Summary of 870519 Meeting W/Util in Region II Re Environ Qualification & Safety Sys Functional Insp Followup Issues. Attendance List Also Encl
ML14188B342
Person / Time
Site: Robinson 
Issue date: 06/09/1987
From: Fredrickson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML14188B341 List:
References
NUDOCS 8706250097
Download: ML14188B342 (2)


Text

ENCLOSURE 1 MEETING

SUMMARY

Licensee:

Carolina Power and Light Company Facility: H. B. Robinson Docket:

50-261 License No.:

DPR-23

SUBJECT:

ENVIRONMENTAL QUALIFICATION (EQ) AND SAFETY SYSTEM FUNCTIONAL INSPECTION (SSFI) FOLLOW-UP ISSUES A meeting was held in the NRC Region II Office on May 19, 1987, to discuss Robinson EQ and SSFI issues prior to plant start-up.

The licensee discussed the on-going activities involved in the EQ Program.

A detailed discussion was conducted on the containment cable qualification verification effort, specifically addressing the scope of the task, documentation reviews, walkdowns and evaluations.

The end product of this effort is the establishment of reasonable assurance that qualified cable is in place inside containment.

The licensee also addressed the EQ work being performed prior to criticality in the following areas: Crouse Hinds connectors, pigtail splices, conduit seals, and Raychem splices.

The licensee completed their presentation with a brief discussion on the status of two SSFI issues: station battery sizing and EDG room ventilation.

The NRC concluded the meeting by stating that the overall EQ and SSFI effort appeared to be progressing satisfactorily, but that the containment cable qualification verification effort appeared to need more research prior to restart.

An agreement was reached to maintain close contact between CP&L and the NRC as this issue progressed.

. E.

redrickson, Chief Ddte Projects Section 1A Reactor Projects Branch 1 Division of Reactor Projects 87RO625O97 870609 PO ADOCK O0o6 05000261 PDR?

ENCLOSURE 2 ATTENDANCE LIST Attendance at the Carolina Power and Light - NRC meeting May 19, 1987, at the Region II Office.

Carolina Power and Light Company G. P. Beatty, Vice President - Nuclear Project M. A. McDuffie, Senior Vice President - Nuclear Generation W. J. Flanagan, Manager -

Design Engineering J. M. Curley, Director -

Regulatory Compliance A. R. Wallace, Manager -

Technical Support NRC Region II M. L. Ernst, Deputy Regional Administrator L. A. Reyes, Director, Division of Reactor Projects (DRP)

P. E. Fredrickson, Section Chief, Projects Section 1A, DRP H. E. Krug, Senior Resident Inspector - H. B. Robinson S. J. Vias, Project Engineer, Projects Section 1A, DRP C. A. Julian, Branch Chief, Operations Branch, Division of Reactor Safety (DRS)

A. R. Herdt, Branch Chief, Engineering Branch, DRS M. B. Symlock, Section Chief, Operational Programs Section, DRS T. E. Conlon, Section Chief, Plant Systems Section, DRS P. J. Fillion, Reactor Inspector, DRS M. D. Hunt, Reactor Inspector, DRS G. R. Jenkins, Director, Enforcement and Investigation Coordination Staff NRC - Headquarters G. C. Lainas, Assistant Director for Region II Reactors, NRR K. T. Eccleston, Project Manager - Robinson, NRR R. C. Wilson, Engineer, Vendor Inspection Branch P. Milano, Reactor Engineer, Office of Enforcement