Forwards Insp Rept 50-261/88-19 on 880711-0810.No Violations or Deviations Noted
ML14191A988
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 08/29/1988
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML14191A989 List:
References
NUDOCS 8809130229
Download: ML14191A988 (3)


See also: IR 05000261/1988019

Text

ACCELERATED

DISTRIBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8809130229

DOC.DATE: 88/08/29 NOTARIZED: NO

DOCKET #

FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261

AUTH.NAME

AUTHOR AFFILIATION

VERRELLI,D.M.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina Power & Light Co.

SUBJECT: Forwards Insp Rept 50-261/88-19 on 880711-0810.No violations

or deviations noted.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR I ENCL

SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Rbsponse

NOTES:

RECIPIENT

COPIES

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-1 PD

1

1

LO,R

2

2

INTERNAL:

AEOD

1

1

DEDRO

1

1

NRR MORISSEAU,D

1

1

NRR/DLPQ/PEB 11

1

1

NRR/DLPQ/QAB 10

1

1

NRR/DOEA DIR 11

1

1

NRR/DREP/EPB 10

1

1

NRR/DREP/RPB 10

2

2

NRR/DRIS DIR 9A

1

1

NRR/PMAS/ILRB12

1

1

NUDOCS-ABSTRACT

1

1

OE

-I-

,J

1

1

OGC/HDS1

1

1

I

02

1

1

RES/DSIR DEPY

1

1

RGN2

FILE

01

1

1

EW

AL: LPDR

1

1

NRC PDR

1

1

W

NSIC

1

1

TBII2

TOTA

NUBER

F CPIE

REOIRE: LTR

2

ENL

2

Docket No:

50-261

License No:

DPR-23

COolina Power and Light Company

TTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-261/88-19

This refers to-the Nuclear Regulatory Commission (NRC) inspection conducted by

L. W. Garner on July 11 - August 10, 1988. The inspection included a review of

activities authorized for your H. B. Robinson facility.

At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records,

interviews with personnel,

and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were identi

fied.

In Accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/encl:

(See page 2)

0 ,00201

priR.~

FD

TZc e;

Carolina Power and Light Company

4

cc w/encl:

4 R. Dietz, Manager

Robinson Nuclear Project Department

R'. E. Morgan, Plant General Manager

State of South Carolina

bcc w/encl:

L.REC Resident Inspector

DRS, Technical Assistant

Document Control Desk

.

RI

RI

BCirroll:ser

PFredrickson

08/88

08/97/88