Text
AC CEELEFUAT
ULAP
?~A1M09A DI
RID
STEM
ACCESSION NBR:8809140335
DOC.DATE: 88/08/31 NOTARIZED: NO
DOCKET #
ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
ERDT,A.R.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/88-21 on 880801-05.No violations
or deviations noted.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL
SIZE: __+50_
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
2
2
INTERNAL: AEOD
1
1
DEDRO
1
1
NRR MORISSEAU,D
1
1
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
OEL-IBEBERMIAN,J
1
1
OGC/HDS1
1
1
EG FILE=;4 02
1
1
RES/DSIR DEPY
1
1
FILE
01
1
1
ERNAL: LPDR
1
1
NRC PDR
1
1
1
1
TBII2
TOTAL NUMBER OF COPIES REQUIRED: LTTR
23
ENCL
23
AUG 311988
/
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/88-21
This refers. to the Nuclear Regulatory Commission (NRC) inspection conducted
by R. P. Carrion on August 1-5,
1988.
The inspection included a review of
activities authorized for your H. B. Robinson facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
.
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel,
and observation of
activities in progress.
Within the scope of the inspection,
no violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Alan R. Herdt, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
NRC Inspection Report
cc:
(See page 2)
6809140335 860831
ADOCK 05000261
(3
PNIJ
AUG03 11988
Carolina Power and Light Company
2
cc w/encl:
G. P. Beatty, Jr., Vice President
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
bcc w/encl:
NRC Resident Inspector
DRS, Technical Assistant
Document Control Desk
State of South Carolina
RHI
J
rion
J
-re dr ickson
- /88
0
/88
08/1V88