ML14188B575
| ML14188B575 | |
| Person / Time | |
|---|---|
| Site: | Harris, Robinson, 05000000 |
| Issue date: | 12/02/1988 |
| From: | Murley T Office of Nuclear Reactor Regulation |
| To: | Shawn Smith CAROLINA POWER & LIGHT CO. |
| References | |
| GL-87-12, GL-88-17, NUDOCS 8812070132 | |
| Download: ML14188B575 (3) | |
Text
DEC iti 2 198?
Docket Nos. 50-261 DISTRIBUTION and 50-400 Docket File E. Adensam NRC PDR P. Anderson Mr. Sherwood H. Smith, Jr.
LocalDR E. Reeves (2)
Chief Executive Officer PD21 r/f OGC Carolina Power & Light Company TMurley/JSniezek (12G18) E. Jordan (MNBB 3302)
Post Office Box 1551 D. Crutchfield (12G18)
B. Grimes (9A2)
Raleigh, North Carolina 27602 S. Varga (14E4)
ACRS (10)
G. Lainas C. Trammell (13E16)
Dear Mr. Smith:
SUBJECT:
LOSS OF DECAY HEAT REMOVAL We have just issued Generic Letter 88-17 which addresses loss of decay heat removal during nonpower operation.
This letter was issued because of the potentially serious consequence of loss of shutdown cooling, concurrent with significant core decay heat.
Further, it is our belief that the industry, as a whole, has not aggressively responded to resolve the concern following its identification in our earlier Generic Letter 87-12, "Loss of Residual Heat Removal While the Reactor Coolant System is Partially Filled."
In particular, the industry's response to the Generic Letter 87-12 was deficient in the areas of:
(1) prevention of accident initiation, (2) mitigation of accidents before they potentially progress to core damage, and (3) control of radioactive material if a core damage accident should occur. Generic Letter 88-17 prescribes expeditious actions which should immediately ease the concern; and parallel, but longer term, programmed enhancements which effectively address the root cause of the problems and permit greater flexibility in operation.
We consider this issue to be of high priority and request that you assure that your organization addresses it accordingly.
Sincerely, original signed b-r Thomas Ea Murley Thomas E. Murley, Director Office of Nuclear Reactor Regulation cc:
See next page LO -SMITH.11/7/88 OFC :kiD f~NRPR:PM: 2:R:PP 21DP:P2:DPRA
- DRPR
- D:DY~.
£X( A)ADP.,\\1N,~c NAME on,:R.VUY:jfw :B.Buckley
- E.
ensa
- G ina arga
- DC'ritchfield:
DATE :11/e /88
- 11/1<188
- 11/9 /88
- 11/ /88
- 11/60 /88
- 11//88
- 10/ /88 OFC
- ADJ:ON R R
NAME :J.
OzeBk GMur ley DATE :11/1 ~88 1 /88 8CT120701r32 a31202 DR aDCK S5000m26i1 PDC:
g g
Mr. S. H. Smith Carolina Power & Light Company H. B. Robinson 2 cc:
Mr. R. E. Jones, General Counsel Mr. Dayne H. Brown, Chief Carolina Power & Light Company Radiation Protection Branch P. 0. Box 1551 Division of Facility Services Raleigh, North CaroTina 27602 Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008 Mr. McCuen Morrell, Chairman Darlington County Board of Supervisors Mr. Robert P. Gruber County Courthouse Executive Director Darlington, South Carolina 29535 Public Staff - NCUC P.O. Box 29520 Mr. H. A. Cole Raleigh, North Carolina 27626-0520 Special Deputy Attorney General State of North Carolina Mr. C. R. Dietz P.O. Box 629 Manager, Robinson Nuclear Project Raleigh, North Carolina 27602 Department H. B. Robinson Steam Electric Plant Mr. D. E. Hollar P. 0. Box 790 Associate General Counsel Hartsville, South Carolina 29550 Carolina Power and Light Company P.O. Box 1551 Mr. E. E. Utley Raleigh, North Carolina 27602 Senior Executive Vice President Carolina Power Supply & Engineering U.S. Nuclear Regulatory Commission and Construction Resident Inspector's Office Carolina Power Company H. B. Robinson Steam Electric Plant Post Office Boc 1551 Route 5, Box 413 Raleigh, North Carolina 27602 Hartsville, South Carolina 29550 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30323 Mr. R. Morgan General Manager H. B. Robinson Steam Electric Plant Post Office Box 790 Hartsville, South Carolina 29550 Mr. Avery Upchurch, Chairman Triangle J Council of Governments 100 Park Drive Post Office Box 12276 Research Triangle Park, NC 27709
Mr. S. H. Smith Carolina Power & Light Company Shearon Harris cc:
Mr. R. E. Jones, General Counsel Ms. Carol Love Carolina Power & Light Company 100 Park Drive P. 0. Box 1551 P.O. Box 12276 Raleigh, North Carolina 27602 Research Triangle Park, NC 27709 Mr. D. E. Hollar Regional Administrator, Region II Associate General Counsel U.S. Nuclear Regulatory Commission Carolina Power & Light Company 101 Marietta Street P.O. Box 1551 Suite 2900 Raleigh, North Carolina 27602 Atlanta, Georgia 30323 Resident Inspector/Harris NPS Mr. C. S. Hinnant c/o U.S. Nuclear Regulatory Commission Plant General Manager Route 1, Box 315B Harris Nuclear Plant New Hill, North Carolina 27562 P.O. Box 165 New Hill North Carolina 27562 Mr. R. A. Watson Mr. Dayne H. Brown, Chief Vice President Radiation Protection Section Harris Nuclear Plant Division of Facility Services P.O. Box 165 N.C. Department of Human Resources New Hill, North Carolina 27562 701 Barbour Drive Raleigh, North Carolina 27603-2008 Mr. E. E. Utley Senior Executive Vice President Power Supply & Engineering and Construction Carolina Power & Light Company Post Office Box 1551 Raleigh, North Carolina 27602