ML14191B037
| ML14191B037 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 12/20/1988 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML14191B039 | List: |
| References | |
| NUDOCS 8901050053 | |
| Download: ML14191B037 (3) | |
See also: IR 05000261/1988034
Text
ACCELERATED
DISTPJBUTION
DEMONSTRATION
SYFTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SSION NBR:8901050053
DOC.DATE: 88/12/20
NOTARIZED: NO
DOCKET #
0
CIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
VERRELLI,D.M.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/88-34 on 881111-1210.No violations
or deviations noted.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR L ENCL
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Vi lation Response
NOTES:
S
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
1
1
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
D
DEDRO
1
1
NRR SHANKMAN,S
1
1
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
OE LI-E.BE
N,J
1
1
OGC/HDS1
1
1
LE
02
1
1
RGN2
FILE 01
1
1
AL: LPDR
1
1.
NRC PDR
1
1
1
1
RESL MARTIN,D
1
1
D
D
NOrE TO ALL "RIDS" RECIPIENTS:
PLEASE 1ELP US TO RExC WASTE! CONTACT THE DOCUMENT ONTROL DESK,
CROOM
Pl-37 (EXT.
20079) To ELIMINATE YOUR NAME FROM DSITN
LISTS FOR DOCUMNS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
23
ENCL
23
December 20, 1988
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN: Mr. E. E. Utley
Senior Executive Vice President
Power.Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/88-34
This refers to the Nuclear Regulatory Commission (NRC)
inspection conducted by
L. W. Garner on November 11 - December 10,
1988.
The inspection included a
review of activities authorized for your H. B. Robinson facility.
At the
conclusion of .the inspection, the findings were discussed with those members
of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of .procedures
and representative records,
interviews with personnel,
and observation of
activities in progress.
Within the scope of the inspection,
no violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original Signed by
David M. Verrelli
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure: (See page 2)
FER
05000-26::~)
. ~1
F,
El
Carolina Power and Light Company
2
December 20, 1988
Enclosure:
NRC Inspection Report
cc w/encl:
C. R. Dietz, Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encl:
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
RII
RII
R r ol:er
PFredrickson
12/1/88
12/1/88