PRIORITY 2
REGULATORY +/-NiFRO W DISTIUTION SYSTEM (RIDS)
ACCESSION NBR:9407290380
DOC.DATE: 94/07/11
NOTARIZED: NO
DOCKET #
O~ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C
05000261
AUTH.NAME
AUTHOR AFFILIATION
ERSCHOFF,E.W.
Region 2 (Post 820201)
RECIP.NAME
RECIPIENT AFFILIATION
HANNANT,S.
Carolina Power & Light Co.
SUBJECT: Forwards insp rept 50-261/94-16 on 940524-0624 & notice of
violation.Violations involve failure to take adequate
CA re issues identified by contractor.
DISTRIBUTION CODE: IE01D
COPIES RECEIVED:LTR I ENCL _
SIZE:q
4 3
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID.CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
MOZAFARI,B
1
1
INTERNAL: AEOD/DEIB
1
1
AEOD/DSP/ROAB
1
1
AEOD/DSP/TPAB
1
1
AEOD/TTC
1
1.
DEDRO
1
1
NRR/DORS/OEAB
1
1
NRR/DRCH/HHFB
1
1
NRR/PMAS/IRCB-E
1
1
NUDOCS-ABSTRACT
1
1
OE-DIR
1
1
OGC/HDS3
1
1
REG FILE
02
1
1
RES/HFB
1
1
1R3 N2--I-FLE 01
1
1
ERNAL: EG&G/BRYCE,J.H.
1
1
NRC PDR
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL
DESK, ROOM P1-37 (EXT 504-2083) TO ELIMINATE YOUR NAME FROM
DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
19
ENCL
19
JUL 111994
Docket No.:
50-261
License No.:
EA 94-119
Carolina Power and Light Company
ATTN: Mr. S. Hinnant
Vice President
H. B. Robinson Steam Electric Plant, Unit 2
P. 0. Box 790
Hartsville, SC 29550-0790
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-261/94-16)
This refers to the inspection conducted by W. T. Orders of this office on
May 22 - June 24, 1994. The inspection included a review of activities
authorized for your H. B. Robinson facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements as specified in the enclosed Notice of
Violation (Notice).
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response. In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
Also identified in this report are three apparent violations of NRC
requirements which are being considered for escalated enforcement action in
accordance with the "General Statement of Policy and Procedure for NRC
Enforcement Action" (Enforcement Policy), 10 CFR Part 2, Appendix C. The
apparent violations involve a failure to take adequate corrective action
pertaining to issues identified by a contractor, inadequate testing of the
control room ventilation system, and inadequate corrective actions pertaining
.
to a main steam isolation valve design deficiency.
9407290380 940711
PDR ADOCK 05000261
0
JUL II
1994
Carolina Power and Light Company
2
An enforcement conference to discuss these apparent violations has been
scheduled for July 26, 1994. The decision to hold an enforcement conference
does not mean that the NRC has determined that a violation has occurred or
that enforcement action will be taken. The purposes of this conference are to
discuss the apparent violations, the cause and safety significance, to provide
you the opportunity to point out any errors in our inspection report, and to
provide you the opportunity to present your proposed corrective actions. In
addition, this is an opportunity for you to provide any information concerning
your perspectives on 1) the severity of the violation, 2) the application of
the factors the NRC considers when it determines the amount of a civil penalty
that may be assessed in accordance with Section VI.B.2 of the Enforcement
Policy, and 3) any other application of the Enforcement Policy to this case,
including the exercise of discretion in accordance with Section VII of the
Enforcement Policy. You will be advised in separate correspondence of the
results of our deliberations on this matter. No response regarding these
apparent violations is required at this time.
This enforcement conference will be closed to public observation.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of
this letter and its enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Ellis W. Merschoff, Director
Division of Reactor Projects
Enclosures:
2. NRC Inspection Report
cc w/encls:
M. P. Pearson
Plant Manager
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC 29550
H. W. Habermeyer, Jr.
Vice President
Nuclear Services Department
Carolina Power & Light Company
P. 0. Box 1551
- Mail OHS7
Raleigh, NC 27602
(cc w/encls cont'd - See page 2)
JUL 1 11994
Carolina Power and Light Company
3
(cc w/encls cont'd)
R. Krich, Manager
Regulatory Compliance
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC 29550
Max Batavia, Chief
Bureau of Radiological Health
Dept. of Health and Environmental
Control
2600 Bull Street
Columbia, SC 29201
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environment,
Commerce & Natural Resources
P. 0. Box 27687
Raleigh, NC
27611-7687
H. Ray Starling
Manager -
Legal Department
.
Carolina Power and Light Co.
P. 0. Box 1551
Raleigh, NC
27602
Karen E. Long
Assistant Attorney General
State of North Carolina
P. 0. Box 629
Raleigh, NC
27602
Robert P. Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh, NC 27626-0520
Public Service Commission
State of South Carolina
P. 0. Box 11649
Columbia, SC 29211
bcc:
(See page 4)
JUL II 1994
Carolina Power and Light Company
4
bcc w/encls:
J. Lieberman, OE
H. Christensen, RH
B. Mozafari, NRR
Document Control Desk
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
Route 5, Box 413
Hartsville, SC 29550
SEND
OFC
RII:DRP
r,
RII:DRP
RII:DRP
RII:EICS
TO
NAME
JStarefos:tj
WOrders
HChristensen
BUryc
PDR?
DATE
07/
/94
07/ R,/94
07/ q/94
07/6/94/
/94
No COPY?
No
No
es
No
No
Yes
No
OFFICIAL RECORD COPY
DOCUMENT NAME:
P:\\ROB94- 6.RPT
%