July 26, 1988
Docket No:
50-261
License No:
Cayolina.Power and Light Company
AITN: Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/88-16
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
L. W. Garner on June 10 - July 10, 1988. The inspection included a review of
activities authorized for your H. B. Robinson facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records,
interviews with personnel,
and observation of
activities in progress.
Within the scope of the inspection,
a second example of violation
50-261/88-07-01,
involving declaration and notification of an unusual event,
was identified. Because the associated event was addressed in your response to
violation 50-261/88-07-01,
no Notice of Violation is being issued.
However,
you are reminded that a supplement to that response was formally requested and
is due no later than August 12, 1988.
Your attention is invited to an unresolved item identified in the inspection
report. This matter will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
8808100091 880726
ADOCK 05000261
G
PNU
/
~~7F~0
Carolina Power and Light Company
2
July 26, 1988
Should you have any questions concerning this letter,.please contact us.
Sincerely,
Original Signed by
David M. Verrelli
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cpw/encl:
.P. Beatty, Jr., Vice President
Robinson Nuclear Project Department
E. Morgan, Plant General Manager
bcc w/encl:
Document Control Desk
State of South Carolina
S R, Technical Assistant
C Resident Inspector
RHI
RHI
RC
tro1:tj
PFredrickson
07/6/88
07->k/88