ML14175B354

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/86-02 on 860121-24.No Violations or Deviations Noted
ML14175B354
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/11/1986
From: Panciera V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML14175B355 List:
References
NUDOCS 8602180099
Download: ML14175B354 (1)


See also: IR 05000261/1986002

Text

February 11, 1986

Carolina Power and Light Company

vATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

REPORT NO. 50-261/

On January 21-24,

1986,

NRC inspected activities authorized by NRC Operating

License No.

DPR-23 for your H. B. Robinson facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff identi

fied in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas,

the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(original signed by VPanciera)

Vincent W. Panciera, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-261/86-02

pc w/encl:

VG.

P. Beatty, Jr., Manager

Robinson Nuclear Project Department

VP. E. Morgan, Plant General Manager

bcc w/encl:

,WC Resident Inspector

Document Control Desk

State of South Carolina

Rh

RI

RIL,

RLatta:cdg

ABelisle

CJulian

Me

02//e/86

02//o/86

02//0/86

02111 /86

2/(1 /86

8602180099 860211

PDR ADOCK 05000261

Q

PDR