APPENDIX A NOTICE OF VIOLATION Carolina Power and Light Company Docket No. 50-261 H. B. Robinson 2 License No. DPR-23 As a result of the inspection conducted on November 4-7, 1980, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified.
Technical Specification 6.8.1 requires that written procedures and admini strative policies shall be established, implemented and maintained that meet or exceed the requirements and recommendations of Sections 5.1 and 5.3 of ANSI N18.7-1972 and Appendix "A" of USNRC Regulatory Guide 1.33 dated November 3, 1972, except as provided in 6.8.2 and 6.8.3 below.
Contrary to the above, written procedures were not established, implemented, or maintained in that no procedure for operation of the subcooling meter had been prepared.
This is a Severity Level V Violation (Supplement 1).
Pursuant to the provisions of 10 CFR 2.201, Carolina Power and Light Company is hereby required to submit to this office within.twenty-five days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
JAN 1 9 1981 Date: