ML14191B013
| ML14191B013 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 10/13/1988 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML14191B014 | List: |
| References | |
| NUDOCS 8810250455 | |
| Download: ML14191B013 (3) | |
See also: IR 05000261/1988023
Text
- AC C]ELE RATRULP
ON DI
tP~INT~
( R IDS ~EM
ACCESSION NBR:8810250455
DOC.DATE: 88/10/13 NOTARIZED: NO
DOCKET #
,O
CIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
UTH.NAME
AUTHOR AFFILIATION
RRELLI,D.M.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEYE.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/88-23 on 880811-0910.No violations
or deviations noted.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ( ENCL _
SIZE:.tj p
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
1
1
INTERNAL: AEOD
1
1
DEDRO
1
1
NRR MORISSEAU,D
1
1
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2 .
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
OE-LIEBERMAN,J.
1
1
c
OGC/HDS1
1
1
RE
FI
02
1
1
RES/DSR DEPY
1
1
RCN2
FILE
01
1
1
RNAL:
LPDR
1
1
NRC PDR
1
1
1
1
RESL MARTIN,D
1
1
I
S
A
TOTAL NUMBER OF COPIES REQUIRED: LTTR
23
ENCL.
23
OCT 131988
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
agTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC
27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/88-23
This refers to the Nuclear Regulatory Commission (NRC)
inspection conducted
by L. W. Garner on August 11 -
September 10,
1988.
The inspection included
a review of activities authorized for your H. B. Robinson facility.
At the
conclusion of the inspection, the findings.were discussed with those members
of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records,
interviews with personnel,
and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
OPIGINAL SIGNED bY
DAVID M. VERRELU
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/encl:
(See page 2)
8810250455 881013
ADOCK 05000261
0
PNU
Carolina Power and Light Company
2
OT1
cc w/encl:
R. Dietz, Manager
Robinson Nuclear Project Department
J-R E. Morgan, Plant General Manager
State of South Carolina
bcc w/encl:
L.RC Resident Inspector
.DRS, Technical Assistant
Document Control Desk
RH
RH
PFre ric on:ac
DMVerelli
10/
/88
10/11.8