Forwards IE Insp Rept 50-261/80-30 on 800930-1009 & Notice of Violation
ML14175B252
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/13/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML14175B250 List:
References
NUDOCS 8103050160
Download: ML14175B252 (2)


See also: IR 05000261/1980030

Text

0

UNITED STATES

0

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

In Reply Refer To:

JAN 13 198

RII:WTO

50-261/80-30

Carolina Power and Light Company

ATTN:

J. A. Jones

Senior Executive Vice President and

Chief Operating Officer

411 Fayetteville Street

Raleigh, NC

27602

Gentlemen:

This refers to the inspection conducted by W. T. Orders of this office on

September 30 - October 9,

1980,

of activities authorized by NRC

Operating

License No. DPR-23 for the H. B. Robinson facility, and to the discussion of our

findings held with R. Starkey at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed

inspection report.

Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with personnel,

and observations by the inspector.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report.

This item will be examined during subsequent inspections.

During the inspection, it

was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A. This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regula

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it

is

claimed that the information is proprietary,

and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

JAN1

Carolina Power and Light Company

-2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

R. C. ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-261/80-30

cc w/encl:

R. B. Starkey, Jr., Plant Manager