ML14191B081
| ML14191B081 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 02/14/1989 |
| From: | Julian C NRC/IE, NRC/RGN-II |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML14191B082 | List: |
| References | |
| NUDOCS 8902280036 | |
| Download: ML14191B081 (3) | |
See also: IR 05000261/1989002
Text
ACCELERATE)
DISTRIBUTION
DEMONSTRATION
SYSTE
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
f
ESSION NBR:8902280036
DOC.DATE: 89/02/14 NOTARIZED: NO
DOCKET #
'ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
JULIAN,C.A.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/89-02 on 890109-13 & notice of
R
violation.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL _j SIZE:
/
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
S
RECIPIENT
COPIES
RECIPIENT
COPIES
/
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
1
1
K
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
f
DEDRO
1
1
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
OE1PEBERMANJ
1
1
OGC/HDS1
1
1
- REGFILE
02
1
1
RGN2
FILE
01
1
1
0
W
ERNAL: LPDR
1
1
NRC PDR
1
1
1
1
R
D
A
D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US To REDUCE WASTE!
ONTACT THE DCJMD
T CONTRL DESK,
ROOM P1-37 (EXT.
20079) TO ELDMATE YOUR NAME FRC
DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
23
ENCL
23
FEB 14 1988 9ij
Docket No. 50-261
License No.
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC
27602
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-261/89-02)
This refers to the Nuclear Regulatory Commission (NRC)
inspection conducted by
N. Economos on January 9 - 13,
1989.
The inspection included a review of
activities authorized for your H. B. Robinson facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel,
and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violation, references to pertinent requirements,
and
elements to be included in your response are described in the enclosed Notice
of Violation.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosure are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Caudle . Julian, Chief
Engineering Branch
Division of Reactor Safety
0
00
L 4:
Q
FEB 14 1989
Carolina Power and Light Company
2
Enclosure:
cc w/encl:
C. R. Dietz, Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encl:
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
Nco omosda
ake
HCDance
02/?/89
10/89
02/i /89