ML14191A988
| ML14191A988 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 08/29/1988 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML14191A989 | List: |
| References | |
| NUDOCS 8809130229 | |
| Download: ML14191A988 (3) | |
See also: IR 05000261/1988019
Text
ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8809130229
DOC.DATE: 88/08/29 NOTARIZED: NO
DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
VERRELLI,D.M.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/88-19 on 880711-0810.No violations
or deviations noted.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR I ENCL
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Rbsponse
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
2
2
INTERNAL:
1
1
DEDRO
1
1
NRR MORISSEAU,D
1
1
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
-I-
,J
1
1
OGC/HDS1
1
1
I
02
1
1
RES/DSIR DEPY
1
1
RGN2
FILE
01
1
1
EW
AL: LPDR
1
1
NRC PDR
1
1
W
1
1
TBII2
TOTA
NUBER
F CPIE
REOIRE: LTR
2
ENL
2
Docket No:
50-261
License No:
COolina Power and Light Company
TTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NO. 50-261/88-19
This refers to-the Nuclear Regulatory Commission (NRC) inspection conducted by
L. W. Garner on July 11 - August 10, 1988. The inspection included a review of
activities authorized for your H. B. Robinson facility.
At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records,
interviews with personnel,
and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were identi
fied.
In Accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/encl:
(See page 2)
0 ,00201
priR.~
TZc e;
Carolina Power and Light Company
4
cc w/encl:
4 R. Dietz, Manager
Robinson Nuclear Project Department
R'. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encl:
L.REC Resident Inspector
DRS, Technical Assistant
Document Control Desk
.
RI
RI
BCirroll:ser
PFredrickson
08/88
08/97/88