ML14188B340

From kanterella
Jump to navigation Jump to search
Forwards Summary of 870519 Meeting W/Util in Region II Re Resolution of Recently Identified Environ Qualification Issues & Followup on Restart Issues from Safety Sys Functional Insp
ML14188B340
Person / Time
Site: Robinson 
Issue date: 06/09/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML14188B341 List:
References
NUDOCS 8706250090
Download: ML14188B340 (2)


Text

REGULATORY IJORMATION DISTRIBUTION SYS41 (RIDS)

ACCESSION NBR:9706250090 DOC.DATE: 87/06/09 NOTARIZED: NO DOCKET 4 FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000201 AUTH.NAME AUTHOR AFFILIATION REYESL.A, Region 2, Office of Director RECIP.NAME RECIPIENT AFFILIATION UTLEYE.E.

Carolina Power & Light Co.

SUBJECT:

Forwards summary of 870519 meeting w/util in Region II re resolution of recently identified environ qualification issues and followup on restart issues from safety sys functional insp.

DISTRIBUTION CODE: IE45D COPIES RECEIVED:LTR I ENCL I SIZE: _

TITLE: Summary of Significant Meeting with Licensee NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1

0 ECCLESTONK 1

1 INTERNAL: AEOD/DDA 1

1 AEOD/DSP/TPAE 1

1 DEDRO 1

1 NRR/DLPG/GAB 1

1 NRR/DREP/EPB 1

1 B

A ILRB 1

1 OGC/ROED i

i REG FILE 02 1

1 RGN2 FILE 01 1

1 EXTERNAL: LPDR 1

1 NRC PDR 1

1 NSIC 1

1 TOTAL NUMBER OF COPIES REGUIRED: LTTR 14 ENCL 13

JUN9 Carolina Power and Light Company

,ATTN:

Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

MEETING

SUMMARY

- H. B. ROBINSON NUCLEAR PLANT -

DOCKET NO. 50-261 This letter refers to the meeting conducted at our request in the Region II Office on May 19, 1987.

The meeting related to the resolution of recently identified Robinson environmental qualification (EQ) issues and a follow-up on restart issues from the safety system functional inspection (SSFI).

Enclosed is a summary of the meeting topics.

It is our opinion that this meeting was beneficial, and provided for a better understanding of the status of EQ and SSFI restart issues.

In accordance with Section 2.790 of NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosures will be placed in the NRC's Public Document Room.

Should you have any questions concerning this matter, we will be pleased to discuss them.

Sincerely, Original Signed by Luis A. Reyes Luis A. Reyes, Director Division of Reactor Projects

Enclosures:

1. Meeting Summary
2. Attendance List cc w/encls:

0" P. Beatty, Jr., Vice President uclear Projects Department

i. A. McDuffie, Senior Vice President Nuclear Generator (X. F. Morgan, Plant General Manager b c w/encls:

8706250090 870609 RC Resident Inspector PDR ADOCK 05000261 Document Control Desk G

PDR State of South Carolina RII RH RH RI PFr kson:vyg DVir 1i VBrownlee AHerdt 6/7/87 6/ /87 6/ /87 6/

/87 I.E