ML14175B258
| ML14175B258 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 01/19/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14175B256 | List: |
| References | |
| NUDOCS 8103160790 | |
| Download: ML14175B258 (2) | |
See also: IR 05000261/1980036
Text
pR Eo,
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION il
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
JAN 1 9 1981
Carolina Power and Light Company
ATTN:
J. A. Jones
Senior Executive Vice President and
Chief Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
Subject:
Inspection Report No. 50-261/80-36
This refers to the routine safety inspection conducted by A. K. Hardin of this
office on November 4-7, 1980, of activities authorized by NRC Operating License
No.
DPR-23 for the H. B. Robinson facility.
Our preliminary findings were
discussed with R. B. Starkey at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
.
During the inspection, it
was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
Elements to be included in your response-are delineated in Appendix A.
During the inspection it
was found that certain activities under your license
appear to deviate from commitments to the Commission and have safety significance.
This item identified in the Notice of Deviation enclosed herewith as Appendix B.
Please provide us in writing your comments including a description of corrective
actions that have been or will be taken, corrective actions which will be taken
to avoid further deviations, and the date your corrective actions will be completed.
In accordance with Section 2.790 of the NRC "Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC Public Document Room. If this report contains
any information that you believe to be proprietary, it
is necessary that you
make a written application within 20 days to this office to withhold such informa
tion from public disclosure.
Any such application must include the basis for
claiming that the information is proprietary and the proprietary information
should be contained in a separate part of thw
document. If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
8108160790
Carolina Power and Light Company
-2-J
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
R.
C. 4ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
Inspection Report No. 50-261/.80-36
cc w/encl:
R. B. Starkey, Jr., Plant Manager