ML14175B258

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-261/80-36 on 801104-07 & Notices of Violation & Deviation
ML14175B258
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/19/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML14175B256 List:
References
NUDOCS 8103160790
Download: ML14175B258 (2)


See also: IR 05000261/1980036

Text

pR Eo,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION il

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

JAN 1 9 1981

Carolina Power and Light Company

ATTN:

J. A. Jones

Senior Executive Vice President and

Chief Operating Officer

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

Subject:

Inspection Report No. 50-261/80-36

This refers to the routine safety inspection conducted by A. K. Hardin of this

office on November 4-7, 1980, of activities authorized by NRC Operating License

No.

DPR-23 for the H. B. Robinson facility.

Our preliminary findings were

discussed with R. B. Starkey at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

.

During the inspection, it

was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appendix A.

Elements to be included in your response-are delineated in Appendix A.

During the inspection it

was found that certain activities under your license

appear to deviate from commitments to the Commission and have safety significance.

This item identified in the Notice of Deviation enclosed herewith as Appendix B.

Please provide us in writing your comments including a description of corrective

actions that have been or will be taken, corrective actions which will be taken

to avoid further deviations, and the date your corrective actions will be completed.

In accordance with Section 2.790 of the NRC "Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC Public Document Room. If this report contains

any information that you believe to be proprietary, it

is necessary that you

make a written application within 20 days to this office to withhold such informa

tion from public disclosure.

Any such application must include the basis for

claiming that the information is proprietary and the proprietary information

should be contained in a separate part of thw

document. If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

8108160790

Carolina Power and Light Company

-2-J

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

R.

C. 4ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Appendix B, Notice of Deviation

3.

Inspection Report No. 50-261/.80-36

cc w/encl:

R. B. Starkey, Jr., Plant Manager