Forwards Insp Rept 50-261/89-03 on 890111-0210 & Notice of Violation
ML14191A975
Person / Time
Site: Robinson 
Issue date: 03/10/1989
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML14191A976 List:
References
NUDOCS 8903300236
Download: ML14191A975 (3)


See also: IR 05000261/1989003

Text

ACCELERATED

ISTRIBWITUN

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8903300236

DOC.DATE: 89/03/10 NOTARIZED: NO

DOCKET #

FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261

AUTH;NAME

AUTHOR AFFILIATION

RRELLI,D.M.

Region 2, Ofc of the Director

ECIP.NAME

RECIPIENT AFFILIATION

TLEY,E.E.

Carolina Power & Light Co.

SUBJECT: Forwards Insp Rept 50-261/89-03 on 890111-0210 & notice of

violations.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR 4 ENCL

SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

COPIES

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-1.PD

1

1

LO,R

1

1

INTERNAL: AEOD

1

1

AEOD/DEIIB

1

1

DEDRO

1

1

NRR SHANKMAN,S

1

1

NRR/DEST DIR

1

1

NRR/DLPQ/PEB 11

1

1

NRR/DLPQ/QAB 10

1

1

NRR/DOEA DIR 11

1

1

NRR/DREP/EPB 10

1

1

NRR/DREP/RPB 10

2

2.

NRR/DRIS DIR 9A

1

1

NRR/PMAS/ILRB12

1

1

NUDOCS-ABSTRACT

1

1

OE LIEBERMAN,J

1

1

OGC/HDS1

1

1

I

02

1

1

RGN2

FILE 01

1

1

RNAL: LPDR

1

1

NRC PDR

1

1

NSIC

1

1

A

S

NOTE 'ID ALL "RIES" RECIPIEIS:

$

PLEASE HELP US TO REDE WASTE!

CONTACT THE DOCUMENT (NIROL

DESK,

ROOM P1-37 (EXT. 20079) '0 ELIMATE YOUR NAME FID

DISTRIBUTIC

LISTS FOR DDCUENtS YOU DC'T NE!

TOTAL NUMBER OF COPIES REQUIRED: LTTR

23

ENCL

23

Docket No:

50-261

License No:

DPR-23

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC

27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-261/89-03)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

L. W. Garner on January 11 -

February 10,

1989.

The. inspection included a.

review of activities authorized for your H. B. Robinson facility.

At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations.of procedures

and representative records,

interviews with personnel,

and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. The violatioh, references to pertinent requirements,

and

elements to be included in your response are described in the enclosed Notice

of Violation.

In Accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

9011

p..

Carolina Power and Light Company

2

l

jo '1989

Should you have any questions concerning this letter, please contact us.

Sincerely,

DAVD

M.

V

LLI

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2.

NRC Inspection.Report

cc w/encls:

C. R. Dietz, Manager

Robinson Nuclear Project Department

R. E. Morgan, Plant General Manager

State of North Carolina

bcc w/encls:

NRC Resident Inspector

DRS Technical Assistant

Document Control Desk

R H

RHI

RCarroll:tm

HDance

03/j0 /89

03/1' /89