ML14191B030
| ML14191B030 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 12/09/1988 |
| From: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14191B031 | List: |
| References | |
| NUDOCS 8812200337 | |
| Download: ML14191B030 (3) | |
See also: IR 05000261/1988030
Text
ACCELERATED
D T
UTION
DEMONSTRAT N
SYSITEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SSION NBR:8812200337
DOC.DATE: 88/12/09 NOTARIZED: NO
DOCKET #
IL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
UTH.NAME
AUTHOR AFFILIATION
REYES,L.A.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/88-30 on 881011-1110.No violations
or deviations noted.
,
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL
SIZE: 4 +
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
S
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
1
1
INTERNAL: AEOD
1
-1
DEDRO
1
1
D
NRR SHANKMAN,S
1
1
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
1
RRR/DOEA DIR 11
1
1
D
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
OELIEBERMAN,J
1
1
OGC/HDS1 ,
1
1
E
FILE
02
1
1
RGN2
FILE
01
1
1
AL: LPDR
1
1
NRC PDR
1
1
1
1
RESL-MARTIN,D
1
1
A
D
D
NOT
TO ALL "RIDS" RECIPIENTS:
S
~PLEASE
=EL US TO REDUCE WASTE! CONTACT THE DOCUMENT ONTROL DESK,
ROOM P1-37 (EXT. 20079) TO ELIMNAT
YOUJR
AM FRI DISTRIBUTON
LIST
FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REOUIRED:
LTTR
22
ENCL
22
Docket No:
50-261
License No:
,8arolina Power -and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC
27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/88-30
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
L. W. Garner on October 11 -
November 10,
1988.
The inspection. included a
review of activities authorized for your H. B. Robinson facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and re resentative records.,
interviews with personnel,
and observation of
activities in progress.
Within the scope of the inspection,
no violations or deviations were
identified.
As discussed during the exit interview, and described in detail in paragraph
7.a. of the enclosed inspection report, we have a concern over the weakness
your staff exhibited in identifying the applicability of containment isolation
valve Technical Specification 3.6.3 when motor control center MCC-6
was
declared inoperable. You are therefore requested, within thirty days of the
date of this letter, to inform us of the actions you have taken or plan to
take in order to improve your Operation Department's review for applicable
Technical Specification action statements upon determination of inoperable
equipment.
Your attention is invited to the unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's "Rules.of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
3812200:337 @:81209
P'DR
ADO
C000 26.1
F(C1
Carolina Power and Light Company
2
DEC 9 d8
.
The responses directed by this letter and its enclosures!are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Luis A. Reyes, Director
Division of Reactor Projects
Enclosure:
NRC Inspection Report
c w/encl:
. R. Dietz, Manager
Robinson Nuclear Project Department
hA. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encl:
W.-RC Resident Inspector
DRS Technical Assistant
Document Control Desk
RI
RII
RI
BCarroll:tm
PF edrickson
DVerr
lli
BHe
12/S/88
12/(7 /88
12/
/88
12/
/88