ML14191B071
| ML14191B071 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 01/24/1989 |
| From: | Ernst M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14191B072 | List: |
| References | |
| NUDOCS 8902030086 | |
| Download: ML14191B071 (3) | |
See also: IR 05000261/1988036
Text
.
ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
W ESSION NBR:8902030086
DOC.DATE: 89/01/24 NOTARIZED: NO
DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
ERNST,M.L.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
R
SUBJECT: Forwards Insp Rept 50-261/88-36 on 881219-22.Violations
noted.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL
SIZE:
2 7
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
S
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
1
1
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
DEDRO
1
1
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
NRR/DLPQ/PEB 11
1
1
D
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
-1
1
NRR/DREP/RPB 10
2
2
S
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
OE LIEBERMAN,J
1
1
OGC/HDS1
1
1
]g
02
1
1
RGN2
FILE
01
1
1
EXTERNAL: LPDR
1
1
NRC PDR
1
1
1
1
R
I
S
A
D
D
NOIE TO ALL "RIS" RECIPIENTS:
S
PLEASE HELP US TO REDUCE
STE!
ONTACr THE DOCUME
ONTIROL DESK,
ROOM P1-37 (EXT. 20079) TO ELIMInaTE YOUR NAME FROM DISTRIBTMICN
LISTS FOR DOCUMEN
YOU DONT NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
23
ENCL
23
JAN 2 41989
i()
Docket No. 50-261
License No. DPR-23
arolina Power and Light Company
ATTN: Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/88-36
This refers to the Nuclear Regulatory Commission (NRC)
inspection conducted by
N. Merriweather on December 19 - 22, 1988. The inspection included a review of
activities authorized for your H. B. Robinson facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel,
and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violations described in the enclosed Inspection Report
are under consideration for escalated enforcement action.
Accordingly, no
Notice of Violation is being issued at this time, and no response to this
letter is required. However, please be advised that the number and characteri
zation of violations described in the enclosed Inspection Report may change as
a result of further NRC review.
An Enforcement Conference to discuss these
violations has been scheduled for February 9, 1989.
You will be advised by
separate correspondence of the results of our deliberations on this matter.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Malcolm L. Ernst
Acting Regional Administrator
Enclosure: (See page 2)
899 C)
24
c
PDR vZ~~cK 0500)026 1
JAN 2 4199
Carolina Power and Light Company
2
Enclosure:
NRC Inspection Report
cc w/encl:
. R. Dietz, Manager
Robinson Nuclear Project Department
A1. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encl:
%.NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
LJU. Potapovs, NRR
RI r
RII
RII
'
RII
NMerriweather:sda