Text
ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
W
ESSION NBR:8909150119
DOC.DATE: 89/09/01 NOTARIZED: NO
DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C
05000261
AUTH.NAME
AUTHOR AFFILIATION
VERRELLI,D.M.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
EURY,L.W.
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/89-13 on 890711-0810.No violations
or deviations noted.
DISTRIBUTION CODE: IE01D
COPIES RECEIVED:LTR
ENCL j SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID
CODE/NAME
LTTR ENCL
ID
CODE/NAME
LTTR ENCL
A
PD2-1 PD
1
1
LO,R
1
1
r:
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
AEOD/TPAD
1
1
DEDRO
1
1
LOIS,ERASMIA
1
1
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
NRR/DLPQ/PEB
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/PMAS/ILRB12
1
1
NUDOCS-ABSTRACT
1
1
N,J
1
1
OGC/HDS1
1
1
EG
02
1
1
RES MORISSEAU,D
1
1
RGN2
FILE
01
1
1
W
RNAL: LPDR
1
1
NRC PDR
1
1
1
1
IR
S
NOrE TO ALL "RIDE" RECIPIENTS:
C
PLEASE
EP US TO REDUCEEISE!
CDTACT THE DOCUMT C=RL DESK,
ROOM P1-37 (EXT.
20079) TO ELIMINATE YOUR NAME FRO
DISIRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED-: LTTR
24
ENCL
24
III)0
Docket No:
50-261
License No:
Carolina Power and Light Company
ATTN:
Mr. Lynn W. Eury
Executive Vice President
Power Supply
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/89-13
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
L. W. Garner on July 11, 1989 - August 10, 1989.
The inspection included a
review of activities authorized for your H. B. Robinson facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel,
and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/encl:
(See page 2)
(III)
Carolina Power and Light Company
2
'Q
cc w/encl:
C. R. Dietz, Manager Robinson
Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encl:
NRC Resident Inspector
Document Control Desk
RII:DRP ,
RII:DRP
BCarrol l
HDance
08/
/89
PS/, /89
,i