ML14191A975
| ML14191A975 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 03/10/1989 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML14191A976 | List: |
| References | |
| NUDOCS 8903300236 | |
| Download: ML14191A975 (3) | |
See also: IR 05000261/1989003
Text
ACCELERATED
ISTRIBWITUN
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8903300236
DOC.DATE: 89/03/10 NOTARIZED: NO
DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH;NAME
AUTHOR AFFILIATION
RRELLI,D.M.
Region 2, Ofc of the Director
ECIP.NAME
RECIPIENT AFFILIATION
TLEY,E.E.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/89-03 on 890111-0210 & notice of
violations.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR 4 ENCL
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1.PD
1
1
LO,R
1
1
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
DEDRO
1
1
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
NRR/DLPQ/PEB 11
1
1
NRR/DLPQ/QAB 10
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2.
NRR/DRIS DIR 9A
1
1
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
OE LIEBERMAN,J
1
1
OGC/HDS1
1
1
I
02
1
1
RGN2
FILE 01
1
1
RNAL: LPDR
1
1
NRC PDR
1
1
1
1
A
S
NOTE 'ID ALL "RIES" RECIPIEIS:
$
PLEASE HELP US TO REDE WASTE!
CONTACT THE DOCUMENT (NIROL
DESK,
ROOM P1-37 (EXT. 20079) '0 ELIMATE YOUR NAME FID
DISTRIBUTIC
LISTS FOR DDCUENtS YOU DC'T NE!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
23
ENCL
23
Docket No:
50-261
License No:
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC
27602
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-261/89-03)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
L. W. Garner on January 11 -
February 10,
1989.
The. inspection included a.
review of activities authorized for your H. B. Robinson facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations.of procedures
and representative records,
interviews with personnel,
and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements. The violatioh, references to pertinent requirements,
and
elements to be included in your response are described in the enclosed Notice
of Violation.
In Accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
9011
p..
Carolina Power and Light Company
2
l
jo '1989
Should you have any questions concerning this letter, please contact us.
Sincerely,
DAVD
M.
V
LLI
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosures:
2.
NRC Inspection.Report
cc w/encls:
C. R. Dietz, Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
State of North Carolina
bcc w/encls:
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
R H
RHI
RCarroll:tm
HDance
03/j0 /89
03/1' /89