Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/88-10. Commitment to Test Reheat & Intercept Valve Solenoids While off-line at Refueling Intervals Acceptable
ML14191A969
Person / Time
Site: Robinson 
Issue date: 08/08/1988
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
References
NUDOCS 8808230402
Download: ML14191A969 (2)


See also: IR 05000261/1988010

Text

AC CELERATIGULA

O72TN DI

1

4

(RID STEM

ACCESSION NBR:8808230402

DOC.DATE: 88/08/08

NOTARIZED: NO

DOCKET #

ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261

UTH.NAME

AUTHOR AFFILIATION

RRELLI,D.M.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina Power & Light Co.

SUBJECT: Info obtained on monthly testing requiremments of Tech Spec 4.1.1,concerning components to be tested for power operation

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR /

ENCL

SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

COPIES

RECIPIENT

COPIES

S

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-1 PD

1

LO,R

2

INTERNAL: AEOD

1

DEDRO

1

A

NRR MORISSEAU,D

1

NRR/DLPQ/PEB 11

1

D

NRR/DLPQ/QAB 10

1

NRR/DOEA DIR 11.

1

NRR/DREP/EPB 10

1

NRR/DREP/RPB 10

2

NRR/DRIS DIR 9A

1

NRR/PMAS/ILRB12

1

NUDOCS-ABSTRACT

1

OE L.IEBERMAN,J

1

S

OGC/HDS1

1

REGFIL )

02

1

RES/DSIR DEPY

1

RGN2

FILE

01

1

RNAL: LPDR

1

NRC PDR

1

NSIC

1

R

I

D

S

A

D

D

TOTAL NUMBER OF COPIES REQUIRED: LTTR

23

ENCL

f

Carolina Power and Light Company

.AfTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: REPORT NO 50-261/88-10

Thank you for your response of July 20, 1988, to our Notice of Violation issued

on June 23,

1988,

concerning activities conducted at your H. B. Robinson

facility.

We have evaluated your response and, in light of the subsequent

information obtained, we are in agreement that the monthly testing requirements

of Technical Specification (TS)

4.1.1, Table 4.1-1, item 28 applies only to

those components which are designed to be tested during power operation and

does not include the reheat and intercept valve solenoids. Accordingly, your

commitment to test the reheat and intercept valve solenoids while off-line at

refueling intervals is acceptable.

Based

on telephone conversation between J. Curley of your staff and

P. Fredrickson of this office on August 5, 1988, it is our understanding that

you are presently conducting a review to determine if similar testing inadequa

cies exist for other TS related equipment. It was mutually agreed, that you

will submit a supplemental response by September 15,

1988, addressing the

results of this review and any additional corrective actions that may be

warranted.

We appreciate your cooperation in this matter.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

cc: X4. P. Beatty, Jr., Vice President

Robinson Nuclear Project Department

'C

E. Morgan, Plant General Manager

bcc: ORC Resident Inspector

DRS, Technical Assistant

Document Control Desk

State of South Carolina

606230402 880800

DR ADOCI(

05000261 1 :

RII

P

RII iy

N

RCarroll

PFr rickson

08/f/88

08/ /88