b Evaluation of Secondary Side Hazards Evaluate secondary side leakage and radiological hazards which could result from major accident, and make modifications to reduce hazards.
Yes FP III.D.2.2.c Improve Auxiliary Building Identify improvements to control radioactive leakage from auxiliary buildings, including requirements for building exhaust filtration.
where it doesn't already exist, and provide schedule for modifications.
No FP III.E.1.1 Improved Vent Gas Systems Review vent gas and leak detection systems against new design criteria and provide schedule for modifications.
No FP 9
Requirement Already Approved When Applicable III.E.1.2.a Surveillance Testing (Filtration Systems) (Partial)
Implement surveillance testing program for non-ESF filtration systems.
No FP III.E.2.1.b NRC Monitoring NRC establish TLD surveillance network around site.
Yes FL 10
'January 5, 1980 MEMORANDUM FOR:
Roger Mattson FROM:
Guy Cunningham
SUBJECT:
TMI ACTION PLAN --
PREREQUISITES FOR RESUMPTION OF LICENSING At their meeting on January.4, the office directors were unanimously agreed-.
that Commission approval of the recommendations of this paper should be obtained before their full implementation.
There was disagreement, however, as to whether that approval should be in the form of a general statement of policy or one or more rules (made immediately effective as appropriate).
OELD believes that the difference between the approaches should be highlighted and the consequences of the choice made clear.
A good discussion of this subject is presented in Pacific Gas and Electric Co. v. FPC (D.C.
Cir. 1974) 506 F.2d 33.
In part, the Court said:
The critical distinction between a substantive rule and a general statement of policy is the different practical effect that these two types of pronounce ments have in subsequent administrative proceedings.
A properly adopted substantive rule establishes a standard of conduct which has the force of law. In subsequent administrative proceedings involving a substantive rule, the issues are whether the adjudicated facts conform to the rule and whether the rule should be waived or applied in that particular instance. The underlying policy embodied in the rule is not generally subject to challenge before the agency.
A general statement of policy, on the other hand, does not establish a "binding norm."
It-is not finally determinative of the issues or rights to which it is addressed. The agency cannot apply or rely upon a general statement of policy as law because a general statement of policy only announces what the agency seeks to establish as policy. A policy statement announces the agency's tentative intentions for the future.
When the agency applies the policy in a particular situation, it must be prepared to support the policy just as if the policy statement had never been issued.
An agency cannot escape its responsibility to present evidence and reasoning supporting its substantive rules by announcing binding precedent in the.
form of a general statement of policy.
(Citations and footnotes omitted.)
In the present situation, utilization of a policy statement to announce the agency's intention to require implemientation of the recommandations of this paper will mean that the proposed requirement will be a proper subject for litigation in every contested case before the issuance of any permit or license.
OELD believes that immediately effective rules can be promulgated in the same
2 period of time as a general statement of policy. Moreover, to the extent that the rules are merely "interpretive" of present regulations, they may. be promul gated, as may a general statement of policy, without following APA rulemaking procedures.
uy H. Cunningham,-I-H' Chief Regulations Counsel, OELD