ML14191A930

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/88-07 on 880411-0510 & Notice of Violation
ML14191A930
Person / Time
Site: Robinson 
Issue date: 05/25/1988
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML14191A931 List:
References
NUDOCS 8806070260
Download: ML14191A930 (2)


See also: IR 05000261/1988007

Text

MAY 2 5 1988

Docket No. 50-261

License No. DPR-23

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-261/88-07)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

L. W. Garner on April 11 -

May 10,

1988.

The inspection included a review of

activities authorized for your H. B. Robinson facility.

At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

O Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records,

interviews with personnel,

and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. The violation, references to pertinent requirements,

and

elements to be included in your response are described in the enclosed Notice

of Violation.

In Accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

OrUGINA!. S!CNU)

By

B5AVIB M.

ERL

David M. Verrelli, Chief

Reactor Projects Branch 1

r

(Division

of Reactor Projects

Enclosures:

(See page 2)

8806070260 880525

PDR ADOCK 05000261

0

DCD

Carolina Power and Light Company

2

MAY

1o88

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encls:

G. P. Beatty, Jr., Vice President

Robinson Nuclear Project Department

R. E. Morgan, Plant General Manager

bcc w/encls:

NRC Resident Inspector

DRS, Technical Assistant

Document Control Desk

State of South Carolina

RII

PFre

ckson:lb

05/

88