Forwards Insp Rept 50-261/86-03 on 860201-03.No Violations or Deviations Noted
ML14175B357
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/03/1986
From: Panciera V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML14175B358 List:
References
NUDOCS 8603110189
Download: ML14175B357 (1)


See also: IR 05000261/1986003

Text

MAR 0 3 1986

Carolina Power and Light Company

yATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

REPORT NO. 50-2614

On February 1-3,

1986,

NRC inspected activities authorized by NRC Operating

License No.

DPR-23 for your H. B. Robinson facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas,

the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Vincent W. Panciera, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-261/86-03

cc w/encl:

vG.

P. Beatty, Jr., Manager

Robinson Nuclear Project Department

vk. E. Morgan, Plant General Manager

bcc w/encl:

LIRC Resident Inspector

Document Control Desk

.

State of South Carolina

RII

RH

RII

KVanDyne:bhg

FJae

AHer t

2/2(/86

2/4V./86

f./86

96031'10189 9603037

PDR

ADOCK 05000261

Q

-

PDI