ML14183A249
| ML14183A249 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 04/09/1993 |
| From: | Jeffrey Mitchell Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML14183A250 | List: |
| References | |
| DPR-23-A-146 NUDOCS 9304210381 | |
| Download: ML14183A249 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
146 License No. DPR-23
- 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Carolina Power & Light Company (the licensee), dated November 27, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 3.B. of Facility Operating License No. DPR-23 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 146, are hereby incorporated in the license.
Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.
9304210381 930419 PDR ADOCK 05000261 P
PDR j
AMENDMENT NO. 146 TO FACILITY OPERATING LICENSE NO. DPR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DISTRIBUTION:
C p Ic c ke t Fil-e NRC/Local PDRs PD II-1 Reading File S. Varga J. A. Mitchell B. L. Mozafari P. D. Anderson R. Jones 8-E-23 OGC D. Hagan MNBB 3302 G. Hill (2) P1-37 Wanda Jones P-130 C. Grimes 11-E-22 ACRS (10)
OPA OC/LFDCB E. Merschoff, R-II cc:
Robinson Service List 210101
-2
- 3.
This license amendment is effective as of the date of its issuance and shall be.implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION Jo, lyn A. Mitchell, Acting Project Director Project Directorate II-I Division of Reactor Projects -
I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 19,1993
ATTACHMENT TO LICENSE AMENDMENT NO. 146 FACILITY OPERATING LICENSE NO. DPR-23 DOCKET NO. 50-261 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised areas are indicated by marginal lines.
Remove Pages Insert Pages 3.3-3 3.3-3 3.3-5 3.3-5
- i. Power operation with less than three loops in service is prohibited.
3.3.1.2 During power operation, the requirements of 3.3.1.1 may be modified to allow any one of the following components to be inoperable. If the system is not restored to meet the requirements of 3.3.1.1 within the time period specified, the reactor shall be placed in the hot shutdown condition utilizing normal operating procedures.
If the requirements of 3.3.1.1 are not satisfied within an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, the reactor shall be placed in the cold shutdown condition utilizing normal operating procedures.
- a. One accumulator may be isolated or otherwise inoperable relative to the requirements of 3.3.1.1.b for a period not to exceed four hours.
- b. If one safety injection pump becomes inoperable during normal reactor operation, the reactor may remain in operation for a period not to exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, provided the remaining safety injection pump is demonstrated to be operable prior to initiating repairs.
- c. If one residual heat removal pump becomes inoperable during normal reactor operation, the reactor may remain in operation for a period not to exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, provided the other residual heat removal pump is demonstrated to be operable prior to initiating repairs.
3.3-3 Amendment No. 97, M1i 110, 146
3.3.1.3 When the reactor is in the hot shutdown condition, the requirements of 3.3.1.1 and 3.3.1.2 shall be met.
Except that the accumulators may be isolated or otherwise inoperable relative to the requirements of 3.3.1.1.b. In addition, any one component as defined in 3.3.1.2 may be inoperable for a period equal to the time period specified in the subparagraphs of 3.3.1.2 plus 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, after which the plant shall be placed in the cold shutdown condition utilizing normal operating procedures. The safety injection pump power supply breakers must be racked out when the reactor coolant system temperature is below 350OF and the system is not vented to containment atmosphere.
3.3.1.4 When the reactor is in the cold shutdown condition (except refueling operation when Specification 3.8.1.e applies), both residual heat removal loops must be operable.
Except that either the normal or emergency power source to both residual heat removal loops may be inoperable.
- a.
If one residual heat removal loop becomes inoperable during cold shutdown operation, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> verify the existence of a method to add make-up water to the reactor coolant system such as charging pumps, safety injection pumps (under adequate operator control to prevent system overpressurization), or primary water (if the reactor coolant system is open for maintenance) as back-up decay heat removal method. Restore the inoperable RHR loop to operable status within 14 days or prepare and submit a Special Report to the Commission within the next 30 days outlining the action taken, the cause of the inoperability, and the plans and schedule for restoring the loop to operable status.
- b.
If both residual heat removal loops become inoperable during cold shutdown operation, close all containment penetrations providing direct access from the containment atmosphere to the outside atmosphere prior to the reactor coolant average temperature exceeding 200 0F, restore at least one residual 3.3-5 Amendment No. 89.
146