ML14176A756
| ML14176A756 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 08/25/1989 |
| From: | Dan Collins NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Eury L Carolina Power & Light Co |
| Shared Package | |
| ML14176A757 | List: |
| References | |
| NUDOCS 8909110275 | |
| Download: ML14176A756 (3) | |
See also: IR 05000261/1989014
Text
ACCELERATED
D]STPJBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:8909110275
DOC.DATE: 89/08/25 NOTARIZED: NO
DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
COLLINS,D.M.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
EURY,L.W._
Carolina Power & Light Co.
SUBJECT: Forwards Insp Rept 50-261/89-14 on 890731-0804.No violations
or deviations noted.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR o
ENCL/
SIZE:
TITLE: General (50 Dkt)-Insp Rdpt/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
LO,R
1
1
INTERNAL: AEOD
1
1
AEOD/DEIIB
1
1
AEOD/TPAD
1
1
DEDRO
1
1
LOIS,ERASMIA
1
1
NRR SHANKMAN,S
1
1
NRR/DEST DIR
1
1
NRR/DLPQ/PEB
1
1
NRR/DOEA DIR 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
2
2
NRR/PMAS/ILRBl2
1
1
NUDOCS-ABSTRACT
1
1
,J
1
1
OGC/HDS1
1
1
02
1
1
RES MORISSEAU,D
1
1
RGN2
FILE
01
1
1
- RNAL:
LPDR
1
1
NRC PDR
1
1
1
1
IR
C
NorE TO ALL "RIDS" RECIPIE1TS:
PLEASE E
US TO rEDU= MO!
CONITACT THE DOCUMN
CDNTRL DESK,
ROCM P1-37 (EXT.
20079) TO ELIDM
YOUR NWME FRI(
DISTRII
LISTS POR DOCOMENS YOU DON'T NEEI
TAL NUMBER OF COPIES REQUIRED: LTTR
24
ENCL
24
AUP7 2.5 18
Docket No. .50-261
License No. DPR-23
Carolina Power and Light Company
ATTN:
Mr. Lynn W. Eury
Executive Vice President
Power Supply
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/89-14
This refers to the Nuclear Regulatory Commission (NRC)
inspection conducted by
C. A. Hughey on July 31 - August 4, 1989. The inspection included a review of
activities authorized for your H. B. Robinson facility.
At the conclusion of
the inspection, the findings were discussed with those members of' your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records,
interviews with personnel,
and observation of
activities in progress.
Within the scope of the inspection,
no violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations, a copy of this letter and its enclosure.
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Douglas M. Collins, Chief
Radiological Protection Branch
Division of Radiation Safety
and Safeguards
Enclosure:
NRC Inspection Report
cc w/encl:
(See page 2)
-7-j
-7
7
6Z
Carolina Power and Light Company
2
cc w/encl:
C. R. Dietz, Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
State of South Carolina
bcc w/encl:
NRC Resident Inspector
Document Control Desk
DRSS
R1,;pRSS
RII:DRP
/CHughey
TDecker
HDance
O v
v8/:789
'98/
789
8JA/89